2015-21748. Federal Acquisition Regulation; Technical Amendments  

  • Start Preamble Start Printed Page 53439

    AGENCY:

    Department of Defense (DoD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA).

    ACTION:

    Final rule.

    SUMMARY:

    This document makes amendments to the Federal Acquisition Regulation (FAR) in order to make editorial changes.

    DATES:

    Effective: September 3, 2015.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    The Regulatory Secretariat Division (MVCB), 1800 F Street NW., 2nd Floor, Washington, DC 20405, 202-501-4755, for information pertaining to status or publication schedules. Please cite FAC 2005-84, Technical Amendments.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    In order to update certain elements in 48 CFR parts 4, 31, 35, and 52 this document makes editorial changes to the FAR. The change to part 31 adds text erroneously deleted during the production of FAR Case 2011-019, published at 78 FR 37697 (June 21, 2013).

    Start List of Subjects

    List of Subject in 48 CFR Parts 4, 31, 35, and 52

    • Government procurement
    End List of Subjects Start Signature

    Dated: August 26, 2015.

    William Clark,

    Director, Office of Government-wide Acquisition Policy, Office of Acquisition Policy, Office of Government-wide Policy.

    End Signature

    Therefore, DoD, GSA, and NASA amend 48 CFR parts 4, 31, 35, and 52 as set forth below:

    Start Amendment Part

    1. The authority citation for 48 CFR parts 4 and 31 continues to read as follow:

    End Amendment Part Start Authority

    Authority: 40 U.S.C. 121(c); 10 U.S.C. chapter 137; and 51 U.S.C. 20113.

    End Authority Start Part

    PART 4—ADMINISTRATIVE MATTERS

    [Amended]
    End Part Start Amendment Part

    2. Amend section 4.605 by removing from paragraph (e) “by October 1, 2015” and adding “by March 31, 2016” in its place.

    End Amendment Part Start Part

    PART 31—CONTRACT COST PRINCIPLES AND PROCEDURES

    End Part Start Amendment Part

    3. Amend section 31.205-6 by revising paragraph (o)(2)(iii)(A) to read as follows:

    End Amendment Part
    Compensation for personal services.
    * * * * *

    (o) * * *

    (2) * * *

    (iii) * * *

    (A) Be measured and assigned in accordance with one of the following two methods described under paragraphs (o)(2)(iii)(A)(1) or (o)(2)(iii)(A)(2) of this subsection:

    (1) Generally accepted accounting principles. However, transitions from the pay-as-you-go method to the accrual accounting method must be handled according to paragraphs (o)(2)(iii)(A)(1)(i) through (iii) of this subsection.

    (i) In the year of transition from the pay-as-you-go method to accrual accounting for purposes of Government contract cost accounting, the transition obligation shall be the excess of the accumulated PRB obligation over the fair value of plan assets determined in accordance with subparagraph (o)(2)(iii)(E) of this section; the fair value must be reduced by the prepayment credit as determined in accordance with subparagraph (o)(2)(iii)(F) of this subsection.

    (ii) PRB cost attributable to the transition obligation assigned to the current year that is in excess of the amount assignable to accounting periods on the basis of a straight line amortization of the transition obligation over the average remaining working lives of active employees covered by the PRB plan or a 20-year period, whichever period is longer, is unallowable. However, if the plan is comprised of inactive participants only, the PRB cost attributable to the transition obligation assigned to the current year that is in excess of the amount assignable to accounting periods on a straight line amortization of the transition obligation over the average future life expectancy of the participants is unallowable.

    (iii) For a plan that transitioned from pay-as-you-go to accrual accounting for Government contract cost accounting prior to July 22, 2013, the unallowable amount of PRB cost attributable to the transition obligation amortization shall continue to be based on the cost principle in effect at the time of the transition until the original transition obligation schedule is fully amortized.

    (2) Contributions to a welfare benefit fund determined in accordance with applicable Internal Revenue Code. Allowable PRB costs based on such contributions shall—

    (i) Be measured using reasonable actuarial assumptions, which shall include a health care inflation assumption unless prohibited by the Internal Revenue Code provisions governing welfare benefit funds;

    (ii) Be assigned to accounting periods on the basis of the average working lives of active employees covered by the PRB plan or a 15 year period, whichever period is longer. However, if the plan is comprised of inactive participants only, the cost shall be spread over the average future life expectancy of the participants; and

    (iii) Exclude Federal income taxes, whether incurred by the fund or the contractor (including any increase in PRB costs associated with such taxes), unless the fund holding the plan assets is tax-exempt under the provisions of 26 U.S.C 501(c).

    * * * * *
    Start Part

    PART 35—RESEARCH AND DEVELOPMENT CONTRACTING

    End Part Start Amendment Part

    4. The authority citation for 48 CFR part 35 is revised to read as follow:

    End Amendment Part Start Authority

    Authority: 40 U.S.C. 121(c); 10 U.S.C. chapter 137; and 51 U.S.C. 20113.

    End Authority
    [Amended]
    Start Amendment Part

    5. Amend section 35.017-7 by removing “the Secretary of Transportation” and adding “the Secretary of Homeland Security” in its place.

    End Amendment Part Start Part

    PART 52—SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    End Part Start Amendment Part

    6. The authority citation for 48 CFR part 52 continues to read as follow:

    End Amendment Part Start Authority

    Authority: 40 U.S.C. 121(c); 10 U.S.C. chapter 137; and 51 U.S.C. 20113.

    End Authority Start Amendment Part

    7. Amend section 52.213-4 by revising the date of the clause and paragraph (b)(1)(ix) to read as follows:

    End Amendment Part
    Terms and Conditions—Simplified Acquisitions (Other Than Commercial Items).
    * * * * *

    Terms and Conditions—Simplified Acquisitions (Other Than Commercial Items) (SEP 2015)

    * * * * *

    (b) * * *

    (1) * * *

    (ix) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2014) (Executive Order 13658) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the Start Printed Page 53440United States (the 50 States and the District of Columbia)).

    * * * * *
    Start Amendment Part

    8. Amend section 52.219-1 by revising the date of Alternate I, introductory text and the first sentence of paragraph (c)(9) to read as follows:

    End Amendment Part
    Small Business Program Representations.
    * * * * *

    Alternate I (SEP 2015). As prescribed in 19.309(a)(2), add the following paragraph (c)(9) to the basic provision:

    (9) [Complete if offeror represented itself as disadvantaged in paragraph (c)(2) of this provision. * * *

    * * * * *
    End Supplemental Information

    [FR Doc. 2015-21748 Filed 9-2-15; 8:45 am]

    BILLING CODE 6820-EP-P

Document Information

Effective Date:
9/3/2015
Published:
09/03/2015
Department:
National Aeronautics and Space Administration
Entry Type:
Rule
Action:
Final rule.
Document Number:
2015-21748
Dates:
Effective: September 3, 2015.
Pages:
53439-53440 (2 pages)
Docket Numbers:
FAC 2005-84, Item II, Docket No. 2015-0052, Sequence No. 3
Topics:
Government procurement
PDF File:
2015-21748.pdf
CFR: (5)
48 CFR 4.605
48 CFR 31.205-6
48 CFR 35.017-7
48 CFR 52.213-4
48 CFR 52.219-1