        Take notice that the following filings have been made with the 
    Commission:
    
    1. Coastal Itabo, Ltd.
    
    Docket No. EG99-232-000
    
        Take notice that on September 17, 1999, Coastal Itabo, Ltd. 
    (Applicant), P.O. Box 1111, George Town, Grand Cayman, Cayman Islands, 
    B.W.I. filed with the Federal Energy Regulatory Commission an 
    application for determination of exempt wholesale generator status 
    pursuant to Part 365 of the Commission's regulations.
        Applicant, a Cayman Islands Corporation intends to own, directly, 
    or indirectly through one or more affiliates, certain power generating 
    facilities in Dominican Republic.
        Comment date: October 12, 1999, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    2. Sunbury Generation, LLC
    
    Docket No. EG99-233-000
    
        Take notice that on September 17, 1999, Sunbury Generation, LLC, a 
    Delaware limited liability company with its headquarters at 677 Baeten 
    Road, Green Bay, Wisconsin, 54304, filed with the Federal Energy 
    Regulatory Commission, an application for determination of exempt 
    wholesale generator status pursuant to Part 365 of the Commission's 
    regulations.
        Sunbury Generation, LLC is a single member limited liability 
    company wholly-owned by Sunbury Holdings, LLC, a single member limited 
    liability company wholly-owned by WPS Power Development, Inc. (PDI). 
    PDI, in turn, is a wholly-owned, indirect subsidiary of WPS Resources 
    Corporation, headquartered in Green Bay, Wisconsin. WPS Resources 
    Corporation is an exempt public utility holding company. Its 
    subsidiaries include Wisconsin Public Service Corporation, an electric 
    and natural gas public utility serving portions of northeastern 
    Wisconsin and the upper peninsula of Michigan, and Upper Peninsula 
    Power Company, an electric public utility serving portions of the Upper 
    Peninsula of Michigan. Sunbury Generation, LLC will be taking title to 
    and operating certain assets located in Pennsylvania being divested by 
    PP&L Resources, Inc., PP&L, Inc., and Lady Jane Collieries, Inc. Among 
    the assets is the Sunbury Steam Electric Station, which includes four 
    coal-fired generating units, two combustion turbines and two diesel 
    units with total nameplate capacity of 472.5 MW. The Pennsylvania 
    Public Utilities Commission has determined that Sunbury Steam Electric 
    Station is an ``eligible facility'' because its acquisition and 
    operation of the units will benefit consumers, is in the public 
    interest, and does not violate State law. See Order, Docket no. R-
    00973954, Pennsylvania Public Utility Commission, September 15, 1999.
        Comment date: October 12, 1999, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    3. National Fuel Resources, Inc.; NFR Power, Inc. TransAlta Energy 
    Marketing (U.S.) Inc.; and TransAlta Energy Marketing Corp.
    
    [Docket Nos. ER95-1374-016; ER96-1122-013; ER98-3184-005; and ER96-
    1316-014]
    
        Take notice that on September 15, 1999, the above-mentioned power 
    marketers filed quarterly reports with the Commission in the above-
    mentioned proceedings for information only.
    
    4. Zapco Power Marketers, Inc.
    
    [Docket No. ER98-689-006]
    
        Take notice that on September 16, 1999, the above-mentioned power 
    marketer filed a quarterly report with the Commission in the above-
    mentioned proceeding for information only.
    
    5. Allegheny Power Service Corporation, on behalf of Monongahela 
    Power Company, The Potomac Edison Company and West Penn Power 
    Company (Allegheny Power)
    
    [Docket No. ER99-4168-000]
    
        Take notice that on September 16, 1999, Allegheny Power Service 
    Corporation on behalf of Monongahela Power Company, The Potomac Edison 
    Company and West Penn Power Company (Allegheny Power) filed Amendment 
    No. 1 to Supplement No. 35 to complete filing requirements for one (1) 
    new Customer of the Market Rate Tariff under which Allegheny Power 
    offers generation services. Allegheny Power requests a waiver of notice 
    requirements to make service available as of July 23, 1999, to Public 
    Service Electric and Gas Company.
        Copies of the filing have been provided to the Public Utilities 
    Commission of Ohio, the Pennsylvania Public Utility Commission, the 
    Maryland Public Service Commission, the Virginia State Corporation 
    Commission, the West Virginia Public Service Commission, and all 
    parties of record.
        Comment date: October 7, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    6. Sithe Pennsylvania Holdings, LLC; Sithe New Jersey Holdings, 
    LLC; Sithe Maryland Holdings, LLC; York Haven Power Company
    
    [Docket No. ER99-4245-000]
    
        Take notice that on September 16, 1999, Sithe Pennsylvania 
    Holdings, LLC (Sithe Pennsylvania), Sithe New Jersey Holdings (Sithe 
    New Jersey), and Sithe Maryland Holdings (Sithe Maryland), and York 
    Haven Power Company (York Haven) (collectively, the Applicants) 
    submitted for acceptance Applicants' proposed Amended Rate Schedules 
    No.
    
    [[Page 52497]]
    
    2. Applicants request certain authority to make sales of specified 
    ancillary services at market based rates in the geographic region 
    encompassed by the PJM Interconnection, L.L.C. (PJM), request certain 
    blanket authorizations concerning the sale of additional ancillary 
    services in PJM and ancillary services in other geographic markets, and 
    request waiver of the Commission's Regulations consistent with those 
    waivers granted to entities with market-based rate authority.
        Comment date: October 6, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    7. Cinergy Services, Inc.
    
