95-21994. Trailblazer Pipeline Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 60, Number 172 (Wednesday, September 6, 1995)]
    [Notices]
    [Pages 46268-46269]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-21994]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP95-699-000]
    
    
    Trailblazer Pipeline Company; Notice of Request Under Blanket 
    Authorization
    
    August 30, 1995.
        Take notice that on August 21, 1995, Trailblazer Pipeline Company 
    (Trailblazer), 701 East 22nd Street, Lombard, Illinois 60148, filed in 
    Docket No. CP95-699-000 a request pursuant to Sections 157.205 and 
    157.212 of the Commission's Regulations under the Natural Gas Act (18 
    CFR 157.205, 157.212) for authorization to construct and operate a new 
    natural gas delivery point under Trailblazer's blanket certificate 
    issued in Docket No. CP82-
    
    [[Page 46269]]
    497-000 pursuant to Section 7 of the Natural Gas Act, all as more fully 
    set forth in the request that is on file with the Commission and open 
    to public inspection.
        Trailblazer proposes to construct and operate a new delivery point 
    located in Gage County, Nebraska for Farmland Industries, Inc. 
    (Farmland). Trailblazer states that it would deliver, on an 
    interruptible basis, up to 30,000 Mcf of gas per day to Farmland for 
    use as feedstock. Trailblazer estimates that the new facilities, 
    consisting of a 4-inch sidetap, a 6-inch meter and approximately 3,500 
    feet of 6-inch pipeline, would cost $222,000. Trailblazer asserts that 
    it has sufficient capacity to provide the proposed services without 
    detriment or disadvantage to its peak day and annual delivery capacity.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    date after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-21994 Filed 9-5-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
09/06/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-21994
Pages:
46268-46269 (2 pages)
Docket Numbers:
Docket No. CP95-699-000
PDF File:
95-21994.pdf