2018-20553. Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests: Aquenergy Systems, LLC
-
Start Preamble
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2883-009.
c. Date filed: May 30, 2018.
d. Applicant: Aquenergy Systems, LLC.
e. Name of Project: Fries Hydroelectric Project.
f. Location: On the New River in the Town of Fries, Grayson County, Virginia. No federal lands are occupied by the project works or located within the project boundary.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Ms. Beth E. Harris, P.E., Southeast Regional Manager, Enel Green Power North America, Inc., 11 Anderson Street, Piedmont, SC 29673, Phone: (864) 846-0042 ext. 100, Email: Start Printed Page 47918 beth.harris@enel.com, or Mr. Kevin Webb, Hydro Licensing Manager, Enel Green Power North America, Inc., 100 Brickstone Square, Suite 300, Andover, MA 01810, Phone: (978) 935-6039, Email: kevin.webb@enel.com.
i. FERC Contact: Brandi Sangunett, Phone: 202-502-8393, Email: brandi.sangunett@ferc.gov.
j. Deadline for filing motions to intervene and protests: November 13, 2018.
The Commission strongly encourages electronic filing. Please file motions to intervene and protests using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P-2883-009.
The Commission's Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
k. This application has been accepted, but is not ready for environmental analysis at this time.
l. The existing Fries Hydroelectric Project (Fries Project) consists of: (1) A 41-foot-high, 610-foot-long rock masonry dam with a 500-foot-long spillway; (2) an 88-acre impoundment at the normal pool elevation (spillway crest elevation) of 2,188.27 feet National Geodetic Vertical Datum of 1929; (3) an approximately 750-foot-long, 110- foot-wide intake canal with four 15.5-foot-high, 6.5-foot-wide headgates; (4) a canal spillway consisting of 10 stoplog bays totaling 47 feet in length; (5) two 12.5-foot-high, 5.0-foot-wide canal gates; (6) a steel powerhouse that contains a single vertical Kaplan turbine with a capacity of 2.1 megawatts (MW) that discharges into a 180-foot-long, 75-foot-wide, 12-foot-deep tailrace; (7) a masonry powerhouse that contains one vertical and two horizontal Francis turbines with a total capacity of 3.0 MW that discharges into a 180-foot-long, 120-foot-wide, 12-foot-deep tailrace; (8) a 500-foot-long, 450-foot-wide bypassed reach that extends from the toe of the dam to the confluence with the tailraces; (9) a 567-foot-long, 13.2-kilovolt (kV) transmission line that runs from the steel powerhouse to the interconnection point with the grid; (10) a 130-foot-long transmission line that connects the masonry powerhouse to a 5,000 kilovolt-amp step-up transformer and an additional 323-foot-long, 13.2-kV transmission line leading from the transformer to the interconnection point; and (11) appurtenant facilities.
The Fries Project is operated in a run-of-river mode. For the period 2003 through 2016, the average annual generation at the Fries Project was 26,150 megawatt-hours.
m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's website at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above.
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.
n. Anyone may submit a protest or a motion to intervene in accordance with the requirements of the Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application.
All filings must (1) bear in all capital letters the title PROTEST or MOTION TO INTERVENE; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application.
Start SignatureDated: September 14, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-20553 Filed 9-20-18; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 09/21/2018
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2018-20553
- Pages:
- 47917-47918 (2 pages)
- Docket Numbers:
- Project No. 2883-009
- PDF File:
- 2018-20553.pdf