2015-24537. Portland General Electric Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests  

  • Start Preamble

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

    a. Type of Application: Project Operating Plan Amendment.

    b. Project No.: 2195-131.

    c. Date Filed: July 8, 2015.

    d. Applicant: Portland General Electric Company (PGE).

    e. Name of Project: Clackamas River Hydroelectric Project.

    f. Location: The project is located on the Oak Grove Fork of the Clackamas River and the mainstem of the Clackamas River in Clackamas County, Oregon.

    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).

    h. Applicant Contact: Mr. John Esler, Project Manager, Environmental Compliance & Licensing, Portland General Electric Company, 121 SW Salmon Street, Portland, Oregon 97204. Phone (503) 464-8563.

    i. FERC Contact: Mr. Christopher Chaney, (202) 502-6778, or christopher.chaney@ferc.gov.

    j. Deadline for filing comments, motions to intervene, and protests, is 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, or recommendations using the Commission's eFiling system at http://www.ferc.gov/​docs-filing/​efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/​docs-filing/​ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Please include the project number (P-2195-131) on any comments, motions to intervene, orprotests filed.

    k. Description of Request: PGE filed a revised Project Operating Plan (Operating Plan) in order to increase operational efficiency and remove inconsistencies within the approved Operating Plan. The revised Operating Plan contains modifications to three areas: the high flow releases at Lake Harriet Dam, the definition of deviations from the flow requirements, and the definition of operating exceptions. Additionally, PGE corrected the maximum elevation of the North Fork Reservoir listed in Table 6, and revised Section 10 to reflect the completion of the River Mill three-year operations review.

    l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502-8371. This filing may also be viewed on the Commission's Web site at http://www.ferc.gov/​docs-filing/​elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document (i.e. P-2195). You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the address in item (h) above.

    m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

    n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

    o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title “COMMENTS”, “PROTEST”, or “MOTION TO INTERVENE” as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to the amendment request. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

    Start Signature

    Dated: September 22, 2015.

    Nathaniel J. Davis, Sr.,

    Deputy Secretary.

    End Signature End Preamble

    [FR Doc. 2015-24537 Filed 9-25-15; 08:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
09/28/2015
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2015-24537
Pages:
58242-58242 (1 pages)
Docket Numbers:
Project No. 2195-131
PDF File:
2015-24537.pdf