99-22970. Notice of Intent To File Application for New License  

  • [Federal Register Volume 64, Number 171 (Friday, September 3, 1999)]
    [Notices]
    [Pages 48391-48392]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-22970]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of Intent To File Application for New License
    
    August 30, 1999.
        a. Type of filing: Notice of Intent to File Application for New 
    License.
        b. Project No.: 2726.
        c. Date file: July 27, 1999.
        d. Submitted By: Idaho Power Company, current licensee.
        e. Name of Project: Upper and Lower Malad.
        f. Location: On the Malad River in Gooding County, Idaho.
        g. Filed Pursuant to: Section 15 of the Federal Power Act, 18 CFR 
    16.6 of the Commission's regulations.
        h. Effective date of original license: May 1, 1965.
        i. Expiration date of original license: July 31, 2004.
        j. The project consists of the Upper Malad and the Lower Malad 
    Developments.
    
    [[Page 48392]]
    
        The Upper Malad Development consists of: (1) The 25-foot high and 
    150-foot-long concrete Upper Malad Dam, with Tainter gates; (2) an open 
    concrete conduit about 4,600 feet long and 15 feet wide; (3) a 10-foot-
    diameter and 230-foot-long welded steel plate penstock; (4) a 7,200-
    kilowatt vertical outdoor type generator; (5) a 0.6-mile-long 
    transmission line connecting the development to the Hagerman 
    Substation; and (6) other appurtenances.
        The Lower Malad Development consists of : (1) The 8.5 foot-high and 
    160-foot-long concrete Lower Malad Dam with Tainter gates; (2) an open 
    concrete conduit about 5,450 feet long and 17 feet wide; (3) a 12-foot-
    diameter and 287-foot-long welded steel plate penstock; (4) a 
    reinforced concrete powerhouse with an installed capacity of 13,500 
    kilowatts; and (5) other appurtenances.
        Pursuant to 18 CFR 16.7, information on the project is available 
    at: Idaho Power Company, 1221 West Idaho Street, Corporate Library, 
    Second Floor, Boise,ID 83707, or calling (208) 338-2491.
        1. FERC contact: Hector M. Perez (202) 219-2843, 
    hector.perexferc.fed.us.
        m. Pursuant to 18 CFR 16.9(b)(1) applications for a new license and 
    any competing license applications must be filed with the Commission at 
    least 24 months prior to the expiration of existing license. All 
    applications for license for this project must be filed by July 31, 
    2002.
    David P. Boergers,
    Secretary.
    [FR Doc. 99-22970 Filed 9-2-99; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
09/03/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-22970
Pages:
48391-48392 (2 pages)
PDF File:
99-22970.pdf