95-23513. NorAm Gas Transmission Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 60, Number 184 (Friday, September 22, 1995)]
[Notices]
[Page 49271]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-23513]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP95-754-000]
NorAm Gas Transmission Company; Notice of Request Under Blanket
Authorization
September 18, 1995.
Take notice that on September 14, 1995, NorAm Gas Transmission
Company (NGT), P.O. Box 21734, Shreveport, Louisiana 71151, filed a
prior notice request with the Commission in Docket No. CP95-754-000
pursuant to Sections 157.205 of the Commission's Regulations under the
Natural Gas Act (NGA) for authorization to abandon certain pipeline
facilities in Caddo Parish, Louisiana, under NGT's blanket certificate
issued in Docket No. CP82-384-000, et al. pursuant to Section 7 of the
NGA, all as more fully set forth in the request which is open to the
public for inspection.
NGT proposes to abandon 14,627 feet of inactive 4-inch diameter
pipe, an inactive 1-inch tap, and metering facilities on its Line G in
Caddo Parish. NGT states that it no longer needs these inactive
facilities, which were installed in 1950 at pipeline station no. 6+90,
to serve a domestic customer served by its affiliate, Arkla Gas Company
(Arkla). Arkla notified NGT via a letter dated June 14, 1995, that it
concurs with NGT's abandonment of these facilities. NGT states that it
would abandon the pipe and tap in place and remove all above ground
metering facilities. NGT also states that it would cost approximately
$29,676 to abandon these facilities.
Any person or the Commission's staff may, within 45 days after the
Commission has issued this notice, file pursuant to Rule 214 of the
Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or
notice of intervention and pursuant to Section 157.205 of the
Regulations under the NGA (18 CFR 157.205) a protest to the request. If
no protest is filed within the allowed time, the proposed activity
shall be deemed to be authorized effective the day after the time
allowed for filing a protest. If a protest is filed and not withdrawn
within 30 days after the time allowed for filing a protest, the instant
request shall be treated as an application for authorization pursuant
to Section 7 of the NGA.
Lois D. Cashell,
Secretary.
[FR Doc. 95-23513 Filed 9-21-95; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 09/22/1995
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 95-23513
- Pages:
- 49271-49271 (1 pages)
- Docket Numbers:
- Docket No. CP95-754-000
- PDF File:
-
95-23513.pdf