2016-21333. Amendments to Existing Validated End-User Authorization in the People's Republic of China: Boeing Tianjin Composites Co. Ltd.  

  • Start Preamble

    AGENCY:

    Bureau of Industry and Security, Commerce.

    ACTION:

    Final rule.

    SUMMARY:

    In this rule, the Bureau of Industry and Security (BIS) amends the Export Administration Regulations (EAR) to revise the existing Validated End-User (VEU) list for the People's Republic of China (PRC) by updating the list of eligible destinations (facilities) for VEU Boeing Tianjin Composites Co. Ltd. (BTC). Specifically, BIS amends supplement No. 7 to part 748 of the EAR to change the written address of BTC's existing facility. The physical location of the facility has not changed. BIS updated the facility address after receiving notification of the change from BTC. The End-User Review Committee reviewed and authorized the amendment in accordance with established procedures. The updated address contributes to maintaining accurate location information for BTC's VEU.

    DATES:

    This rule is effective September 6, 2016.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Chair, End-User Review Committee, Office of the Assistant Secretary, Export Administration, Bureau of Industry and Security, U.S. Department of Commerce, Phone: 202-482-5991; Email: ERC@bis.doc.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Background

    Authorization Validated End-User

    Validated End-Users (VEUs) are designated entities located in eligible destinations to which eligible items may be exported, reexported, or transferred (in-country) under a general authorization instead of a license. The names of the VEUs, as well as the dates they were so designated, and their respective eligible destinations (facilities) and items are identified in supplement No. 7 to part 748 of the EAR. Under the terms described in that supplement, VEUs may obtain eligible items without an export license from BIS, in conformity with § 748.15 of the EAR. Eligible items vary between VEUs and may include commodities, software, and technology, except those controlled for missile technology or crime control reasons on the Commerce Control List (CCL) (part 774 of the EAR).

    VEUs are reviewed and approved by the U.S. Government in accordance with the provisions of § 748.15 and supplement Nos. 8 and 9 to part 748 of the EAR. The End-User Review Committee (ERC), composed of representatives from the Departments of State, Defense, Energy, Commerce, and other agencies as appropriate, is responsible for administering the VEU program. BIS amended the EAR in a final rule published on June 19, 2007 (72 FR 33646), to create Authorization VEU.

    Amendment to Existing VEU Authorization for Boeing Tianjin Composites Co. Ltd. (BTC) in the People's Republic of China

    Revision to the List of “Eligible Destinations” for BTC

    In this rule, BIS amends supplement No. 7 to part 748 to revise BTC's VEU authorization. Specifically, in this rule, BIS updates the written address of BTC's facility in the People's Republic of China to which the company's eligible items may be exported, reexported or transferred (in-country). The physical location of the facility has not changed.

    The amendment to the address of BTC's facility is in response to a request from BTC. This amendment was approved by the ERC. The revision is as follows:Start Printed Page 61105

    Revision to Address of BTC's Eligible Destination (Facility)

    Current address: Boeing Tianjin Composites Co. Ltd., No. 4-388 Hebei Road, Tanggu Tianjin, China.

    New address: Boeing Tianjin Composites Co. Ltd., 4566 Hebei Road, Marine Hi-Tech Development Area, Tanggu District, Tianjin, China 300451.

    Export Administration Act

    Although the Export Administration Act expired on August 20, 2001, the President, through Executive Order 13222 of August 17, 2001, 3 CFR, 2001 Comp., p. 783 (2002), as amended by Executive Order 13637 of March 8, 2013, 78 FR 16129 (March 13, 2013) and as extended by the Notice of August 4, 2016, 81 FR 52587 (August 8, 2016), has continued the Export Administration Regulations in effect under the International Emergency Economic Powers Act. BIS continues to carry out the provisions of the Export Administration Act, as appropriate and to the extent permitted by law, pursuant to Executive Order 13222 as amended by Executive Order 13637.

