AGENCY: Rural Utilities Service, USDA.
ACTION: Notice of Availability of an Environmental Assessment.
-----------------------------------------------------------------------
SUMMARY: Notice is hereby given that the Rural Utilities Service (RUS)
and the U.S. Army Corps of Engineers are issuing an environmental
assessment with respect to the potential environmental impacts related
to the construction and operation of a 69 kV electric transmission line
and substation in Wayne County, Missouri. RUS may provide financing
assistance to M&A Electric Power Cooperative, Inc., for the project.
The U.S. Army Corps of Engineers will grant a right-of-way easement
across property they manage for a portion of the transmission line and
the substation.
FOR FUTHER INFORMATION CONTACT: Bob Quigel, Environmental Protection
Specialist, Rural Utilities Service, Engineering and Environmental
Staff, Stop 1571, 1400 Independence Avenue, SW, Washington, DC 20250-
1571, telephone: (202) 720-0468. Bob's e-mail address is
bquigel@rus.usda.gov. Information is also available from Tony Gott, M&A
Electric Power Cooperative, Inc., Highway PP, West, Poplar Bluff,
Missouri 63901, (573) 785-9651.
SUPPLEMENTARY INFORMATION: The project consists of the construction of
a 69 kV electric transmission line and substation to be located in
Wayne County, Missouri. The project will be constructed by M&A Electric
Power Cooperative, Inc. The line will tie into an existing substation
located near Patterson and be connected to a new substation to be
constructed near Silva. The length of the transmission line is
approximately 7 miles. The substation will require approximately 4
acres of land. A portion of the transmission line and the substation
will be located within the Wappapello Lake Project area which is
managed by the U.S. Army Corps of Engineers. The U.S. Army Corps of
Engineers is a cooperating agency in the environmental review of this
project.
Burns and McDonnell prepared an environmental assessment for RUS
and the U.S. Army Corps of Engineers which describes the project and
assesses its environmental impacts. RUS and the U.S. Army Corps of
Engineers have conducted an independent evaluation of the environmental
assessment and believe that it accurately assesses the impacts of the
proposed project. No significant impacts are expected as a result of
the construction of the project.
The environmental assessment can be reviewed at the Piedmont Public
Library, 118 West Green, Piedmont, Missouri 63957, telephone (573) 223-
7036, the headquarters of M&A Electric Power Cooperative, Inc., at the
address provided above, or the headquarters of RUS, at the address
provided above.
Questions and comments should be sent to RUS at the address
provided. RUS will accept questions and comments on the environmental
assessment for at least 30 days from the date of publication of this
notice.
Any final action by RUS related to the proposed project will be
subject to, and
[[Page 52291]]
contingent upon, compliance with all relevant Federal environmental
laws and regulations and completion of environmental review procedures
as prescribed by the 7 CFR part 1794, Environmental Policies and
Procedures.
Dated: September 22, 1999.
Blaine D. Stockton, Jr.,
Assistant Administrator--Electric.
[FR Doc. 99-25179 Filed 9-27-99; 8:45 am]