97-25139. Tennessee Gas Pipeline Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 62, Number 184 (Tuesday, September 23, 1997)]
    [Notices]
    [Pages 49678-49679]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-25139]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP97-748-000]
    
    
    Tennessee Gas Pipeline Company; Notice of Request Under Blanket 
    Authorization
    
    September 17, 1997.
        Take notice that on September 11, 1997, Tennessee Gas Pipeline 
    Company (Tennessee), P.O. Box 2511, Houston, Texas 77252, filed in 
    Docket No. CP97-748-000 a request pursuant to Sections 157.205 and 
    157.212 of the Commission's Regulations under the Natural Gas Act (18 
    CFR 157.205 and 157.212) for approval to convert an existing receipt 
    point for SONAT Intrastate-Alabama (SONAT), an intrastate pipeline 
    company, under Tennessee's blanket certificate issued in Docket No. 
    CP82-413-000, pursuant to Section 7(c) of the Natural Gas Act (NGA), 
    all as more fully set forth in the request which is on file with the 
    Commission and open to public inspection.
        Tennessee proposes to convert existing receipt point No. 1-2038 
    located in Lamar County, Alabama, by removing an eight-inch check-
    valve, installing a spool piece, and modifying the existing electronic 
    measuring equipment to function as a delivery meter. Tennessee asserts 
    that SONAT will reimburse Tennessee for the cost of this project, which 
    Tennessee estimates to be $20,800.
        Tennessee states that the volumes of natural gas to be delivered to 
    SONAT at the proposed delivery point will be on an interruptible basis. 
    Tennessee asserts that the total volumes delivered to SONAT before the 
    conversion of the receipt point do not exceed the total volumes to be 
    delivered to SONAT after the conversion and that this change is not 
    prohibited by an existing tariff. Tennessee further asserts that it has 
    sufficient capacity to accomplish the deliveries specified herein 
    without detriment or disadvantage to Tennessee's other customers.
        Any person or the Commission's Staff may, within 45 days of the 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Rules of Practice and Procedure (18 CFR 
    385.214), a motion to intervene and pursuant to Section 157.205 of the 
    regulations under the Natural Gas Act (18 CFR 157.205), a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activities shall be deemed to be authorized effective the 
    day after
    
    [[Page 49679]]
    
    the time allowed for filing a protest. If a protest is filed and not 
    withdrawn 30 days after the time allowed for filing a protest, the 
    instant request shall be treated as an application for authorization 
    pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-25139 Filed 9-22-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
09/23/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-25139
Pages:
49678-49679 (2 pages)
Docket Numbers:
Docket No. CP97-748-000
PDF File:
97-25139.pdf