2019-19280. Notice of Institution of Section 206 Proceeding and Refund Effective Date: PJM Interconnection, LLC  

  • Start Preamble Start Printed Page 46948

    On August 30, 2019, the Commission issued an order in Docket No. EL19-61-000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e (2012), instituting an investigation into whether to require PJM Interconnection, L.L.C. (PJM) to revise provisions of Schedule 6 of the PJM Amended and Restated Operating Agreement to reinstate the competitive proposal window process to projects needed solely to address individual transmission owner Form No. 715 local planning criteria. PJM Interconnection, L.L.C., 168 FERC 61,132 (2019).

    The refund effective date in Docket No. EL19-61-000, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register.

    Any interested person desiring to be heard in Docket No. EL19-61-000 must file a notice of intervention or motion to intervene, as appropriate, with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rule 214 of the Commission's Rules of Practice and Procedure, 18 CFR 385.214, within 21 days of the date of issuance of the order.

    Start Signature

    Dated: August 30, 2019.

    Nathaniel J. Davis, Sr.,

    Deputy Secretary.

    End Signature End Preamble

    [FR Doc. 2019-19280 Filed 9-5-19; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
09/06/2019
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2019-19280
Dates:
PJM Interconnection, LLC
Pages:
46948-46948 (1 pages)
Docket Numbers:
Docket No. EL19-61-000
PDF File:
2019-19280.pdf