98-23640. Midcoast Interstate Transmission, Inc.; Notice of Request Under Blanket Authorization
[Federal Register Volume 63, Number 170 (Wednesday, September 2, 1998)]
[Notices]
[Pages 46782-46783]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-23640]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP98-737-000]
Midcoast Interstate Transmission, Inc.; Notice of Request Under
Blanket Authorization
August 28, 1998.
Take notice that on August 21, 1998, Midcoast Interstate
Transmission, Inc. (Midcoast) 3230 Second Street, Muscle Shoals,
Alabama 35661, filed in Docket No. CP98-737-000 a request pursuant to
Sections 157.205 and 157.211 of the Commission's Regulations under the
Natural Gas Act (18 CFR 157.205 and 157.211) for authorization to
install and operate two new delivery points in Limestone County,
Alabama, under Midcoast's blanket certificate issued in Docket No.
CP85-359-000 pursuant to Section 7 of the Natural Gas Act, all as more
fully set forth in the request that is on file with the Commission and
open to public inspection.
Midcoast proposes to install and operate the facilities to
accommodate natural gas deliveries to the City of Athens Utilities
Department (Athens). Transportation service for Athens will be provided
pursuant to Rate Schedule FT of Midcoast's FERC Gas Tariff, Second
Revised Volume No. 1. The two new delivery points will be known as
Athens #2 and Athens #3. Midcoast will install, own and operate all
facilities.
Midcoast states that this addition is not prohibited by its
existing tariff, that there is sufficient capacity to accomplish
deliveries without detriment or disadvantage to other customers, that
its peak day and annual deliveries will not be affected and that the
total volumes delivered will not exceed the total volumes authorized
prior to this request.
Any person or the Commission's staff may, within 45 days after
issuance of
[[Page 46783]]
the instant notice by the Commission, file pursuant to Rule 214 of the
Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or
notice of intervention and pursuant to Section 157.205 of the
Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the
request. If no protest is filed within the time allowed therefor, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 98-23640 Filed 9-1-98; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 09/02/1998
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 98-23640
- Pages:
- 46782-46783 (2 pages)
- Docket Numbers:
- Docket No. CP98-737-000
- PDF File:
-
98-23640.pdf