98-23640. Midcoast Interstate Transmission, Inc.; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 170 (Wednesday, September 2, 1998)]
    [Notices]
    [Pages 46782-46783]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-23640]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-737-000]
    
    
    Midcoast Interstate Transmission, Inc.; Notice of Request Under 
    Blanket Authorization
    
    August 28, 1998.
        Take notice that on August 21, 1998, Midcoast Interstate 
    Transmission, Inc. (Midcoast) 3230 Second Street, Muscle Shoals, 
    Alabama 35661, filed in Docket No. CP98-737-000 a request pursuant to 
    Sections 157.205 and 157.211 of the Commission's Regulations under the 
    Natural Gas Act (18 CFR 157.205 and 157.211) for authorization to 
    install and operate two new delivery points in Limestone County, 
    Alabama, under Midcoast's blanket certificate issued in Docket No. 
    CP85-359-000 pursuant to Section 7 of the Natural Gas Act, all as more 
    fully set forth in the request that is on file with the Commission and 
    open to public inspection.
        Midcoast proposes to install and operate the facilities to 
    accommodate natural gas deliveries to the City of Athens Utilities 
    Department (Athens). Transportation service for Athens will be provided 
    pursuant to Rate Schedule FT of Midcoast's FERC Gas Tariff, Second 
    Revised Volume No. 1. The two new delivery points will be known as 
    Athens #2 and Athens #3. Midcoast will install, own and operate all 
    facilities.
        Midcoast states that this addition is not prohibited by its 
    existing tariff, that there is sufficient capacity to accomplish 
    deliveries without detriment or disadvantage to other customers, that 
    its peak day and annual deliveries will not be affected and that the 
    total volumes delivered will not exceed the total volumes authorized 
    prior to this request.
        Any person or the Commission's staff may, within 45 days after 
    issuance of
    
    [[Page 46783]]
    
    the instant notice by the Commission, file pursuant to Rule 214 of the 
    Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or 
    notice of intervention and pursuant to Section 157.205 of the 
    Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the 
    request. If no protest is filed within the time allowed therefor, the 
    proposed activity shall be deemed to be authorized effective the day 
    after the time allowed for filing a protest. If a protest is filed and 
    not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 98-23640 Filed 9-1-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
09/02/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-23640
Pages:
46782-46783 (2 pages)
Docket Numbers:
Docket No. CP98-737-000
PDF File:
98-23640.pdf