    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-778-000]
    
    
    El Paso Natural Gas Company; Notice of Request Under Blanket 
    Authorization
    
    September 21, 1998.
        Take notice that on September 14, 1998, El Paso Natural Gas Company 
    (El Paso), P.O. Box 1492, El Paso, Texas 79978, filed in Docket No. 
    CP98-778-000 a request pursuant to Sections 157,205 and 157.212 of the 
    Commission's Regulations under the Natural Gas Act (18 CFR 157.205, 
    157.212) for authorization to certificate and to continue the operation 
    of an existing delivery point, installed under Section 311(a) of the 
    Natural Gas Policy Act, under El Paso's blanket certificate issued in 
    Docket No. CP82-435-000 pursuant to Section 7 of the Natural Gas Act, 
    all as more fully set forth in the request that is on file with the 
    Commission and open to public inspection.
        El Paso states that the facility was installed under Section 311(a) 
    and has exclusively used this delivery point for the transportation and 
    delivery of natural gas under Part 284, Subpart B. El Paso states that 
    the regulatory restriction placed on the operation of a facility 
    installed under Section 311 (a) of the NGPA prohibits El Paso shippers 
    from utilizing this delivery point under any transportation arrangement 
    other than a Subpart B transportation arrangement. In view of this 
    limited service flexibility, El Paso believes that certification of the 
    Pinnacle Delivery Point, located in Hutchinson County, Texas, pursuant 
    to Section 157.212 of the Commission's Regulations, is necessary and in 
    the public interest. El Paso states that continued operation of the 
    facility is not prohibited by El Paso's existing Volume No. 1-A FERC 
    Gas Tariff. El Paso states that it has sufficient capacity to 
    accomplish the deliveries without detriment or disadvantage to El 
    Paso's other customers.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    David P. Boergers,
    Secretary.
    [FR Doc. 98-25661 Filed 9-24-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
09/25/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-25661
Pages:
51344-51344 (1 pages)
Docket Numbers:
Docket No. CP98-778-000
PDF File:
98-25661.pdf