2012-23221. Commission Information Collection Activities (FERC-912); Comment Request; Extension  

  • Start Preamble

    AGENCY:

    Federal Energy Regulatory Commission.

    ACTION:

    Notice of information collection and request for comments.

    SUMMARY:

    In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-912, Cogeneration and Small Power Production, PURPA Section 210(m) Regulations for Termination or Reinstatement of Obligation to Purchase or Sell.

    DATES:

    Comments on the collection of information are due November 19, 2012.

    ADDRESSES:

    You may submit comments (identified by Docket No. IC12-20-000) by either of the following methods:

    Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: http://www.ferc.gov/​help/​submission-guide.asp. For user assistance contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 (toll-free), or (202) 502-8659 for TTY.

    Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at http://www.ferc.gov/​docs-filing/​docs-filing.asp.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502-8663, and fax at (202) 273-0873.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Title: FERC-912, Cogeneration and Small Power Production, PURPA Section 210(m) Regulations for Termination or Reinstatement of Obligation to Purchase or Sell

    OMB Control No.: 1902-0237

    Type of Request: Three-year extension of the FERC-912 information collection requirements with no changes to the current reporting requirements.

    Abstract: On 8/8/2005, the Energy Policy Act of 2005 (EPAct 2005) [1] was signed into law. Section 1253(a) of EPAct 2005 amends Section 210 of the Public Utility Regulatory Policies Act of 1978 (PURPA) by adding subsection “(m)” that provides for the termination and reinstatement of an electric utility's obligation to purchase and sell energy and capacity. 18 CFR 292.309-292.313 are the implementing regulations that provide procedures for:

    • An electric utility to file an application for the termination of its obligation to purchase energy from a Qualifying Facility (QF) [2] ;
    • An affected entity or person to apply to the Commission for an order reinstating the electric utility's obligation to purchase energy from a QF [3] ;
    • An electric utility to file an application for the termination of its obligation to sell energy and capacity to QFs [4] ; and
    • An affected entity or person to apply to the Commission for an order reinstating the electric utility's obligation to sell energy and capacity to QFs [5] .

    Type of Respondents: FERC-jurisdictional electric utilities.

    Estimate of Annual Burden[6] : The Commission estimates the total Public Reporting Burden for this information collection as:

    Start Printed Page 58366

    FERC-912 (IC12-20-000): Cogeneration and Small Power Production, PURPA Section 210(m) Regulations for Termination or Reinstatement of Obligation to Purchase or Sell

    Number of respondentsNumber of responses per respondentTotal number of responsesAverage burden hours per responseEstimated total annual burden
    (A)(B)(A) × (B) = (C)(D)(C) × (D)
    Termination of obligation to purchase 25151260
    Reinstatement of obligation to purchase 31111313
    Termination of obligation to sell 41111212
    Reinstatement of obligation to sell 51111313
    Total98

    The total estimated annual cost burden to respondents is $6762.94 [98 hours ÷ 2080 [7] hours per year = 0.047 * 143,540/years [8] = $6762.94]

    Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology.

    Start Signature

    Dated: September 14, 2012.

    Kimberly D. Bose,

    Secretary.

    End Signature End Supplemental Information

    Footnotes

    1.  Public Law 109-58, 119 Stat. 594 (2005)

    Back to Citation

    2.  Contained within 18 CFR 292.310.

    Back to Citation

    3.  Contained within 18 CFR 292.311.

    Back to Citation

    4.  Contained within 18 CFR 292.312.

    Back to Citation

    5.  Contained within 18 CFR 292.313.

    Back to Citation

    6.  The Commission defines burden as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collection burden, reference 5 Code of Federal Regulations 1320.3.

    Back to Citation

    7.  2080 hours/year = 40 hours/week * 52 weeks/year.

    Back to Citation

    8.  Average annual salary per employee in 2012.

    Back to Citation

    [FR Doc. 2012-23221 Filed 9-19-12; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Comments Received:
0 Comments
Published:
09/20/2012
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Action:
Notice of information collection and request for comments.
Document Number:
2012-23221
Dates:
Comments on the collection of information are due November 19, 2012.
Pages:
58365-58366 (2 pages)
Docket Numbers:
Docket No. IC12-20-000
PDF File:
2012-23221.pdf