02-22370. Environmental Impact Statement for the North Eugene Bus Rapid Transit Corridor in the Eugene-Springfield Oregon Metropolitan Area  

  • Start Preamble

    AGENCY:

    Federal Transit Administration (FTA), U.S. Department of Transportation (DOT).

    ACTION:

    Notice of intent to prepare an environmental impact statement.

    SUMMARY:

    The Federal Transit Administration and Lane Transit District (LTD) intend to prepare an Environmental Impact Statement (EIS) in accordance with the National Environmental Policy Act (NEPA) for transit improvements in the North Eugene Bus Rapid Transit Corridor of the Eugene-Springfield metropolitan region. The purpose of this Notice of Intent is to notify interested parties of the intent to prepare an EIS and invite participation in the study. The Eugene-Springfield metropolitan region has adopted a long-range transportation plan, TransPlan, which identifies Bus Rapid Transit (BRT) as the preferred transit strategy for the twenty-year plan. BRT was adopted as a comprehensive system plan, which includes full build-out of five corridors. The general alignments of the five corridors have been identified in the approved plan. Phase 1, the initial 4 mile east-west corridor alignment is the first of the corridors to be implemented, and is currently in final design. The remaining four corridors will be implemented in priority order as determined by local elected officials through a corridor selection process. The North Eugene BRT Corridor has been identified as the next priority corridor to pursue in Eugene.

    The BRT project proposes to implement a major high capacity transit improvement in the North Eugene corridor that maintains livability in the metropolitan region, supports land use goals, optimizes the transportation system, increases overall corridor capacity, is environmentally sensitive, reflects community values, and is fiscally responsive.

    Meeting Dates: Agency Coordination Meeting: An agency coordination meeting will be held at 10 a.m. on Tuesday September 17, 2002 at the Lane Transit District, 3500 East 17th Avenue, Eugene, Oregon.

    Public Information Meeting: A public information meeting will be held from 4-7 p.m. on Thursday September 19th, 2002 at the Lane Transit District, 1700 East 17th Avenue, Eugene, Oregon. The Lane Transit District is accessible to persons with disabilities. Any individual with a disability who requires special assistance, such as a sign language interpreter, should contact Lane Transit District at (541) 682-6100 at least 48-hours in advance of the meeting in order for LTD to make necessary arrangements.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Agency Coordination should contact Lisa Gardner, LTD EIS Manager at (541) 682-6135 or (e-mail) lisa.gardner@ltd.lane.or.us. Public Information contact Sue Aufort, LTD Public Involvement Coordinator at (541) 682-6144 or (e-mail) sue.aufort@ltd.lane.or.us. Written comments should be sent to Lisa Gardner, North Springfield Corridor Project, Lane Transit District, 3500 East 17th Avenue, Eugene, OR 97403. Additional information on the North Springfield Corridor Project can also be found on the LTD Web site at: www.ltd.org. Additional information can be obtained from Rebecca Reyes-Alicea, Community Planner, Federal Transit Administration, at (206) 220-4464.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTAL INFORMATION:

    I. Notice of Intent

    This Notice of Intent to prepare an EIS is being published at this time to inform interested parties. The North Eugene Corridor Project is examining BRT alternatives in the North Eugene Corridor. FTA regulations and guidance will be used for the analysis and preparation of the north Eugene Corridor EIS.

    II. Study Area

    The North Eugene corridor encompasses a general alignment heading north from the downtown Eugene Transit Station at West 11th Avenue and Willamette Street in Eugene to the Gateway area in Springfield. The Start Printed Page 56346exact alignment will be determined as part of the EIS process.

    III. Alternatives

    All reasonable alternatives will be evaluated in the EIS including a No-Build Alternative, which will provide the basis for comparison of the build alternatives. The No-Build Alternative includes the existing transportation system plus improvements to the fixed-route transit system included in the Regional Transportation Plan Financially Constrained Transportation Network, excluding the implementation of BRT.

    IV. Probable Effects

    FTA and LTD will evaluate all significant transportation, environmental, social and economic impacts of the alternatives. Primary issues include support of state, regional and local land use and transportation plans and policies, neighborhood impacts, and environmental sensitivity. The impacts will be evaluated for both the construction period and for the long-term period of operation. Measures to mitigate any significant impact will be developed.

    Start Signature

    Issued on: August 28, 2002.

    R.F. Krochalis,

    FTA Regional Administrator.

    End Signature End Supplemental Information

    [FR Doc. 02-22370 Filed 8-30-02; 8:45 am]

    BILLING CODE 4910-57-M

Document Information

Published:
09/03/2002
Department:
Federal Transit Administration
Entry Type:
Notice
Action:
Notice of intent to prepare an environmental impact statement.
Document Number:
02-22370
Dates:
Agency Coordination Meeting: An agency coordination meeting will be held at 10 a.m. on Tuesday September 17, 2002 at the Lane Transit District, 3500 East 17th Avenue, Eugene, Oregon.
Pages:
56345-56346 (2 pages)
PDF File:
02-22370.pdf