95-23585. Environmental Impact Statements And Regulations; Availability of EPA Comments  

  • [Federal Register Volume 60, Number 184 (Friday, September 22, 1995)]
    [Notices]
    [Pages 49274-49275]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-23585]
    
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    (ER-FRL-5229-1)
    
    
    Environmental Impact Statements And Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared September 04, 1995 Through 
    September 08, 1995 pursuant to the Environmental Review Process (ERP), 
    under Section 309 of the Clean Air Act and Section 102(2)(c) of the 
    National Environmental Policy Act as amended. Requests for copies of 
    EPA comments can be directed to the Office of FEDERAL ACTIVITIES AT 
    (202) 260-5076.
        An explanation of the ratings assigned to draft environmental 
    impact statements (EISs) was published in FR dated April 14, 1995 (60 
    FR 19047).
    
    Draft EISs
    
        ERP No. D-FRC-L05213-WA Rating EO2, Rocky Reach Hydroelectric 
    Project (FERC No. 2145). Operating License Amendment Issuance to 
    Increase Lake Entiat Reservoir, Chelan and Douglas Counties, WA.
    
    Summary
    
        EPA expressed environmental objections due to potentially 
    significant water quality, wetland and fish impacts. Additional 
    information was requested on cumulative effects, mitigation measures 
    and impacts on water quality, wetlands and fisheries resources.
        ERP No. D-NAS-K59011-CA Rating EC2, Programmatic EIS--NASA Ames 
    Aerodynamic Testing Program, Implementation, Analyzation of the Noise 
    Envelope of Future Wind Tunnel Testing at the National Full-Scale 
    Aerodynamic Complex (NFAC), NASA Ames Research Center, Moffet Field, 
    Santa Clara County, CA.
    
    Summary
    
        EPA expressed environmental concerns regarding the lack of air 
    quality mitigation measures, noise impacts to Air Force housing and 
    dependents, and the lack of detail concerning noise mitigation.
        ERP No. DS-AFS-L65183-AK Rating LO, Central Prince of Wales 
    Ketchikan 
    
    [[Page 49275]]
    Pulp Long-Term Timber Sale, Additional Information, Implementation, 
    Tongass National Forest, Prince of Wales Island, AK.
    
    Summary
    
        EPA provided no comments and therefore has no objection to the 
    preferred alternative as described in the EIS.
    
    Final EISs
    
        ERP No. F-AFS-L65238-WA Thunder Mountain Fire Recovery and Salvage 
    Project, Implementation, Okanogan National Forest, Tonasket and Methow 
    Valley Ranger Districts, Okanogan County, WA.
    
    Summary
    
        EPA had no objection to the proposed action. The final EIS has 
    addressed EPA concerns.
        ERP No. F-NPS-L64043-WA Elwha River Ecosystem Restoration, 
    Implementation, Olympic National Park, Clallam County, WA.
    
    Summary
    
        EPA had no objection to the proposed action.
        ERP No. FS-RUS-E08017-FL Hardee Unit 3 440 Megawatt (MW) Natural 
    Gas and Oil Fired Combined Cycle Electric Power Station, Construction 
    and Operation, Approval, Funding and NPDES Permit, Hardee County, FL.
    
    Summary
    
        EPA expressed environmental concerns regarding groundwater and 
    environmental justice.
    
        Dated: September 19, 1995.
    B. Katherine Biggs,
    Associate Director, NEPA Compliance Division, Office of Federal 
    Activities.
    [FR Doc. 95-23585 Filed 9-21-95; 8:45 am]
    BILLING CODE 6560-50-U
    
    

Document Information

Published:
09/22/1995
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
95-23585
Pages:
49274-49275 (2 pages)
PDF File:
95-23585.pdf