    [Docket No. ER99-4456-000]
    
        Take notice that on September 16, 1999, Cinergy Services, Inc. 
    (Services) tendered for filing on behalf of its operating companies, 
    PSI Energy, Inc. (PSI), a First Supplemental Agreement, dated August 1, 
    1999, to the Interconnection Agreement, dated July 1, 1993, between The 
    City of Logansport, Indiana (Logansport), PSI and Services.
        Logansport and PSI have agreed to replace several sections to the 
    current language being used and adding a new Service Schedule F--
    Peaking Capacity and Energy.
        Copies of the filing were served on Logansport and the Indiana 
    Utility Regulatory Commission.
        Comment date: October 6, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    8. Carolina Power & Light Company
    
    [Docket No. ER99-4457-000]
    
        Take notice that on September 16, 1999, Carolina Power & Light 
    Company (CP&L) tendered for filing a Service Agreement for Short-Term 
    Firm Point-to-Point Transmission Service and a Service Agreement for 
    Non-Firm Point-to-Point Transmission Service with Commonwealth Edison 
    Company. Service to this Eligible Customer will be in accordance with 
    the terms and conditions of Carolina Power & Light Company's Open 
    Access Transmission Tariff.
        CP&L is requesting an effective date of September 3, 1999 for the 
    Agreements with Commonwealth Edison.
        Copies of the filing were served upon the North Carolina Utilities 
    Commission and the South Carolina Public Service Commission.
        Comment date: October 6, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    9. Rocky Road Power, LLC
    
    [Docket No. ER99-4459-000]
    
        Take notice that on September 16, 1999, Rocky Road Power, LLC filed 
    its quarterly report for the quarter ending June 30, 1999.
        Comment date: October 6, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    10. Southwestern Electric Power Company
    
    [Docket No. ER99-4468-000]
    
        Take notice that on September 16, 1999, Southwestern Electric Power 
    Company (SWEPCO) filed a revised signature page to the Interconnection 
    Agreement between SWEPCO and Tenaska Gateway Partners, Ltd. (Tenaska) 
    filed in Docket No. ER99-3712-000 on July 23, 1999. SWEPCO requests an 
    effective date of July 24, 1999 for the revised signature page to the 
    Interconnection Agreement.
        SWEPCO requests that the Commission accept the revised signature 
    page to the Agreement to become effective as of July 24, 1999, the 
    effective date of the Agreement.
        SWEPCO states that a copy of the filing was served on Tenaska and 
    the Public Utility Commission of Texas.
        Comment date: October 6, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    11. Cinergy Services, Inc.
    
    [Docket No. ER99-4469-000]
    
        Take notice that Cinergy Services, Inc. (Services) on September 15, 
    1999, tendered for filing on behalf of its operating companies, The 
    Cincinnati Gas & Electric Company and PSI Energy, Inc. (collectively 
    Cinergy Operating Companies) a Letter Agreement, dated August 9, 1999, 
    as a supplement to the Service Agreement, dated March 17, 1997, as 
    supplemented, between Edgar Electric Cooperative Association (Edgar) 
    and the Cinergy Operating Companies.
        Edgar and the Cinergy Operating Companies have agreed to procedures 
    for the curtailment of some of Edgar's load.
        Copies of the filing were served on Edgar and the State Regulatory 
    Commissions of Illinois, Ohio, Kentucky and Indiana.
        Comment date: October 6, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    12. UtiliCorp United Inc.
    
    [Docket No. ES99-31-000]
    
        Take notice that on March 1, 1999, UtiliCorp United Inc. 
    (UtiliCorp) filed an application seeking authorization to issue 
    corporate guaranties in an amount not to exceed one billion dollars 
    (U.S.) in support of long-term debt and related obligations to be 
    issued by one or more UtiliCorp subsidiaries in connection with the 
    acquisition of foreign gas and/or electric utility assets. On March 16, 
    1999, UtiliCorp filed a letter requesting the Commission defer 
    consideration on their application until they submitted the required 
    Board of Directors Resolutions for the application. On September 13, 
    1999, UtiliCorp filed the required Board of Directors Resolutions and 
    requested that the Commission take action on their application.
        Comment date: October 8, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest such filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, NE, Washington, DC 20426, in 
    accordance with rules 211 and 214 of the Commission's rules of practice 
    and procedure (18 CFR 385.211 and 385.214). All such motions or 
    protests should be filed on or before the comment date. Protests will 
    be considered by the Commission in determining the appropriate action 
    to be taken, but will not serve to make protestants parties to the 
    proceeding. Any person wishing to become a party must file a motion to 
    intervene. Copies of these filings are on file with the Commission and 
    are available for public inspection. This filing may also be viewed on 
    the Internet at http://www.ferc.fed.us/online/rims.htm (call 202-208-
    2222 for assistance).
    David P. Boergers,
    Secretary.
    [FR Doc. 99-25288 Filed 9-28-99; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
09/29/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-25288
Dates:
October 12, 1999, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application.
Pages:
52496-52497 (2 pages)
Docket Numbers:
Docket No. EG99-232-000, et al.
PDF File:
99-25288.pdf