    Rulemaking Requirements

    1. Executive Orders 13563 and 12866 direct agencies to assess all costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits (including potential economic, environmental, public health and safety effects, distributive impacts, and equity). Executive Order 13563 emphasizes the importance of quantifying both costs and benefits, reducing costs, harmonizing rules, and promoting flexibility. This rule has been determined to be not significant for purposes of Executive Order 12866.

    2. This rule involves collections previously approved by the Office of Management and Budget (OMB) under Control Number 0694-0088, “Multi-Purpose Application,” which carries a burden hour estimate of 43.8 minutes to prepare and submit form BIS-748; and for recordkeeping, reporting and review requirements in connection with Authorization VEU, which carries an estimated burden of 30 minutes per submission. This rule is expected to result in a decrease in license applications submitted to BIS. Total burden hours associated with the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.) (PRA) and OMB Control Number 0694-0088 are not expected to increase significantly as a result of this rule. Notwithstanding any other provisions of law, no person is required to respond to, nor be subject to a penalty for failure to comply with a collection of information subject to the requirements of the PRA, unless that collection of information displays a currently valid OMB Control Number.

    3. This rule does not contain policies with Federalism implications as that term is defined under Executive Order 13132.

    4. Pursuant to the Administrative Procedure Act (APA), 5 U.S.C. 553(b)(B), BIS finds good cause to waive the otherwise applicable requirement that this rule be subject to notice and the opportunity for public comment because it is unnecessary. In determining whether to grant VEU designations, a committee of U.S. Government agencies evaluates information about and commitments made by candidate companies, the nature and terms of which are set forth in 15 CFR part 748, supplement No. 8. The criteria for evaluation by the committee are set forth in 15 CFR 748.15(a)(2). The information, commitments, and criteria for this extensive review were all established through the notice of proposed rulemaking and public comment process (71 FR 38313 (July 6, 2006) (proposed rule), and 72 FR 33646 (June 19, 2007) (final rule)). Given the similarities between the authorizations provided under the VEU program and export licenses (as discussed further below), the publication of this information does not establish new policy. In publishing this final rule, BIS amends the authorization for an existing eligible VEU to update the address of the eligible destination (facility). This change has been made within the established regulatory framework of the VEU program. Further, this rule does not abridge the rights of the public or eliminate the public's option to export under any of the forms of authorization set forth in the EAR.

    Publication of this rule in other than final form is unnecessary because the authorizations granted in the rule are consistent with the authorizations granted to exporters for individual licenses (and amendments or revisions thereof), which do not undergo public review. In addition, as with license applications, VEU authorization applications contain confidential business information, which is necessary for the extensive review conducted by the U.S. Government in assessing such applications. This information is extensively reviewed according to the criteria for VEU authorizations, as set out in 15 CFR 748.15(a)(2). Additionally, just as license applications are reviewed through an interagency review process, the authorizations granted under the VEU program involve interagency deliberation and result from review of public and non-public sources, including licensing data, and the measurement of such information against the VEU authorization criteria. Given the nature of the review, and in light of the parallels between the VEU application review process and the review of license applications, public comment on this authorization and subsequent amendments prior to publication is unnecessary. Moreover, because, as noted above, the criteria and process for authorizing and administering VEUs were developed with public comments, allowing additional public comment on this amendment to individual VEU authorizations, which was determined according to those criteria, is unnecessary.

    Section 553(d) of the APA generally provides that rules may not take effect earlier than thirty (30) days after they are published in the Federal Register. However, BIS finds good cause to waive the 30-day delay in effectiveness for this rule pursuant to 5 U.S.C. 553(d)(3) because the delay would be contrary to the public interest. BIS is simply amending the authorization of an existing VEU to update the address of the eligible destination (facility). BIS amends the EAR in this rule consistent with established objectives and parameters administered and enforced by the responsible designated departmental representatives to the End-User Review Committee. Delaying this action's effectiveness would likely cause confusion regarding which items are authorized by the U.S. Government to be shipped to which eligible destination (facility), which would stifle the purpose of the VEU Program. Accordingly, it is contrary to the public interest to delay this rule's effectiveness.

