E7-17427. Defense Federal Acquisition Regulation Supplement; Congressional Notification of Architect-Engineer Services/Military Family Housing Contracts (DFARS Case 2006-D015)
-
Start Preamble
AGENCY:
Defense Acquisition Regulations System, Department of Defense (DoD).
ACTION:
Final rule.
SUMMARY:
DoD has adopted as final, without change, an interim rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to implement Section 1031(a)(37) of the National Defense Authorization Act for Fiscal Year 2004. Section 1031(a)(37) amended the requirements for submission of a notification to Congress before the award of a contract for architectural and engineering services or construction design in connection with military construction, military family housing, or restoration or replacement of damaged or destroyed facilities.
EFFECTIVE DATE:
September 6, 2007.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Ms. Felisha Hitt, Defense Acquisition Regulations System, OUSD (AT&L) DPAP (DARS), IMD 3D139, 3062 Defense Pentagon, Washington, DC 20301-3062. Telephone (703) 602-0310; facsimile (703) 602-7887. Please cite DFARS Case 2006-D015.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
A. Background
DoD published an interim rule at 71 FR 58540 on October 4, 2006, to implement Section 1031(a)(37) of the National Defense Authorization Act for Fiscal Year 2004 (Pub. L. 108-136). Section 1031(a)(37) amended the requirements at 10 U.S.C. 2807, for submission of a notification to Congress before the award of a contract for architectural and engineering services or construction design in connection with military construction, military family housing, or restoration or replacement of damaged or destroyed facilities. The amendments increased the contract dollar threshold for submission from $500,000 to $1,000,000; and reduced the time period for submission, from 21 to 14 days before obligation of funds, when the notification is provided in electronic medium.
DoD received no comments on the interim rule. Therefore, DoD has adopted the interim rule as a final rule without change.
This rule was not subject to Office of Management and Budget review under Executive Order 12866, dated September 30, 1993.
B. Regulatory Flexibility Act
DoD certifies that this final rule will not have a significant economic impact on a substantial number of small entities within the meaning of the Regulatory Flexibility Act, 5 U.S.C. 601, et seq., because the rule relates to reporting requirements that are internal to the Government.
C. Paperwork Reduction Act
The Paperwork Reduction Act does not apply, because the rule does not impose any information collection requirements that require the approval of the Office of Management and Budget under 44 U.S.C. 3501, et seq.
Start List of SubjectsList of Subjects in 48 CFR Part 236
- Government procurement
Michele P. Peterson,
Editor, Defense Acquisition Regulations System.
PART 236—[AMENDED]
Interim Rule Adopted as Final Without Change
Accordingly, the interim rule amending 48 CFR Part 236, which was published at 71 FR 58540 on October 4, 2006, is adopted as a final rule without change.
End Part End Supplemental Information[FR Doc. E7-17427 Filed 9-5-07; 8:45 am]
BILLING CODE 5001-08-P
Document Information
- Comments Received:
- 0 Comments
- Effective Date:
- 9/6/2007
- Published:
- 09/06/2007
- Department:
- Defense Acquisition Regulations System
- Entry Type:
- Rule
- Action:
- Final rule.
- Document Number:
- E7-17427
- Dates:
- September 6, 2007.
- Pages:
- 51191-51191 (1 pages)
- RINs:
- 0750-AF41
- Topics:
- Government procurement
- PDF File:
- e7-17427.pdf
- CFR: (1)
- 48 CFR 236