DEPARTMENT OF ENERGY
[Docket No. CP96-775-000]
Northwest Pipeline Corporation; Notice of Application for
Authorization To Abandon Facilities In-Place
September 19, 1996.
Take notice that, on September 9, 1996, Northwest Pipeline
Corporation (Northwest), 295 Chipeta Way, Salt Lake City, Utah 84108,
filed an abbreviated application in Docket No. CP96-775-000, pursuant
to section 7(b) of the Natural Gas Act and Secs. 157.7(a) and 157.18 of
the Commission's Regulations, for authorization to abandon (in-place)
approximately 4,525 feet of its 10-inch diameter South Seattle Lateral
and adjacent 10-inch diameter lateral loop line, in King County,
Washington, all as more fully set forth in the application, which is on
file with the Commission and open to public inspection.
In 1993, Northwest retired (in-place) and replaced a total of
approximately 4,700 feet of the South Seattle Lateral and adjacent loop
line. Northwest subsequently filed an application, in Docket No. CP96-
501-000, for authorization to abandon, remove and replace the 175-foot
segments of its South Seattle Lateral and adjacent loop line that
crossed Madsen Creek. In an order issued August 7, 1996 (76 FERC para.
62,095), the Commission approved the abandonment of the two 175-foot
pipeline segments and directed Northwest to file an application to
abandon the remaining 4,525 feet of its South Seattle Lateral and
adjacent loop line.
Northwest now proposes to abandon (in-place) the remaining 4,525
feet of retired and replaced South Seattle Lateral and adjacent loop
line. Northwest states that, since no pipeline facilities will be
removed, there will be no costs associated with the proposed
abandonment. Northwest further states that, since the affected pipeline
segments have already been replaced, no services will be abandoned as a
result of this proposal. The subject pipeline segments are located in
Sections 26 and 27, Township 23 North, Range 5 East, in King County,
Washington.
Any person desiring to be heard or to make any protests with
reference to said application should on or before October 10, 1996,
file with the Federal Energy Regulatory Commission, Washington, D.C.
20426, a motion to intervene or a protest in accordance with the
requirements of the Commission's Rules of Practice and Procedure (18
CFR 385.214 or 385.211) and the Regulations under the Natural Gas Act
(18 CFR 157.10). All protests filed with the Commission will be
considered by it in determining the appropriate action to be taken but
will not serve to make the protestants parties to the proceeding. Any
person wishing to become a party to a proceeding or to participate as a
party in any hearing therein must file a motion to intervene in
accordance with the Commission's Rules.
Take further notice that, pursuant to the authority contained in
and subject to the jurisdiction conferred upon the Federal Energy
Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and
the Commission's Rules of Practice and Procedure, a hearing will be
held without further notice before the Commission or its designee on
this application, if no motion to intervene is filed within the time
required herein, or if the Commission on its own review of the matter
finds that permission and approval for the proposed abandonment are
required by the public convenience and necessity. If a motion for leave
to intervene is timely filed, or if the Commission on its own motion
believes that a formal hearing is required, further notice of such
hearing will be duly given.
Under the procedure herein provided for, unless otherwise advised,
it will be unnecessary for Northwest to appear or be represented at the
hearing.
Lois D. Cashell,
Secretary.
[FR Doc. 96-24497 Filed 9-24-96; 8:45 am]