Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a. Type of Application: Original Major License.
b. Project No.: 13005-003.
c. Date filed: December 14, 2011.
d. Applicant: Oliver Hydro LLC.
e. Name of Project: William Bacon Oliver Lock and Dam Hydroelectric Project.
f. Location: At the U.S. Army Corps of Engineers' (Corps) William Bacon Oliver Lock and Dam on the Black Warrior River, in Tuscaloosa County, Alabama. The project would occupy 8.7 acres of United States lands administered by the Corps' Mobile District.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)—825(r).
h. Applicant Contact: Brent Smith, Symbiotics LLC, 371 Upper Terrace, Suite 2, Bend, OR 97702; (541) 330-8779; or email at brent.smith@symbioticsenergy.com.
i. FERC Contact: Allan Creamer at (202) 502-8365, or via email at allan.creamer@ferc.gov.
j. Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice.
All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, or toll free at 1-866-208-3676, or for TTY, (202) 502-8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
k. This application has been accepted, but is not ready for environmental analysis at this time.
l. The proposed project would utilize the Corps' existing William Bacon Oliver Lock and Dam, and would consist of the following new facilities: (1) A forebay; (2) an intake structure; (3) a powerhouse containing two generating units with a total capacity of 11.72 megawatts (MW); (4) a 150-foot-long, 68-foot-wide tailrace; (5) a proposed 1.7-mile-long, 25 kilovolt (kV) transmission line; (6) a switchyard; and (7) appurtenant facilities. The proposed project would have an average annual generation of 42.6 GWh, and operate in a run-of-river mode utilizing surplus water from the William Bacon Oliver Lock and Dam, as directed by the Corps.
m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov,, using the “eLibrary” link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above.
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.
n. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any protests or motions to intervene must be received on, or before, the specified deadline date for the particular application.
All filings must: (1) Bear in all capital letters the title “PROTEST” or “MOTION TO INTERVENE;” (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to Start Printed Page 55203intervene must be served upon each representative of the applicant specified in the particular application.
o. Procedural schedule and final amendments: The application will be processed according to the following Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate.
Issue Scoping Document 1 August 2012. Issue Scoping Document 2 (if necessary) October 2012. Notice of application is ready for environmental analysis February 2013. Notice of availability of the EA October 2013. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis.
n. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified intervention deadline date, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified intervention deadline date. Applications for preliminary permits will not be accepted in response to this notice.
A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a development application. A notice of intent must be served on the applicant(s) named in this public notice.
Start SignatureDated: August 31, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-22052 Filed 9-6-12; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 09/07/2012
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2012-22052
- Pages:
- 55202-55203 (2 pages)
- Docket Numbers:
- Project No. 13005-003
- PDF File:
- 2012-22052.pdf