NUCLEAR REGULATORY COMMISSION
[Docket No. 50-397]
Washington Public Power Supply System; Notice of Withdrawal of
Amendment to Facility Operating License
The U.S. Nuclear Regulatory Commission (the Commission) has granted
a request by Washington Public Power Supply System (the licensee) to
withdraw its May 10, 1993, and supplement dated May 21, 1993,
application for an amendment to Facility Operating License No. NPF-21
for operation of the Nuclear Project No. 2, located in Benton County,
Washington.
The proposed amendment would have revised Section 6 (Administrative
Controls) of the Technical Specifications (TS) to modify the
composition, organizational assignments, and reporting relationship of
the personnel performing the Independent Safety Engineering Group
(ISEG) function in the current Nuclear Safety Assurance Division
(NSAD). Also, the change would have modified the title of the Quality
Assurance (QA) member of the Plant Operations Committee (POC) to
reflect the new QA organization.
The Commission had previously issued a Notice of Consideration of
Issuance of this amendment published in the Federal Register on August
18, 1993 (58 FR 43937). However, by letter dated September 8, 1993, the
licensee withdrew the proposed change.
For further details with respect to this action, see the
application for amendment dated May 10, 1993, and supplement dated May
21, 1993, and the licensee's letter dated September 8, 1993, which
withdrew the application for license amendment.
The above documents are available for public inspection at the
Commission's Public Document Room, the Gelman Building, 2120 L Street,
NW., Washington, DC, and at the local public document room located at
the Richland Public Library, 955 Northgate Street, Richland, Washington
99352.
Dated at Rockville, Maryland, this 29th day of August 1995.
For the Nuclear Regulatory Commission.
Brian E. Holian,
Senior Project Manager, Project Directorate IV-2, Division of Reactor
Projects III/IV, Office of Nuclear Reactor Regulation.
[FR Doc. 95-22184 Filed 9-6-95; 8:45 am]
BILLING CODE 7590-01-P