The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft Supplement 61, to the Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, NUREG-1437, regarding the proposed renewal of Renewed Facility Operating License No. NPF-58 for an additional 20 years of operation for Perry Nuclear Power Plant, Unit 1 (Perry Plant). Perry Plant is located in Perry, Ohio, approximately 35 miles northeast of Cleveland, OH. Possible alternatives to the proposed action of license renewal include no action and reasonable replacement power alternatives.
DATES:
The staff will hold two virtual public meetings through online webinar and teleconference call on the draft supplemental environmental impact statement, including a presentation on the preliminary findings and a transcribed public comment session. The meetings will be held on October 1, 2024, at 1 p.m. eastern time (ET) and October 2 2024, at 6 p.m. ET. The public meeting details can be found on the NRC's Public Meeting Schedule at https://www.nrc.gov/pmns/mtg. Members of the public are invited to submit comments by October 21, 2024. Comments received after that date will be considered if it is practical to do so, but the NRC is able to ensure consideration only for comments received on or before that date.
ADDRESSES:
You may submit comments by any of the following methods; however, the NRC encourages electronic comment submission through the Federal rulemaking website:
- Federal rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2023-0136. Address questions about Docket IDs in Regulations.gov to Stacy Schumann; telephone: 301-415-0624; email: Stacy.Schumann@nrc.gov. For technical questions, contact the individual listed in the For Further Information Contact section of this document.
- Email: Comments may be submitted to the NRC electronically using the email address PerryEnvironmental@nrc.gov.
- Mail comments to: Office of Administration, Mail Stop: TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, ATTN: Program Management, Announcements and Editing Staff.
For additional direction on obtaining information and submitting comments, see “Obtaining Information and Submitting Comments” in the SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT:
Lance Rakovan, Senior Environmental Project Manager, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-2589; email: Lance.Rakovan@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2023-0136 when contacting the NRC about the availability of information regarding this document. You may obtain publicly available information related to this action using any of the following methods:
- Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2023-0136.
- NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly ( print page 72902) available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select “Begin Web-based ADAMS Search.” For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, at 301-415-4737, or by email to PDR.Resource@nrc.gov. Draft Supplement 61, to the GEIS for License Renewal of Nuclear Plants, NUREG-1437, is available in ADAMS under Accession No. ML24241A256.
- NRC's PDR: The PDR, where you may examine and order copies of publicly available documents, is open by appointment. To make an appointment to visit the PDR, please send an email to PDR.Resource@nrc.gov or call 1-800-397-4209 or 301-415-4737, between 8 a.m. and 4 p.m. ET, Monday through Friday, except Federal holidays.
- Public Library: A copy of the Draft Supplement 61, to the GEIS for License Renewal of Nuclear Plants, NUREG-1437, regarding the proposed renewal of Renewed Facility Operating License No NPF-58, for an additional 20 years of operation for Perry Plant, will be available for public review at the Perry Public Library, 3753 Main St, Perry, OH 44081.
B. Submitting Comments
The NRC encourages electronic comment submission through the Federal rulemaking website ( https://www.regulations.gov). Please include Docket ID NRC-2023-0136 in your comment submission.
The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission. The NRC will post all comment submissions at https://www.regulations.gov as well as enter the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information.
If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS.
II. Discussion
The NRC is issuing for public comment draft Supplement 61 to the GEIS for License Renewal of Nuclear Plants, NUREG-1437, regarding the proposed renewal of Renewed Facility Operating License No. NPF-58, for an additional 20 years of operation for Perry Plant. Draft site-specific Supplement 61 to the GEIS includes the preliminary analysis that evaluates the environmental impacts of the proposed action and alternatives to the proposed action. The NRC staff's preliminary recommendation is that the adverse environmental impacts of license renewal for Perry Plant are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable.
Dated: September 3, 2024.
For the Nuclear Regulatory Commission.
Melissa Ralph,
Deputy Director, Division of Rulemaking, Environmental, and Financial Support, Office of Nuclear Material Safety and Safeguards.
[FR Doc. 2024-20080 Filed 9-5-24; 8:45 am]
BILLING CODE 7590-01-P
Document Information
- Published:
- 09/06/2024
- Department:
- Nuclear Regulatory Commission
- Entry Type:
- Notice
- Action:
- Public meeting and request for comment.
- Document Number:
- 2024-20080
- Dates:
- The staff will hold two virtual public meetings through online webinar and teleconference call on the draft supplemental environmental impact statement, including a presentation on the preliminary findings and a transcribed public comment session. The meetings will be held on October 1, 2024, at 1 p.m. eastern time (ET) and October 2 2024, at 6 p.m. ET. The public meeting details can be found on the NRC's Public Meeting Schedule at https://www.nrc.gov/pmns/mtg. Members of the public are invited ...
- Pages:
- 72901-72902 (2 pages)
- Docket Numbers:
- Docket No. 50-440, NRC-2023-0136
- PDF File:
- 2024-20080.pdf