2024-22321. Airworthiness Directives; DG Aviation GmbH (Type Certificate Previously Held by DG Flugzeugbau GmbH) Gliders  

  • Estimated Costs

    Action Labor cost Parts cost Cost per product Cost on U.S. operators
    Revise glider maintenance manual (Group 1 and Group 2 gliders) 1 work-hour × $85 per hour = $85 $0 85 8,585.
    Perform operational check of the free play adjustment of the automatic elevator hook-up (Group 1 and Group 2 gliders) 1 work-hour × $85 per hour = $85 0 85 8,585.
    Replace the elevator pushrod end (Group 1 gliders) 2 work-hours × $85 per hour = $170 100 270 7,020 (26 gliders).

    The FAA estimates the following costs to do any necessary elevator roller replacement (both Group 1 and Group 2 gliders) or elevator rod replacement (Group 2 gliders) that would be required based on the results of the operational check. The agency has no way of determining the number of gliders that might need these replacements:

    On-Condition Costs

    Action Labor cost Parts cost Cost per product
    Replace the elevator roller with a new one and adjust free play (Group 1 and Group 2 gliders) 2 work-hours × $85 per hour = $170 150 320
    Replace the elevator pushrod end (Group 2 gliders) 2 work-hours × $85 per hour = $170 100 270

Document Information

Effective Date:
10/15/2024
Published:
09/30/2024
Department:
Federal Aviation Administration
Entry Type:
Rule
Action:
Final rule; request for comments.
Document Number:
2024-22321
Dates:
This AD is effective October 15, 2024.
Pages:
79425-79428 (4 pages)
Docket Numbers:
Docket No. FAA-2024-2316, Project Identifier MCAI-2024-00381-G, Amendment 39-22854, AD 2024-19-12
RINs:
2120-AA64: Airworthiness Directives
RIN Links:
https://www.federalregister.gov/regulations/2120-AA64/airworthiness-directives
Topics:
Air transportation, Aircraft, Aviation safety, Incorporation by reference, Safety
PDF File:
2024-22321.pdf
Supporting Documents:
» U.S. DOT/FAA - Supplemental AD Documents
CFR: (1)
14 CFR 39