97-25389. Southern Natural Gas Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 62, Number 186 (Thursday, September 25, 1997)]
[Notices]
[Pages 50304-50305]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-25389]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP97-723-000]
Southern Natural Gas Company; Notice of Request Under Blanket
Authorization
September 19, 1997.
Take notice that on September 3, 1997, Southern Natural Gas Company
(Southern), Post Office Box 2563, Birmingham, Alabama 35202-2563, filed
a request with the Commission in Docket No. CP97-763-000 pursuant to
Section 157.205 of the Commission's Regulations under the Natural Gas
Act (NGA) for authorization to relocate a portion of its North Main
Line, North Main Loop Line and Second North Main Line, under its
blanket certificate issued in Docket No. CP82-406-000 pursuant to
Section 7 of the NGA, all are more fully set forth in the request which
is open to public inspection.
Southern states that it proposes to relocate certain facilities in
order to remove its system from the threat of soil subsidence which may
occur as a result of a long-wall coal seam mining. Southern states that
it will relocate its 22-inch North Main Line and 24-inch North Main
Loop Line facilities in Jefferson County, Alabama. It is stated that
the estimated cost would be about $17.7 million and that there would be
no adverse impact to firm deliveries.
Any person or the Commission's staff may, within 45 days after the
Commission has issued this notice, file pursuant to Rule 214 of the
Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or
notice of intervention and pursuant to Sec. 157.205 of the Regulations
under the NGA (18 CFR 157.205) a protest to the request. If no protest
is filed within the time allowed therefor, the proposed activity shall
be deemed to be
[[Page 50305]]
authorized effective the day after the time allowed for filing a
protest. If a protest is filed and not withdrawn within 30 days after
the time allowed for filing a protest, the instant request shall be
treated as an application for authorization pursuant to Section 7 of
the NGA.
Lois D. Cashell,
Secretary.
[FR Doc. 97-25389 Filed 9-24-97; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 09/25/1997
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 97-25389
- Pages:
- 50304-50305 (2 pages)
- Docket Numbers:
- Docket No. CP97-723-000
- PDF File:
-
97-25389.pdf