    No other law requires that a notice of proposed rulemaking and an opportunity for public comment be given for this final rule. Because a notice of proposed rulemaking and an opportunity for public comment are not required under the APA or by any other law, the analytical requirements of the Regulatory Flexibility Act (5 U.S.C. 601 et seq.) are not applicable. As a result, no final regulatory flexibility analysis is required and none has been prepared.

    Start List of Subjects

    List of Subjects in 15 CFR Part 748

    • Administrative practice and procedure
    • Exports
    • Reporting and recordkeeping requirements
    End List of Subjects Start Printed Page 61106

    Accordingly, part 748 of the EAR (15 CFR parts 730-774) is amended as follows:

    Start Part

    PART 748—[AMENDED]

    End Part Start Amendment Part

    1. The authority citation for part 748 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 50 U.S.C. 4601 et seq.; 50 U.S.C. 1701 et seq.; E.O. 13026, 61 FR 58767, 3 CFR, 1996 Comp., p. 228; E.O. 13222, 66 FR 44025, 3 CFR, 2001 Comp., p. 783; Notice of August 4, 2016, 81 FR 52587 (August 8, 2016).

    End Authority Start Amendment Part

    2. Amend supplement No. 7 to part 748 by revising the entry for “Boeing Tianjin Composites Co. Ltd.” in “China (People's Republic of)” to read as follows:

    End Amendment Part

    Supplement No. 7 to Part 748—Authorization Validated End-User (VEU): List of Validated End-Users, Respective Items Eligible for Export, Reexport and Transfer, and Eligible Destinations

    CountryValidated end-userEligible items (by ECCN)Eligible destinationFederal Register citation
    Nothing in this Supplement shall be deemed to supersede other provisions in the EAR, including but not limited to § 748.15(c).
    *         *         *         *         *         *         *
    Boeing Tianjin Composites Co. Ltd1B001.f, 1D001 (limited to “software” specially designed or modified for the “use” of equipment controlled by 1B001.f), 2B001.b.2 (limited to machine tools with accuracies no better than (i.e., not less than) 13 microns), 2D001 (limited to “software,” other than that controlled by 2D002, specially designed or modified for the “use” of equipment controlled by 2B001.b.2), and 2D002 (limited to “software” for electronic devices, even when residing in an electronic device or system, enabling such devices or systems to function as a “numerical control” unit, capable of coordinating simultaneously more than 4 axes for “contouring control” controlled by 2B001.b.2)Boeing Tianjin Composites Co. Ltd., 4566 Hebei Road, Marine Hi-Tech Development Area, Tanggu District, Tianjin, China 30045172 FR 59164, 10/19/07. 74 FR 19382, 4/29/09. 77 FR 10953, 2/24/12. 77 FR 40258, 7/9/12. 81 FR [INSERT PAGE NUMBER], September 6, 2016.
    *         *         *         *         *         *         *
    Start Signature

    Dated: August 30, 2016.

    Kevin J. Wolf,

    Assistant Secretary for Export Administration.

    End Signature End Supplemental Information

    [FR Doc. 2016-21333 Filed 9-2-16; 8:45 am]

    BILLING CODE 3510-33-P

Document Information

Effective Date:
9/6/2016
Published:
09/06/2016
Department:
Industry and Security Bureau
Entry Type:
Rule
Action:
Final rule.
Document Number:
2016-21333
Dates:
This rule is effective September 6, 2016.
Pages:
61104-61106 (3 pages)
Docket Numbers:
Docket No. 160810722-6722-01
RINs:
0694-AH05
Topics:
Administrative practice and procedure, Exports, Reporting and recordkeeping requirements
PDF File:
2016-21333.pdf
Supporting Documents:
» Implementation of Additional Sanctions against Russia and Belarus under the Export Administration Regulations and Refinements to Existing Controls
» Imposition of Technology Export Controls on Instruments for the Automated Chemical Synthesis of Peptides
» Wassenaar Arrangement 2018 Plenary Decisions Implementation: Revisions Related to National Security Controls
CFR: (1)
15 CFR 748