98-25661. El Paso Natural Gas Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 63, Number 186 (Friday, September 25, 1998)]
[Notices]
[Page 51344]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-25661]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP98-778-000]
El Paso Natural Gas Company; Notice of Request Under Blanket
Authorization
September 21, 1998.
Take notice that on September 14, 1998, El Paso Natural Gas Company
(El Paso), P.O. Box 1492, El Paso, Texas 79978, filed in Docket No.
CP98-778-000 a request pursuant to Sections 157,205 and 157.212 of the
Commission's Regulations under the Natural Gas Act (18 CFR 157.205,
157.212) for authorization to certificate and to continue the operation
of an existing delivery point, installed under Section 311(a) of the
Natural Gas Policy Act, under El Paso's blanket certificate issued in
Docket No. CP82-435-000 pursuant to Section 7 of the Natural Gas Act,
all as more fully set forth in the request that is on file with the
Commission and open to public inspection.
El Paso states that the facility was installed under Section 311(a)
and has exclusively used this delivery point for the transportation and
delivery of natural gas under Part 284, Subpart B. El Paso states that
the regulatory restriction placed on the operation of a facility
installed under Section 311 (a) of the NGPA prohibits El Paso shippers
from utilizing this delivery point under any transportation arrangement
other than a Subpart B transportation arrangement. In view of this
limited service flexibility, El Paso believes that certification of the
Pinnacle Delivery Point, located in Hutchinson County, Texas, pursuant
to Section 157.212 of the Commission's Regulations, is necessary and in
the public interest. El Paso states that continued operation of the
facility is not prohibited by El Paso's existing Volume No. 1-A FERC
Gas Tariff. El Paso states that it has sufficient capacity to
accomplish the deliveries without detriment or disadvantage to El
Paso's other customers.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
David P. Boergers,
Secretary.
[FR Doc. 98-25661 Filed 9-24-98; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 09/25/1998
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 98-25661
- Pages:
- 51344-51344 (1 pages)
- Docket Numbers:
- Docket No. CP98-778-000
- PDF File:
-
98-25661.pdf