DEPARTMENT OF ENERGY
[Docket Nos. CP93-618-000 and CP93-618-001]
Pacific Gas Transmission Company; Availability of the
Environmental Assessment for the Proposed PGT Expansion II Project
September 23, 1994.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared this environmental assessment (EA) on the
natural gas pipeline facilities proposed by Pacific Gas Transmission
Company (PGT) in the above dockets.
The EA was prepared to satisfy the requirements of the National
Environmental Policy Act. The staff concludes that approval of the
proposed project, with appropriate mitigating measures, would not
constitute a major Federal action significantly affecting the quality
of the human environment.
The EA assesses the potential environmental effects of the
construction and operation of the proposed PGT Expansion II Project,
including two laterals off PGT's existing mainline system:
Medford Extension: 86.5 miles of new 12-inch-diameter
natural gas pipeline;
Coyote Springs Extension: 18.5 miles of new 12-inch-
diameter natural gas pipeline;
Two new meter stations: the Medford Meter Station and the
Coyote Springs Meter Station; and
Two new service taps and appurtenant facilities.
The purpose of the proposed facilities would be to:
(1) Provide about 16,400 million British thermal units per day
(MMBtu/d) of firm annual transportation service and additional 15,000
MMBtu/d of firm winter transportation service through the Medford
Extension; and
(2) Provide about 41,000 MMBtu/d of firm transportation service
through the Coyote Springs Extension. The EA also evaluates
alternatives to PGT's proposal.
The EA has been placed in the public files of the FERC and is
available for public inspection at: Federal Energy Regulatory
Commission, Division of Public Information, 941 North Capitol Street
NE., Room 3104, Washington, DC 20426, (202) 208-1371.
Copies have been mailed to Federal, state and local agencies,
public interest groups, interested individuals, newspapers, and parties
to this proceeding.
A limited number of copies of the EA are available from: Ms. Alisa
Lykens, Environmental Project Manager, Environmental Review and
Compliance Branch I, Office of Pipeline Regulation, Room 7312, 825
North Capitol Street NE., Washington, DC 20426, (202) 208-0766.
Any person wishing to comment on the EA may do so. Written comments
must reference Docket Nos. CP93-618-000 and CP93-618-001. Comments
should be addressed to: Office of the Secretary, Federal Energy
Regulatory Commission, 825 North Capitol Street NE., Washington, DC
20426.
Comments should be filed as soon as possible, but must be received
no later than October 28, 1994, to ensure consideration prior to a
Commission decision on this proposal. A copy of any comments should
also be sent to Ms. Alisa Lykens, Environmental Project Manager.
Comments will be considered by the Commission but will not serve to
make the commentor a party to the proceeding. Any person seeking to
become a party to the proceeding must file a motion to intervene
pursuant to Rule 214 of the Commission's Rules of Practice and
Procedure (18 CFR 385.214).
Additional information about this project is available from Ms.
Alisa Lykens, Environmental Review and Compliance Branch I, Office of
Pipeline Regulation, at (202) 208-0766.
Lois D. Cashell,
Secretary.