[Federal Register Volume 64, Number 185 (Friday, September 24, 1999)]
[Notices]
[Page 51753]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-24966]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6246-4]
Environmental Impact Statements; Notice of Availability
RESPONSIBLE AGENCY: Office of Federal Activities, General Information
(202) 564-7167 or (202) 564-7153.
Weekly receipt of Environmental Impact Statements Filed September
13, 1999 Through September 17, 1999 Pursuant to 40 CFR 1506.9.
EIS No. 990330, Draft EIS, AFS, UT, Monroe Mountain Ecosystem
Restoration Project, Implementation, Fishlake National Forest,
Richfield Ranger District, Sevier and Piute Counties, UT, Due: November
08, 1999, Contact: Don Okerlund (435) 896-9233.
EIS No. 990331, Final EIS, FHW, WV, Elkins Bypass Project,
Construction, Relocation of US-33 between Aggregates and Canfield,
Funding NPDES Permit and COE Section 404 Permit, Randolph County, WV,
Due: October 29, 1999, Contact: Thomas J. Smith (304) 347-5928.
EIS No. 990332, Draft EIS, FRC, IL, MI, IN, TriState Pipeline Project,
Construction and Operation of Natural Gas Pipeline Facilities, Docket
Nos.: CP99-61-000, CP99-62-000, CP99-63-000 and CP99-64-000,
Presidential Permit, IL, IN and MI, Due: November 08, 1999, Contact:
Paul McKee (202) 208-1088.
EIS No. 990333, Final EIS, NOA, ME, Atlantic Herring (Clupea harengus
harengus) Fishery Management Plan (FWP), Management Measures, Exclusive
Ecosystem Zone (EEZ), Gulf of Maine, George Bank, ME, Due: October 25,
1999, Contact: Hannah Goodale (978) 281-9300.
EIS No. 990334, Final EIS, FHW, MD, MD-331--Dover Bridge, Construction,
Right-of-Way Grant, US Coast Guard Bridge Permit and COE Section 404
Permit, Easton, Talbot and Caroline County, MD, Due: October 25, 1999,
Contact: Pam Stephenson (410) 962-4342.
Amended Notices
EIS No. 990226, Draft EIS, COE, FL, Southwest Florida Improvement to
the Regulatory Process for Rapid Growth and Development, Alternatives
Development Group (ADG), Lee and Collier Counties, FL, Due: November
02, 1999, Contact: Kenneth R. Dugger (904) 232-1686. Published FR 07-
09-99--Review Period extended from 08-23-99 to 11-02-99.
EIS No. 990292, Draft EIS, BIA, AZ, NM, Programmatic EIS--Navajo Ten
Year Forest Management Plan Alternatives, Implementation and Funding,
AZ and NM, Due: October 20, 1999, Contact: Harold D. Russell (520) 729-
7228. Published FR 08-20-99 Review Period Extended--from 10-04-99 to
10-20-99.
EIS No. 990312, Final EIS, COE, OR, WA and Lower Willamette River
Federal Navigation Channel, Improvement Channel Deepening, OR and WA,
Due: October 25, 1999, Contact: Steven J. Stevens (503) 808-4768.
Published FR 09-10-99--Review Period Extended from 10-12-99 to 10-25-
99.
Dated: September 21, 1999.
William D. Dickerson,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 99-24966 Filed 9-23-99; 8:45 am]
BILLING CODE 6560-50-U