98-25625. Northeast Nuclear Energy Company; Notice of Withdrawal of Application for Amendment to Facility Operating License  

  • [Federal Register Volume 63, Number 186 (Friday, September 25, 1998)]
    [Notices]
    [Pages 51379-51380]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-25625]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    
    [Docket No. 50-336]
    
    
    Northeast Nuclear Energy Company; Notice of Withdrawal of 
    Application for Amendment to Facility Operating License
    
        The U.S. Nuclear Regulatory Commission (the Commission) has granted 
    the request of Northeast Nuclear Energy Company (NNECO) to withdraw its 
    July 7, 1995, application for proposed amendment to Facility Operating 
    License No. DRP-65 for the Millstone Nuclear Power Station, Unit No. 2, 
    located in New London County, Connecticut.
        The proposed amendment would have revised the requirements for the 
    control room air conditioning system and supporting Bases. 
    Subsequently, by letter dated August 4, 1998, NNECO withdrew the 
    amendment request because it is in the process of performing new 
    radiological assessment calculations for various Millstone, Unit No. 2, 
    design basis accidents, which will result in changes to the proposed 
    amendment. NNECO also indicated that it would no longer be necessary to 
    respond to the two requests for additional information dated November 6 
    and 25, 1997, since the amendment request is being withdrawn.
        The Commission had previously issued a Notice of Consideration of 
    Issuance of Amendment published in the Federal Register on August 2, 
    1995 (60 FR 39443). However, by letter dated August 4, 1998, the 
    licensee withdrew the proposed change.
        For further details with respect to this action, see the 
    application for amendment dated July 7, 1995, and the licensee's letter 
    dated August 4, 1998, which withdrew the application for license 
    amendment. The above documents are available for public inspection at 
    the Commission's Pubic Document Room, the Gelman Building, 2120 L 
    Street, NW., Washington, DC, and at the local public document rooms 
    located at the Learning Resources Center, Three Rivers Community-
    
    [[Page 51380]]
    
    Technical College, 574 New London Turnpike, Norwich, Connecticut, and 
    the Waterford Library, ATTN: Vince Juliano, 49 Rope Ferry Road, 
    Waterford, Connecticut.
    
        Dated at Rockville, Maryland, this 16th day of September 1998.
    
        For the Nuclear Regulatory Commission.
    Daniel G. McDonald Jr.,
    Senior Project Manager, Millstone Project Directorate, Division of 
    Reactor Projects-I/II, Office of Nuclear Reactor Regulation.
    [FR Doc. 98-25625 Filed 9-24-98; 8:45 am]
    BILLING CODE 7590-01-M
    
    
    

Document Information

Published:
09/25/1998
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
98-25625
Pages:
51379-51380 (2 pages)
Docket Numbers:
Docket No. 50-336
PDF File:
98-25625.pdf