95-21990. NorAm Gas Transmission Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 60, Number 172 (Wednesday, September 6, 1995)]
[Notices]
[Pages 46267-46268]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-21990]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP95-714-000]
NorAm Gas Transmission Company; Notice of Request Under Blanket
Authorization
August 30, 1995.
Take notice that on August 28, 1995, NorAm Gas Transmission Company
(Applicant), 525 Milam Street, P.O. Box 21734, Shreveport, Louisiana
71151 filed in Docket No. CP95-714-000 for approval under Secs. 157.205
and 157.212 of the Commission's Regulations to construct and operate,
delivery points for Arkla, a division of NorAm Energy Corp. (Arkla),
all as more fully set forth in the request which is on file with the
Commission and open to public inspection.
[[Page 46268]]
Applicant proposes to construct and operate the following
facilities for deliveries of natural gas to Arkla, to serve its new
domestic and commercial customers: (a) One 1-inch delivery tap and
first cut regulatory on Applicant's Line T to serve Metropolitan Life
Insurance Company in Philips County, Arkansas; (b) one 1-inch delivery
tap and first-cut regulator on Applicant's Line T to serve Ray Fuller
Farms in Monroe County, Arkansas. The estimated annual volumes through
these facilities are 2,550 MMBtu annually and 48 MMBtu on a peak day.
The cost of construction is $4,598.00, which will be reimbursed by
Arkla.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Sec. 157.205 of the
Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 95-21990 Filed 9-5-95; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 09/06/1995
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 95-21990
- Pages:
- 46267-46268 (2 pages)
- Docket Numbers:
- Docket No. CP95-714-000
- PDF File:
-
95-21990.pdf