95-21994. Trailblazer Pipeline Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 60, Number 172 (Wednesday, September 6, 1995)]
[Notices]
[Pages 46268-46269]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-21994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP95-699-000]
Trailblazer Pipeline Company; Notice of Request Under Blanket
Authorization
August 30, 1995.
Take notice that on August 21, 1995, Trailblazer Pipeline Company
(Trailblazer), 701 East 22nd Street, Lombard, Illinois 60148, filed in
Docket No. CP95-699-000 a request pursuant to Sections 157.205 and
157.212 of the Commission's Regulations under the Natural Gas Act (18
CFR 157.205, 157.212) for authorization to construct and operate a new
natural gas delivery point under Trailblazer's blanket certificate
issued in Docket No. CP82-
[[Page 46269]]
497-000 pursuant to Section 7 of the Natural Gas Act, all as more fully
set forth in the request that is on file with the Commission and open
to public inspection.
Trailblazer proposes to construct and operate a new delivery point
located in Gage County, Nebraska for Farmland Industries, Inc.
(Farmland). Trailblazer states that it would deliver, on an
interruptible basis, up to 30,000 Mcf of gas per day to Farmland for
use as feedstock. Trailblazer estimates that the new facilities,
consisting of a 4-inch sidetap, a 6-inch meter and approximately 3,500
feet of 6-inch pipeline, would cost $222,000. Trailblazer asserts that
it has sufficient capacity to provide the proposed services without
detriment or disadvantage to its peak day and annual delivery capacity.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
date after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 95-21994 Filed 9-5-95; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 09/06/1995
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 95-21994
- Pages:
- 46268-46269 (2 pages)
- Docket Numbers:
- Docket No. CP95-699-000
- PDF File:
-
95-21994.pdf