97-25229. Approval and Promulgation of Air Quality Implementation Plans; Maine; (General Conformity Rule)  

  • [Federal Register Volume 62, Number 184 (Tuesday, September 23, 1997)]
    [Proposed Rules]
    [Page 49648]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-25229]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    40 CFR Part 52
    
    [ME-046-6996b; A-1-FRL-5894-7]
    
    
    Approval and Promulgation of Air Quality Implementation Plans; 
    Maine; (General Conformity Rule)
    
    AGENCY: Environmental Protection Agency (EPA).
    
    ACTION: Proposed rule.
    
    -----------------------------------------------------------------------
    
    SUMMARY: EPA is proposing to approve a State Implementation Plan (SIP) 
    revision submitted by the State of Maine for the purpose of 
    implementing General Conformity (Section 176(c)(4)(C) of the Clean Air 
    Act (CAA) and its regulations 40 CFR part 51, Subpart W). The Maine SIP 
    incorporates by reference the criteria and procedures set forth at 40 
    CFR part 51, Subpart W. This SIP revision establishes and requires 
    federal actions to conform to all applicable implementation plans 
    developed pursuant to Section 110 and Part D of the CAA. In the Final 
    Rules Section of this Federal Register, EPA is approving the State's 
    SIP revision as a direct final rule without prior proposal because the 
    Agency views this as a noncontroversial revision amendment and 
    anticipates no adverse comments. A detailed rationale for the approval 
    is set forth in the direct final rule. If no adverse comments are 
    received in response to that direct final rule, no further activity is 
    contemplated in relation to this proposed rule. If EPA receives adverse 
    comments, the direct final rule will be withdrawn and all public 
    comments received will be addressed in a subsequent final rule based on 
    this proposed rule. EPA will not institute a second comment period on 
    this proposal. Any parties interested in commenting on this proposal 
    should do so at this time.
    
    DATES: Comments must be received on or before October 23, 1997.
    
    ADDRESSES: Comments may be mailed to Susan Studlien, Deputy Director, 
    Office of Ecosystem Protection (mail code CAA), U.S. Environmental 
    Protection Agency, Region I, JFK Federal Bldg., Boston, MA 02203. 
    Copies of the State submittal are available for public inspection 
    during normal business hours, by appointment at the Office of Ecosystem 
    Protection, U.S. Environmental Protection Agency, Region I, One 
    Congress Street, 11th floor, Boston, MA and the Bureau of Air Quality 
    Control, Department of Environmental Protection, 71 Hospital Street, 
    Augusta, ME 04333.
    
    FOR FURTHER INFORMATION CONTACT: Donald O. Cooke, (617) 565-3508, at 
    the EPA Region I address above.
    
    SUPPLEMENTARY INFORMATION: For additional information, see the direct 
    final rule which is located in the Rules Section of this Federal 
    Register.
    
        Authority: 42 U.S.C. 7401--7671q.
    
        Dated: September 9, 1997.
    John P. DeVillars,
    Regional Administrator, Region I.
    [FR Doc. 97-25229 Filed 9-22-97; 8:45 am]
    BILLING CODE 6560-50-P
    
    
    

Document Information

Published:
09/23/1997
Department:
Environmental Protection Agency
Entry Type:
Proposed Rule
Action:
Proposed rule.
Document Number:
97-25229
Dates:
Comments must be received on or before October 23, 1997.
Pages:
49648-49648 (1 pages)
Docket Numbers:
ME-046-6996b, A-1-FRL-5894-7
PDF File:
97-25229.pdf
CFR: (1)
40 CFR 52