97-25800. NorAm Gas Transmission Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 62, Number 189 (Tuesday, September 30, 1997)]
    [Notices]
    [Pages 51096-51097]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-25800]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP97-730-000]
    
    
    NorAm Gas Transmission Company; Notice of Request Under Blanket 
    Authorization
    
    September 24, 1997.
        Take notice that on September 8, 1997, NorAm Gas Transmission 
    Company (NGT), 1600 Smith Street, Houston, Texas 77002, filed in Docket 
    No. CP97-730-000, a request pursuant to Sections 157.205 and 157.211 of 
    the Commission's Regulations under the Natural Gas Act (18 CFR 157.205 
    and 157.211) for authorization to construct and operate a tap in Hughes 
    County, Oklahoma to serve ARKLA, a division of NorAM Energy Corp. 
    (ARKLA), under its blanket certificate issued in Docket Nos. CP82-384-
    000 and CP82-384-001, pursuant to Section 7(c) of the Natural Gas Act, 
    all as more fully set forth in the request which is on file with the
    
    [[Page 51097]]
    
    Commission and open to public inspection.
        Specifically, NGT proposes to construct and operate a 2-inch 
    delivery tap and first-cut regulator to serve ARKLA. NGT says the tap 
    will be installed on its Line 2-AD in Section 36, Township 5 North, 
    Range 9 East, Hughes County, Oklahoma. NGT indicates that ARKLA will 
    install the domestic meter setting. NGT relates that the estimated 
    volumes to be delivered to this tap are approximately 160 MMBtu 
    annually and 1 MMBtu on a peak day. NGT states that the tap and first-
    cut regulator are to be constructed at an estimated cost of $2,600.00 
    and that ARKLA will reimburse NGT the cost of construction.
        NGT states that it will transport gas to ARKLA and provide service 
    under its tariff; that the volumes delivered are within ARKLA's 
    certificated entitlement; and that NGT's tariff does not prohibit the 
    addition of new delivery points. NGT says it has sufficient capacity to 
    accomplish the deliveries without detriment or disadvantage to its 
    other customers.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-25800 Filed 9-29-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
09/30/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-25800
Pages:
51096-51097 (2 pages)
Docket Numbers:
Docket No. CP97-730-000