98-25788. Notice of Application Accepted for Filing; Notice of Solicitation of Interventions and Protests; and Notice That the Application Is Ready for Environmental Analysis  

  • [Federal Register Volume 63, Number 187 (Monday, September 28, 1998)]
    [Notices]
    [Pages 51575-51576]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-25788]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of Application Accepted for Filing; Notice of Solicitation 
    of Interventions and Protests; and Notice That the Application Is Ready 
    for Environmental Analysis
    
    September 22, 1998.
        Take notice that the following hydroelectric application has been 
    filed with the Commission and is available for public inspection:
        a. Type of Application: Exemption of Small Conduit Hydroelectric 
    Facility.
        b. Project No.: P-11531-001.
        c. Date filed: July 21, 1998.
        d. Applicant: The City of Boulder, Colorado.
        e. Name of Project: Silver Lake Hydroelectric Project.
        f. Location: At the terminus of the applicant's existing Silver 
    Lake raw water pipeline, near the City of Boulder, in Boulder County, 
    Colorado.
        g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
        h. Applicant Contact: Eva June Busse, P.E., Hydroelectric Projects 
    Manager, City of Boulder, P.O. Box 791, Boulder, CO 80306-0791, (303) 
    441-4271.
        i. FERC Contact: Bob Easton, (202) 219-2782.
        j. Status of Application and Environmental Analysis: This 
    application has been accepted for filing and is ready for environmental 
    analysis at this time--see attached paragraph D4.
        k. Comment Date: See Paragraph D4.
        l. Description of Project: The proposed project would consist of: 
    (1) the existing reinforced concrete Silver Lake diversion intake 
    structure; (2) the existing 18,820-foot-long, 27-inch-diameter welded 
    steel Silver Lake pipeline; (3) a proposed powerhouse containing one 
    generating unit having an installed capacity of 3.2 megawatts; (4) 
    discharge facilities into Lakewood Reservoir; (5) a proposed 
    transmission line; (6) a proposed switchyard; and (7) appurtenant 
    facilities.
        m. This notice also consists of the following standard paragraphs: 
    A2, A9, B, and D4.
        n. Invitation to Intervene or Protest: Intervenors are reminded of 
    the Commission's Rules of Practice and Procedure requiring parties 
    filing documents with the Commission to serve a copy of the document on 
    each person whose name appears on the official service list for the 
    project. Further, if a party or intervenor files comments or documents 
    with the Commission relating to the merits of an issue that may affect 
    the responsibilities of a particular resource agency, they must also 
    serve a copy of the document on that resource agency. See attached 
    paragraph B.
        o. Locations of the Application: A copy of the application is 
    available for inspection and reproduction at the Commission's Public 
    Reference and Files Maintenance Branch, located at 888 First Street, 
    N.E., Washington, D.C. 20426, or by calling (202) 208-2326. A copy is 
    also available for inspection and production at the address shown in 
    item h above.
        A2. Development Application--Any qualified applicant desiring to 
    file a competing application must submit to the Commission, on or 
    before the specified deadline date for the particular application, a 
    competing development application, or a notice of intent to file such 
    an application. Submission of a timely notice of intent allows an 
    interested person to file the competing development application no 
    later than 120 days after the specified deadline date for the 
    particular application. Applications for preliminary permits will not 
    be accepted in response to this notice.
        A9. Notice of intent--A notice of intent must specify the exact 
    name, business address, and telephone number of the prospective 
    applicant, and must include an unequivocal statement of intent to 
    submit, if such an application may be filed, either a preliminary 
    permit application or a development application (specify which type of 
    application). A notice of intent must be served on the applicant(s) 
    named in this public notice.
        B. Comments, Protests, or Motions to Intervene--Anyone may submit 
    comments, a protest, or a motion to intervene in accordance with the 
    requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
    .214. In determining the appropriate action to take, the Commission 
    will consider all protests or other comments filed, but only those who 
    file a motion to intervene in accordance with the Commission's Rules 
    may become a party to the proceeding. Any comments, protests, or 
    motions to intervene must be received on or before the specified 
    comment date for the particular application.
        D4. Filing and Service of Responsive Documents--The application is 
    ready for environmental analysis at this time, and the Commission is 
    requesting comments, reply comments, recommendations, terms and 
    conditions, and prescriptions.
        The Commission directs, pursuant to Section 4.34(b) of the 
    Regulations (see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20, 
    1991) that all comments, recommendations, terms and conditions and 
    prescription concerning the application be filed with the Commission 
    within 60 days from the issuance date of this notice. All reply 
    comments must be filed with the Commission within 105 days from the 
    date of this Notice.
        Anyone may obtain an extension of time for these deadlines from the 
    Commission only upon a showing of good cause or extraordinary 
    circumstances in accordance with 18 CFR 385.2008.
        All filings must (1) bear in all capital letters the title 
    ``PROTEST'', ``MOTION TO INTERVENE'', ``NOTICE OF INTENT TO FILE 
    COMPETING APPLICATION,'' ``COMPETING APPLICATION,'' ``COMMENTS,'' 
    ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or 
    ``PRESCRIPTIONS;''; (2) set forth in the heading the name of the 
    applicant and the project number of the application to which the filing 
    responds; (3) furnish the name, address, and telephone number of the 
    person protesting or intervening; and (4) otherwise comply with the 
    requirements of 18 CFR 385.2001 through 385.2005. All comments, 
    recommendations, terms and conditions or prescriptions must set forth 
    their evidentiary basis and otherwise comply with the requirements of 
    18 CFR 4.34(b). Agencies may obtain copies of the application directly 
    from the applicant. Any of these documents must be filed by providing 
    the original and the number of copies required by the Commission's 
    regulations to: The Secretary, Federal Energy Regulatory Commission, 
    888 First Street, N.E., Washington, D.C. 20426. An additional copy must 
    be sent to Director, Division of Project Review, Office of Hydropower 
    Licensing, Federal Energy Regulatory Commission, at the above address. 
    A
    
    [[Page 51576]]
    
    copy of any protest or motion to intervene must be served upon each 
    representative of the applicant specified in the particular 
    application. A copy of all other filings in reference to this 
    application must be accompanied by proof of service on all persons 
    listed in the service list prepared by the Commission in this 
    proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    David P. Boergers,
    Secretary.
    [FR Doc. 98-25788 Filed 9-25-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
09/28/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-25788
Dates:
See Paragraph D4.
Pages:
51575-51576 (2 pages)
PDF File:
98-25788.pdf