2018-20448. Air Quality State Implementation Plans; Approvals and Promulgations: Infrastructure Monitoring Requirements for the 2008 Pb, 2010 SO2  

  • Start Preamble

    AGENCY:

    Environmental Protection Agency (EPA).

    ACTION:

    Final rule.

    SUMMARY:

    The Environmental Protection Agency (EPA) is approving elements of State Implementation Plan (SIP) revisions from the State of Utah to demonstrate the State meets infrastructure monitoring requirements of the Clean Air Act (Act or CAA) for the National Ambient Air Quality Standards (NAAQS) promulgated for lead (Pb) on October 15, 2008, nitrogen dioxide (NO2) on January 22, 2010, sulfur dioxide (SO2) on June 2, 2010, and fine particulate matter (PM2.5) on December 14, 2012. The EPA is taking this action pursuant to section 110 of the Clean Air Act (CAA).

    DATES:

    This rule is effective on October 22, 2018.

    ADDRESSES:

    The EPA has established a docket for this action under Docket ID No. EPA-R08-OAR-2018-0388-0001. All documents in the docket are listed on the http://www.regulations.gov website. Although listed in the index, some information is not publicly available, e.g., CBI or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the internet and will be publicly available only in hard copy form. Publicly available docket materials are available through http://www.regulations.gov,, or please contact the person identified in the For Further Information Contact section for additional availability information.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Kate Gregory, Air Program, U.S. Environmental Protection Agency (EPA), Region 8, Mail Code 8P-AR, 1595 Wynkoop Street, Denver, Colorado 80202-1129, (303) 312-6175, gregory.kate@epa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Throughout this document “we,” “us,” and “our” means the EPA.

    I. Background

    The background for this action is discussed in detail in our July 23, 2018 proposal (83 FR 34816). In that document we proposed to approve the State's submittal in reference to infrastructure requirements for CAA section 110(a)(2)(B), element B: Ambient air quality monitoring/data system. In the proposal, we find that Utah's SIP and practices are adequate for the Start Printed Page 47567ambient air quality monitoring and data system requirements and therefore propose to approve the infrastructure SIP for the 2008 Pb, 2010 SO2, 2010 NO2 and 2012 PM2.5 NAAQS for this element.

    II. Response to Comments

    The EPA received six anonymous comments on the proposal. After reviewing the comments, the EPA has determined that the comments are outside the scope of our proposed action or fail to identify any material issue necessitating a response. All comments received on this action are available for review in the docket for this rulemaking. This rule will be finalized as proposed without revisions.

    III. Final Action

    We are approving infrastructure element B for the 2008 Pb, 2010 SO2, 2010 NO2 and 2012 PM2.5 NAAQS from the State's certifications as shown in Table 1.

    Table 1—List of Utah Infrastructure Elements That the EPA Is Approving

    ApprovalElement
    January 19, 2012 submittal—2008 Pb NAAQS(B)
    January 31, 2013 submittal—2010 NO2 NAAQS(B)
    June 2, 2013 submittal—2010 SO2 NAAQS(B)
    December 4, 2015 submittal—2012 PM2.5 NAAQS(B)

    For the basis of our approval, please refer to the July 23, 2018 proposal (83 FR 34816).

    IV. Statutory and Executive Order Reviews

    Under the Clean Air Act, the Administrator is required to approve a SIP submission that complies with the provisions of the Act and applicable federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, the EPA's role is to approve state choices, provided that they meet the criteria of the Clean Air Act. Accordingly, this action merely approves state law as meeting federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action:

    • Is not a “significant regulatory action” subject to review by the Office of Management and Budget under Executive Orders 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011);
    • Is not an Executive Order 13771 (82 FR 9339, February 2, 2017) regulatory action because SIP approvals are exempted under Executive Order 12866;
    • Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
    • Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.);
    • Does not contain any unfunded mandate or significantly or uniquely affect small governments, described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4);
    • Does not have federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999);
    • Is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);
    • Is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001);
    • Is not subject to requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the CAA; and
    • Does not provide the EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994).

    In addition, the SIP is not approved to apply on any Indian reservation land or in any other area where EPA or an Indian tribe has demonstrated that a tribe has jurisdiction. In those areas of Indian country, the rule does not have tribal implications and will not impose substantial direct costs on tribal governments or preempt tribal law as specified by Executive Order 13175 (65 FR 67249, November 9, 2000).

    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. The EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal Register. This action is not a “major rule” as defined by 5 U.S.C. 804(2).

    Under section 307(b)(1) of the Clean Air Act, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by November 19, 2018. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this action for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action may not be challenged later in proceedings to enforce its requirements. (See section 307(b)(2).)

    Start List of Subjects

    List of Subjects in 40 CFR Part 52

    • Environmental protection
    • Air pollution control
    • Carbon monoxide
    • Incorporation by reference
    • Intergovernmental relations
    • Greenhouse gases
    • Lead
    • Nitrogen dioxide
    • Ozone
    • Particulate matter
    • Reporting and recordkeeping requirements
    • Sulfur oxides
    • Volatile organic compounds
    End List of Subjects Start Signature

    Dated: September 14, 2018.

    Douglas Benevento,

    Regional Administrator, Region 8.

    End Signature

    40 CFR part 52 is amended to follows:

    Start Part

    PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

    End Part Start Amendment Part

    1. The authority citation for part 52 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 42 U.S.C. 7401 et seq.

    End Authority

    Subpart TT—Utah

    Start Amendment Part

    2. Section 52.2355 is amended by adding paragraph (d) to read as follows:

    End Amendment Part
    Section 110(a)(2) infrastructure requirements.
    * * * * *

    (d) The Utah Department of Environmental Quality submitted certification of Utah's infrastructure SIP for the 2008 Pb NAAQS on January 19, 2012; 2010 NO2 NAAQS on January 31, 2013; 2010 SO2 NAAQS on June 2, 2013; and 2012 PM2.5 on December 4, 2015. Utah's infrastructure certifications demonstrate how the State, where applicable, has plans in place that meet the requirements of section 110 for the 2008 Pb, 2010 NO2, 2010 SO2 and 2012 PM2.5 NAAQS. The State's Infrastructure SIP for 2008 Pb, 2010 Start Printed Page 47568NO2, 2010 SO2 and 2012 PM2.5 NAAQS is approved with respect to 110(a)(2)(B).

    End Supplemental Information

    [FR Doc. 2018-20448 Filed 9-19-18; 8:45 am]

    BILLING CODE 6560-50-P

Document Information

Effective Date:
10/22/2018
Published:
09/20/2018
Department:
Environmental Protection Agency
Entry Type:
Rule
Action:
Final rule.
Document Number:
2018-20448
Dates:
This rule is effective on October 22, 2018.
Pages:
47566-47568 (3 pages)
Docket Numbers:
EPA-R08-OAR-2018-0388-0001, FRL-9983-73-Region 8
Topics:
Air pollution control, Carbon monoxide, Environmental protection, Greenhouse gases, Incorporation by reference, Intergovernmental relations, Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting and recordkeeping requirements, Sulfur oxides, Volatile organic compounds
PDF File:
2018-20448.pdf
Supporting Documents:
» C receipts
» Utah AMNP 2017 approval
» UT 2012 PM25 Certification 2015-Dec-22
» UT 2010 SO2 Certification 2013-June-02
» UT 2010 NO2 Certification 2012-Dec-12
» UT 2008 Pb Certification 2012-Jan-19
» 81 FR 50626
CFR: (1)
40 CFR 52.2355