96-22654. Acquisition Regulation  

  • [Federal Register Volume 61, Number 174 (Friday, September 6, 1996)]
    [Rules and Regulations]
    [Pages 47064-47065]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-22654]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [FRL-5602-4]
    
    48 CFR Parts 1506, 1534, 1536, 1542, 1545, and 1552
    
    
    Acquisition Regulation
    
    AGENCY: Environmental Protection Agency.
    
    ACTION: Final rule.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Environmental Protection Agency (EPA) is removing from the 
    EPA Acquisition Regulation (EPAAR) (48 CFR Chapter 15) its coverage for 
    conduct of surveys; implementing OMB Circular A-109, Major Systems 
    Acquisitions; special aspects of sealed bidding in construction 
    contracting; additive or deductive items; indirect cost rates; and 
    management of Government property in the possession of contractors.
    
    EFFECTIVE DATE: September 6, 1996.
    
    FOR FURTHER INFORMATION CONTACT: Louise Senzel, Environmental 
    Protection Agency, Office of Acquisition Management (3802F), 401 M 
    Street, SW, Washington, D.C. 20460. Telephone: (202) 260-6204.
    
    SUPPLEMENTARY INFORMATION:
    
    A. Background
    
        This final rule eliminates from the EPAAR coverage on conduct of 
    market surveys, implementation of OMB Circular A-109 on Major Systems 
    Acquisitions, special aspects of sealed bidding in construction 
    contracting, additive or deductive items, indirect cost rates, and 
    management of Government property in the possession of contractors. The 
    coverage is obsolete, for which new FAR coverage is available; the 
    coverage is duplicative of OMB Circular A-109; or the coverage includes 
    procedures internal to EPA, unnecessary for inclusion in the EPAAR. 
    Codification of the Agency's internal procedures is unnecessary, since 
    they have no significant cost or administrative impact on contractors 
    or offerors. Consequently, EPA will retain any implementing guidance 
    and internal procedures in an internal directive, where necessary.
    
    B. Executive Order 12866
    
        The final rule is not a significant regulatory action for the 
    purposes of Executive Order 12866; therefore, no review is required by 
    the Office of Information and Regulatory Affairs.
    
    [[Page 47065]]
    
    C. Paperwork Reduction Act
    
        The Paperwork Reduction Act does not apply because this final rule 
    does not contain information collection requirements that require the 
    approval of OMB under the Paperwork Reduction Act of 1980 (44 U.S.C. 
    3501 et seq.)
    
    D. Regulatory Flexibility Act
    
        The EPA certifies that this final rule does not exert a significant 
    economic impact on a substantial number of small entities. The 
    requirements to contractors under the final rule impose no reporting, 
    record-keeping, or any compliance costs.
    
    E. Unfunded Mandates
    
        This final rule will not impose unfunded mandates on state or local 
    entities, or others.
    
    List of Subjects in 48 CFR Parts 1506, 1534, 1536, 1542, 1545, and 
    1552
    
        Government procurement.
    
        Authority: The provisions of this regulation are issued under 5 
    U.S.C. 301; Sec. 205(c),63 Stat. 390, as amended, 40 U.S.C. 486(c).
    
        Therefore, 48 CFR Chapter 15 is amended as set forth below:
        1. The authority for Parts 1506, 1536, 1542, 1545, and 1552, 
    continue to read as follows:
    
        Authority: Sec. 205(c), 63 stat. 390, as amended, 40 U.S.C. 
    486(c).
    
    Subpart 1506.371--[Removed]
    
        2. Subpart 1506.371 is removed in its entirety.
    
    PART 1534--[REMOVED]
    
        3. Part 1534 is Removed in its entirety.
    
    Subpart 1536.3--[Removed]
    
        4. Subpart 1536.3 (Secs. 1536.303 and 1536.303-70) is removed in 
    its entirety.
    
    
    1536.570  [Removed]
    
        5. Section 1536.570 is removed in its entirety.
    
    
    1542.705-1  [Removed]
    
        6. Section 1542.705-1 is removed in its entirety.
    
    Subpart 1545.5-[Removed]
    
        7. Subpart 1545.5 (Sec. 1545.502) is removed in its entirety.
    
    
    1552.236-71  [Removed]
    
        8. Section 1552.236-71 is removed in its entirety.
    
        Dated: August 19, 1996.
    Betty L. Bailey,
    Director, Office of Acquisition Management.
    [FR Doc. 96-22654 Filed 9-5-96; 8:45 am]
    BILLING CODE 6560-50-P
    
    
    

Document Information

Effective Date:
9/6/1996
Published:
09/06/1996
Department:
Environmental Protection Agency
Entry Type:
Rule
Action:
Final rule.
Document Number:
96-22654
Dates:
September 6, 1996.
Pages:
47064-47065 (2 pages)
Docket Numbers:
FRL-5602-4
PDF File:
96-22654.pdf
CFR: (6)
48 CFR 1506
48 CFR 1534
48 CFR 1536
48 CFR 1542
48 CFR 1545
More ...