[Federal Register Volume 60, Number 184 (Friday, September 22, 1995)]
[Notices]
[Pages 49275-49276]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-23586]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-5228-9]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 260-5076 OR (202) 260-5075.
Weekly receipt of Environmental Impact Statements Filed September
11, 1995 Through September 15, 1995 Pursuant to 40 CFR 1506.9.
EIS No. 950422, DRAFT EIS, COE, CA, Delta Wetlands Project,
Construction and Operation, Water Storage Project on Four Islands in
the Sacramento-San Joaquin Delta, Approval of Permits, San Joaquin and
Contra Costa Counties, CA, Due: November 21, 1995, Contact: Jim Monroe
(916) 557-5266.
[[Page 49276]]
EIS No. 950423, DRAFT SUPPLEMENT, FHW, SC, Mark Clark Expressway
Facility Construction, Sam Rittenberg Boulevard (SC-7) to Folly Road
(SC-171) crossing the Stono River, Updated Information concerning the
last portion of the Charleston Inner Belt Freeway, Funding and COE
Sections 404 and 10 Permits and US Coast Guard Bridge Permit Issuance,
Charleston County, SC, Due: November 06, 1996, Contact: Kenneth Myers
(803) 253-3881.
EIS No. 950424, DRAFT EIS, AFS, MT, Mormon Ridge Winter Range Peak
Ecosystem Restoration, Implementation, Lolo National Forest, Missoula
Ranger District, Missoula County, MT, Due: November 06, 1995, Contact:
Andy Kulla (406) 329-3962.
EIS No. 950425, DRAFT EIS, BLM, NV, Round Mountain Mine Mill and
Tailings Facility, Construction and Operation for the Smoke Valley
Operation, Plan of Operations Amendment, Nye County, NV, Due: November
22, 1995, Contact: Christopher Stubb (702) 635-4000.
EIS No. 950426, FINAL EIS, AFS, UT, Brian Head Recovery Project,
Timber Harvest, Implementation, Dixie National Forest, Cedar City
Ranger District, Iron County, UT, Contact: Ronald S. Wilson (801) 865-
3200.
ADDITIONAL PUBLIC REVIEW NOT NECESSARY--The Brian Head DEIS was
reviewed by the public for a 45 day period and comments have been
included in the FEIS. The FEIS and Decision will not require additional
public review as described in Paragraph 6 of the Memorandum of
Agreement on Timber Salvage Activities under Public Law 104-19, between
the USDA, USDOI, USDOC and the USEPA.
EIS No. 950427, FINAL EIS, AFS, ID, Thunderbolt Wildfire Recovery
Project, Implementation, Boise and Payette National Forests, Valley
County, ID, Due: October 23, 1995, Contact: Ronn Julian (208) 382-7400.
EIS No. 950428, LEGISLATIVE DRAFT EIS, AFS, MT, Lolo National Wild
and Scenic Rivers, Suitability Study for Eight Rivers for Inclusion in
the National Wild and Scenic River System, Lolo National Forest, Lewis
& Clark, Missoula, Powell, Ravalli and Sanders Counties, MT, Due:
November 06, 1995, Contact: Suzanne Artley (406) 329-3776.
EIS No. 950429, FINAL EIS, FHW, AL, I-59/I-759 Interchange to US 11
and US 431/US 278, Construction, Funding, Etowah County, AL, Due:
October 23, 1995, Contact: Joe Wilkerson (205) 223-7370.
EIS No. 950430, DRAFT EIS, COE, VA, VA-168 Battlefield Boulevard
South, Construction between Peaceful Road and the North Carolina State
Line, Issuance of Permits, VA, Due: November 06, 1995, Contact: Alice
Allen-Grimes (804) 441-7219.
EIS No. 950431, DRAFT EIS, DOE, Programmatic EIS Waste Management,
Managing Treatment, Storage and/or Disposal of Radioactive and
Hazardous Waste for Five Types of Waste: Low-Level Radioactive; Low-
Level Mixed; Transuranic Radioactive; High-Level Radioactive and
Hazardous Waste, Sites Selection Around the United States, Due:
December 21, 1995, Contact: David Hoel (202) 586-3977.
Amended Notices
EIS No. 930170, DRAFT EIS, AFS, OR, Camas Salvage Timber Sales,
Restoration and Off-Highway Vehicle Trail Complex Projects,
Implementation, Umatilla National Forest, North Fork John Day Ranger
District, Umatilla and Union Counties, OR, Contact: Jeff Hammes (503)
427-3231.
Published FR 05-28-93--Officially Withdrawn by the Preparing
Agency.
EIS No. 950306, DRAFT EIS, SFW, NV, Lahontan Valley Wetlands Water
Rights Acquisition Program, Implementation, Churchill County, NV, Due:
October 20, 1995, Contact: Ronald M. Anglin (702) 432-5128.
Published FR 07-21-95--Review period extended.
EIS No. 950405, DRAFT EIS, AFS, MT, Rock Creek Copper/Silver Mine
Project, Construction and Operation, COE Section 404 Permit and Permits
Approval, Kootenai National Forest, Sanders County, MT, Due: October
23, 1995, Contact: Paul Kaiser (406) 293-6211.
Published FR 09-8-95--Officially Withdrawn by the Preparing Agency.
Dated: September 19, 1995.
B. Katherine Biggs,
Associate Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 95-23586 Filed 9-21-95; 8:45 am]
BILLING CODE 6560-50-U