95-23586. Environmental Impact Statements; Notice of Availability  

  • [Federal Register Volume 60, Number 184 (Friday, September 22, 1995)]
    [Notices]
    [Pages 49275-49276]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-23586]
    
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    [ER-FRL-5228-9]
    
    
    Environmental Impact Statements; Notice of Availability
    
        Responsible Agency: Office of Federal Activities, General 
    Information (202) 260-5076 OR (202) 260-5075.
        Weekly receipt of Environmental Impact Statements Filed September 
    11, 1995 Through September 15, 1995 Pursuant to 40 CFR 1506.9.
        EIS No. 950422, DRAFT EIS, COE, CA, Delta Wetlands Project, 
    Construction and Operation, Water Storage Project on Four Islands in 
    the Sacramento-San Joaquin Delta, Approval of Permits, San Joaquin and 
    Contra Costa Counties, CA, Due: November 21, 1995, Contact: Jim Monroe 
    (916) 557-5266. 
    
    [[Page 49276]]
    
        EIS No. 950423, DRAFT SUPPLEMENT, FHW, SC, Mark Clark Expressway 
    Facility Construction, Sam Rittenberg Boulevard (SC-7) to Folly Road 
    (SC-171) crossing the Stono River, Updated Information concerning the 
    last portion of the Charleston Inner Belt Freeway, Funding and COE 
    Sections 404 and 10 Permits and US Coast Guard Bridge Permit Issuance, 
    Charleston County, SC, Due: November 06, 1996, Contact: Kenneth Myers 
    (803) 253-3881.
        EIS No. 950424, DRAFT EIS, AFS, MT, Mormon Ridge Winter Range Peak 
    Ecosystem Restoration, Implementation, Lolo National Forest, Missoula 
    Ranger District, Missoula County, MT, Due: November 06, 1995, Contact: 
    Andy Kulla (406) 329-3962.
        EIS No. 950425, DRAFT EIS, BLM, NV, Round Mountain Mine Mill and 
    Tailings Facility, Construction and Operation for the Smoke Valley 
    Operation, Plan of Operations Amendment, Nye County, NV, Due: November 
    22, 1995, Contact: Christopher Stubb (702) 635-4000.
        EIS No. 950426, FINAL EIS, AFS, UT, Brian Head Recovery Project, 
    Timber Harvest, Implementation, Dixie National Forest, Cedar City 
    Ranger District, Iron County, UT, Contact: Ronald S. Wilson (801) 865-
    3200.
        ADDITIONAL PUBLIC REVIEW NOT NECESSARY--The Brian Head DEIS was 
    reviewed by the public for a 45 day period and comments have been 
    included in the FEIS. The FEIS and Decision will not require additional 
    public review as described in Paragraph 6 of the Memorandum of 
    Agreement on Timber Salvage Activities under Public Law 104-19, between 
    the USDA, USDOI, USDOC and the USEPA.
        EIS No. 950427, FINAL EIS, AFS, ID, Thunderbolt Wildfire Recovery 
    Project, Implementation, Boise and Payette National Forests, Valley 
    County, ID, Due: October 23, 1995, Contact: Ronn Julian (208) 382-7400.
        EIS No. 950428, LEGISLATIVE DRAFT EIS, AFS, MT, Lolo National Wild 
    and Scenic Rivers, Suitability Study for Eight Rivers for Inclusion in 
    the National Wild and Scenic River System, Lolo National Forest, Lewis 
    & Clark, Missoula, Powell, Ravalli and Sanders Counties, MT, Due: 
    November 06, 1995, Contact: Suzanne Artley (406) 329-3776.
        EIS No. 950429, FINAL EIS, FHW, AL, I-59/I-759 Interchange to US 11 
    and US 431/US 278, Construction, Funding, Etowah County, AL, Due: 
    October 23, 1995, Contact: Joe Wilkerson (205) 223-7370.
        EIS No. 950430, DRAFT EIS, COE, VA, VA-168 Battlefield Boulevard 
    South, Construction between Peaceful Road and the North Carolina State 
    Line, Issuance of Permits, VA, Due: November 06, 1995, Contact: Alice 
    Allen-Grimes (804) 441-7219.
        EIS No. 950431, DRAFT EIS, DOE, Programmatic EIS Waste Management, 
    Managing Treatment, Storage and/or Disposal of Radioactive and 
    Hazardous Waste for Five Types of Waste: Low-Level Radioactive; Low-
    Level Mixed; Transuranic Radioactive; High-Level Radioactive and 
    Hazardous Waste, Sites Selection Around the United States, Due: 
    December 21, 1995, Contact: David Hoel (202) 586-3977.
    
    Amended Notices
    
        EIS No. 930170, DRAFT EIS, AFS, OR, Camas Salvage Timber Sales, 
    Restoration and Off-Highway Vehicle Trail Complex Projects, 
    Implementation, Umatilla National Forest, North Fork John Day Ranger 
    District, Umatilla and Union Counties, OR, Contact: Jeff Hammes (503) 
    427-3231.
        Published FR 05-28-93--Officially Withdrawn by the Preparing 
    Agency.
        EIS No. 950306, DRAFT EIS, SFW, NV, Lahontan Valley Wetlands Water 
    Rights Acquisition Program, Implementation, Churchill County, NV, Due: 
    October 20, 1995, Contact: Ronald M. Anglin (702) 432-5128.
        Published FR 07-21-95--Review period extended.
        EIS No. 950405, DRAFT EIS, AFS, MT, Rock Creek Copper/Silver Mine 
    Project, Construction and Operation, COE Section 404 Permit and Permits 
    Approval, Kootenai National Forest, Sanders County, MT, Due: October 
    23, 1995, Contact: Paul Kaiser (406) 293-6211.
        Published FR 09-8-95--Officially Withdrawn by the Preparing Agency.
    
        Dated: September 19, 1995.
    B. Katherine Biggs,
    Associate Director, NEPA Compliance Division, Office of Federal 
    Activities.
    [FR Doc. 95-23586 Filed 9-21-95; 8:45 am]
    BILLING CODE 6560-50-U
    
    

Document Information

Published:
09/22/1995
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
95-23586
Pages:
49275-49276 (2 pages)
Docket Numbers:
ER-FRL-5228-9
PDF File:
95-23586.pdf