94-24277. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 59, Number 189 (Friday, September 30, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-24277]
    
    
    [[Page Unknown]]
    
    [Federal Register: September 30, 1994]
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    [ER-FRL-4715-8]
    
     
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared September 12, 1994 through 
    September 16, 1994 pursuant to the Environmental Review Process (ERP), 
    under Section 309 of the Clean Air Act and Section 102(2)(C) of the 
    National Environmental Policy Act as amended. Requests for copies of 
    EPA comments can be directed to the Office of Federal Activities at 
    (202) 260-5076.
        An explanation of the ratings assigned to draft environmental 
    impact statements (EISs) was published in the Federal Register dated 
    April 8, 1994 (59 FR 16807).
    
    Draft EISs
    
        ERP No. D-AFS-K65163-CA Rating EC2, Oregon Creek Ecosystem 
    Management Project, Implementation, Tahoe National Forest, Downieville 
    Ranger District, Yuba and Sierra Counties, CA.
    
    Summary
    
        EPA expressed environmental concerns regarding potential project 
    impacts to water and air quality, as well as insufficient consideration 
    in the document to mining activities and activities on non-Federal 
    lands. EPA expressed particular concern regarding potential cumulative 
    impacts from the proposed management proposals, mining activities, and 
    actions on non-Federal lands.
        ERP No. D-AFS-L65231-ID Rating EC2, Charlie Tyson Ecosystem 
    Management Project, Implementation, Idaho Panhandle National Forests, 
    St. Maries Ranger District, Charlie Creek, Benewah County, ID.
    
    Summary
    
        EPA expressed environmental concern about fish habitat and 
    recommended that the preferred alternative adopt a combination of 
    forest health measures proposed in Alternative B and C.
        ERP No. D-COE-D28012-VA Rating EC2, Henrico County Water Treatment 
    Plant (WTP), Construction and Operation, James River Water Supply 
    Intake, Henrico, Goochland and Hanover Counties, VA.
    
    Summary
    
        EPA expressed environmental concern that the project was being 
    developed prior to the completion of the James River Management Plan 
    and recommended that any permit issued include appropriate conditions 
    that would require the incorporation of the Plan into its design. A 
    more detailed discussion of water needs, cumulative impacts, City of 
    Richmond withdrawals, and canal diversions was requested. Conditions on 
    withdrawals and wetland compensation were recommended.
        ERP No. D-COE-K36110-CA Rating EC2, Petaluma River Flood Control 
    Improvements, Implementation, City of Petaluma, Sonoma County, CA.
    
    Summary
    
        EPA expressed environmental concerns pertaining to proposed 
    mitigation, potential water quality impacts, hazardous waste 
    management, and cumulative impacts from proposed upstream projects. EPA 
    urged the Army Corps to continue to explore flood control techniques 
    which minimize impacts to the aquatic environment and enhance water 
    quality and river resources.
        ERP No. D-DOE-L09805-00 Rating EC1, Business Plan to Operate 
    Electric Utility Market, Transmission Services and Fish and Wildlife 
    Activities, Funding and Implementation, WA, OR, ID, CA, NV, AZ, MT, WY, 
    UT, NM and British Columbia.
    
    Summary
    
        EPA recommended that BPA re-visit selection of market-driven 
    alternative as proposed action and further evaluate compatibility of 
    the alternative with conservation resource protection goals and 
    policies.
        ERP No. D-FHW-L40193-ID Rating LO, Sandpoint North and South (NH-
    IR-F-CM-5116(68)) Projects, Construction, US 95 (Milepost 466.8 to 
    Milepost 4786), Funding and COE Section 404 Permit, City of Sandpoint, 
    Bonner County, ID.
    
    Summary
    
        EPA agrees that substantial direct and indirect effects were 
    avoided with the rejection of the ``West'' Alternative, therefore EPA 
    had no objections with the proposed action.
    
    Final EISs
    
        ERP No. F-AFS-L65146-ID, Van Camp Timber Sales and Winter Range 
    Improvements, Road Construction/Reconstruction, Implementation, 
    Clearwater National Forest, Lochsa Ranger District, Idaho County, ID.
    
    Summary
    
        EPA provided no formal written comments. EPA had no objection to 
    the preferred alternative as described in the EIS.
        ERP No. F-APH-A82124-00, Logs, Lumber and Other Unmanufactured Wood 
    Articles Importation, Improvements to the existing system to Prohibit 
    Introduction of Plant Pests into the United States.
    
    Summary
    
        EPA was concerned that the rule, as proposed, does not specifically 
    plan for the development of alternatives to methylbromide, a known 
    ozone depleting substance currently planned to be phased out of use by 
    the EPA.
        ERP No. F-BLM-K60023-CA, Rail-Cycle-Bolo Station Class III 
    Nonhazardous Waste Landfill Project, Construction and Operation, 
    Federal Land Exchange and Right-of-Way Grants, San Bernardino County, 
    CA.
    
    Summary
    
        The final EIS satisfactorily responded to EPA's prior comments, 
    therefore EPA had no objection to the proposed action.
        ERP No. F-DOE-L05205-00, PacifiCorp Capacity Power Sale Contract 
    for 1100 Megawatts (MW) Long-Term Contract for Peaking Capacity, 
    Implementation, WA, OR, ID, MT, WY, UT, CO, CA, NV, AZ, NM and British 
    Columbia.
    
    Summary
    
        EPA provided no formal written comments and had no objection to the 
    preferred alternative as described in the EIS.
        ERP No. F-FHW-K40201-AZ, Red Mountain Freeway (Loop 202) 
    Transportation Facility, Construction from Salt River between the Price 
    Freeway on the west and AZ-87 on the east, COE Section 404 and NPDES 
    Permits, Phoenix Metropolitan Area, Maricopa County, AZ.
    
    Summary
    
        Review of the final EIS was not deemed necessary. No formal comment 
    letter was sent to the preparing agency.
        ERP No. FS-COE-K32023-HI, Maalaea Harbor Improvements for Light-
    Draft-Vessels, Entrance Channel Realignment and Breakwater 
    Modification, Updated Information, Island of Maui, Maui County, HI.
    
    Summary
    
        Review of the final EIS was not deemed necessary. No formal comment 
    letter was sent to the preparing agency.
        ERP No. FS-FHW-D40072-VA, VA-234 Bypass Corridor Transportation 
    Improvement, VA-619 at Independent Hill to US 15 at Woolsey, Updated 
    and New Information, Funding, City of Manassas, Prince William County, 
    VA.
    
    Summary
    
        EPA expressed environmental concerns regarding traffic estimates 
    and recommended further analysis be done. EPA also, requested 
    additional noise and habitat terrestrial mitigation.
    
        Dated: September 27, 1994.
    Richard E. Sanderson,
    Director, Office of Federal Activities.
    [FR Doc. 94-24277 Filed 9-29-94; 8:45 am]
    BILLING CODE 6560-50-U
    
    
    

Document Information

Published:
09/30/1994
Department:
Environmental Protection Agency
Entry Type:
Uncategorized Document
Document Number:
94-24277
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: September 30, 1994, ER-FRL-4715-8