99-24955. Intent To Prepare a Supplement to the 1992 Final Environmental Impact Statement on Modified Water Deliveries to Everglades National Park (Mod Waters Project) To Address a Change in Design of the Levee 67 and Levee 29 Water Conveyance ...  

  • [Federal Register Volume 64, Number 185 (Friday, September 24, 1999)]
    [Notices]
    [Pages 51740-51741]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-24955]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF DEFENSE
    
    Department of the Army; Corps of Engineers
    
    
    Intent To Prepare a Supplement to the 1992 Final Environmental 
    Impact Statement on Modified Water Deliveries to Everglades National 
    Park (Mod Waters Project) To Address a Change in Design of the Levee 67 
    and Levee 29 Water Conveyance Features Within Water Conservation Area 3 
    (WCA 3)
    
    AGENCY: U.S. Army Corps of Engineers, Department of Defense.
    
    ACTION: Notice of intent.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The congressionally authorized Mod Waters project consists of 
    structural modifications and additions to the existing C&SF Project 
    required to improve water deliveries for ecosystem restoration of 
    Everglades National Park (Park). The authorized plan calls for 
    construction of six water control structures in Levee 67 (L-67) and its 
    adjacent canal, which partition WCA 3 into two basins, WCA 3A and WCA 
    3B and two recently constructed structures in L-29. At the request of 
    the local sponsor, the South Florida Water Management District (SFWMD), 
    the Corps will be revaluating the design of the water conveyance 
    features and addressing the need for water seepage control for WCA 3B.
    
    FOR FURTHER INFORMATION CONTACT: U.S. Army Corps of Engineers, P.O. Box 
    4970, Jacksonville, Florida 32232; Attn: Mr. Elmar Kurzbach, 904-232-
    2325.
    
    SUPPLEMENTARY INFORMATION:
        1. Alternatives to be evaluated involve combinations of gated water 
    control structures, passive structures (fixed-crest weirs), levee 
    removal, and canal filling to convey water from WCA 3A into WCA 3B and 
    from WCA 3B into Northeast Shark River Slough. Seepage
    
    [[Page 51741]]
    
    control alternatives involve combinations of new operational and 
    structural elements such as pump stations.
        2. A Scoping letter and public Scoping Meeting will be used to 
    invite comments on alternatives and issues from Federal, State, and 
    local agencies, affected Indian tribes, and other interested private 
    organizations and individuals.
        3. The Draft EIS will analyze issues related to recreational 
    fishing access, WCA 3B tree island flooding, introduction of poor 
    quality water, and Everglades National Park ecosystem restoration.
        4. The alternative plans will be reviewed under provisions of 
    appropriate laws and regulations, including the Endangered Species Act, 
    Fish and Wildlife Coordination Act, Clean Water Act, and Farmland 
    Protection Policy Act.
        5. The Draft EIS is expected to be available for public review in 
    the 4th quarter CY 2000.
    
        Dated: September 10, 1999.
    James C. Duck,
    Chief, Planning Division.
    [FR Doc. 99-24955 Filed 9-23-99; 8:45 am]
    BILLING CODE 3710-AJ-M
    
    
    

Document Information

Published:
09/24/1999
Department:
Defense Department
Entry Type:
Notice
Action:
Notice of intent.
Document Number:
99-24955
Pages:
51740-51741 (2 pages)
PDF File:
99-24955.pdf