95-23510. Tuscarora Gas Transmission Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 60, Number 184 (Friday, September 22, 1995)]
    [Notices]
    [Page 49272]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-23510]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP95-723-000]
    
    
    Tuscarora Gas Transmission Company; Notice of Request Under 
    Blanket Authorization
    
    September 18, 1995.
        Take notice that on August 31, 1995, Tuscarora Gas Transmission 
    Company (Tuscarora), 6100 Neil Road, P.O. Box 30057, Reno, Nevada 
    89520-3057 filed in Docket No. CP95-723-000, a request pursuant to 
    Section 157.205 of the Commission's Regulations under the Natural Gas 
    Act (18 CFR 157.205) for authorization to construct and operate a new 
    tap and meter station in Washoe County, Nevada, to be known as the La 
    Posada Meter Site, for the delivery of gas to an existing customer, 
    Sierra Pacific Power Company (SPPC), under the blanket certificate 
    issued in Docket No. CP93-685-000, pursuant to Section 7(c) of the 
    Natural Gas Act, all as more fully set forth in the request which is on 
    file with the Commission and open to public inspection.
        Tuscarora proposes to install an 8-inch tap and associated meter at 
    Milepost 217.2 on its mainline in Washoe County, Nevada to establish an 
    additional point for the delivery of natural gas to SPPC, for 
    redelivery and resale to consumers in Reno, Nevada and environs. 
    Tuscarora indicates that construction of the tap will enable SPPC to 
    receive up to 12,000 MMBtu of natural gas directly into the La Posada 
    area of its existing service area. Tuscarora asserts that the 
    construction of this additional delivery point is consistent with 
    Tuscarora's tariff and the total volume to be delivered to SPPC will 
    not exceed the volume previously authorized for delivery to SPPC. 
    Tuscarora states the projected cost of the proposed facilities is 
    $198,000.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Sec. 157.205 of the 
    Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the 
    request. If no protest is filed within the time allowed therefor, the 
    proposed activity shall be deemed to be authorized effective the day 
    after the time allowed for filing a protest. If a protest is filed and 
    not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-23510 Filed 9-21-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
09/22/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-23510
Pages:
49272-49272 (1 pages)
Docket Numbers:
Docket No. CP95-723-000
PDF File:
95-23510.pdf