96-22731. Northern Natural Gas Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 61, Number 174 (Friday, September 6, 1996)]
[Notices]
[Page 47118]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-22731]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP96-747-000]
Northern Natural Gas Company; Notice of Request Under Blanket
Authorization
August 30, 1996.
Take notice that on August 27, 1996, Northern Natural Gas Company
(Applicant), P.O. Box 3330, Omaha, Nebraska 68103-0330, filed in Docket
No. CP96-747-000 a request pursuant to Sections 157.205 and 157.212 of
the Commission's Regulations under the Natural Gas Act for
authorization to construct and operate a new delivery point, under
blanket certificate issued in Docket No. CP82-401-000,\1\ all as more
fully set forth in the request for authorization on file with the
Commission and open for public inspection.
---------------------------------------------------------------------------
\1\ See, 20 FERC para. 62,410 (1982).
---------------------------------------------------------------------------
Applicant proposes to construct a new delivery point to accommodate
natural gas deliveries to Emmetsburg Municipal Gas Works (Emmetsburg),
a local distribution company, for redelivery to AG Processing Inc.
(AGP) at their new facility located in Palo Alto County, Iowa.
Applicant states that the new delivery point will accommodate natural
gas deliveries for industrial consumption under its existing
transportation rate schedules and service agreements. Applicant holds a
blanket transportation certificate pursuant to Part 284 of the
Commission's Regulations issued in Docket No. CP86-435-000.\2\ The
estimated total volume proposed to be delivered is expected to result
in an increase in Applicant's peak day deliveries of 3,350 Mcf per day
and 796,000 Mcf on an annual basis.
---------------------------------------------------------------------------
\2\ See, 37 FERC para. 61,268 (1986).
---------------------------------------------------------------------------
The estimated cost to install the delivery point is $74,000.
Applicant states that Emmetsburg will reimburse Applicant for the cost
of these facilities. Applicant states that construction of the proposed
delivery point is not prohibited by its existing tariff and that it has
sufficient capacity to accommodate the service proposed herein without
determent or disadvantage to Applicant's other customers.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 96-22731 Filed 9-5-96; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 09/06/1996
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 96-22731
- Pages:
- 47118-47118 (1 pages)
- Docket Numbers:
- Docket No. CP96-747-000
- PDF File:
-
96-22731.pdf