  • [Federal Register Volume 60, Number 174 (Friday, September 8, 1995)]
    [Notices]
    [Pages 46829-46830]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-22217]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [FE Docket No. PP-107]
    
    
    Application for Presidential Permit, Arizona Public Service 
    Company
    
    AGENCY: Office of Fossil Energy, DOE.
    
    ACTION: Notice of application.
    
    -----------------------------------------------------------------------
    
    SUMMARY: Arizona Public Service Company (APS) has applied for a 
    Presidential Permit in order to construct a new transmission facility 
    at the U.S. border with Mexico.
    
    DATES: Comments, protests or requests to intervene must be submitted on 
    or before October 10, 1995.
    
    ADDRESSES: Comments, protests or requests to intervene should be 
    addressed as follows: Office of Coal & Electricity (FE-52), Office of 
    Fuels Programs, Office of Fossil Energy, Department of Energy, 1000 
    Independence Avenue, SW, Washington, DC 20585.
    
    FOR FURTHER INFORMATION CONTACT: Warren E. Williams (Program Office) 
    202-586-9629 or Mike Skinker (Program Attorney) 202-586-6667.
    
    SUPPLEMENTARY INFORMATION: The construction, connection, operation, and 
    maintenance of facilities at the international border of the United 
    States for the transmission of electrical energy is prohibited in the 
    absence of a Presidential permit pursuant to Executive Order No. 12038. 
    Exports of electricity from the United States to a foreign country are 
    also regulated and require authorization under section 202(e) of the 
    Federal Power Act.
        On June 22, 1995, APS filed an application with the Office of 
    Fossil Energy (FE) of the Department of Energy (DOE) for a Presidential 
    permit. This application has been docketed as PP-107. In its 
    application, APS proposes to tap an existing 34.5-kilovolt (kV) line 
    that originates at the existing Fairview Substation in Douglas, 
    Arizona, and to extend the tap approximately 4,000 feet to the 
    international border adjacent to Agua Prieta, Sonora, Mexico. The 
    Fairview substation will be upgraded by adding a transformer and other 
    equipment in order to accommodate the proposed facilities. The proposed 
    power line structures are to be located within a state highway right-
    of-way. 
    
    [[Page 46830]]
    
    
    Procedural Matters
    
        Any person desiring to be heard or to protest this application 
    should file a petition to intervene or protest at the address provided 
    above in accordance with 385.211 or 385.214 of the Rules of Practice 
    and Procedure (18 CFR 385.211, 385.214).
        Any such petitions and protests should be filed with the DOE on or 
    before the date listed above. Additional copies of such petitions to 
    intervene or protest also should be filed directly with: Dennis Beals, 
    Manager, Bulk Power Trading & Customer Services, Arizona Public Service 
    Company, P.O. Box 53999, Station 9860, Phoenix, AZ 85072-3999 and Bruce 
    A. Gardner, Esq., Senior Attorney, Arizona Public Service Company, P.O. 
    Box 53999, Station 9820, Phoenix, AZ 85072-3999.
        Pursuant to 18 CFR 385.211, protests and comments will be 
    considered by the DOE in determining the appropriate action to be 
    taken, but will not serve to make protestants parties to the 
    proceeding. Any person wishing to become a party must file a petition 
    to intervene under 18 CFR 385.214. Section 385.214 requires that a 
    petition to intervene must state, to the extent known, the position 
    taken by the petitioner and the petitioner's interest in sufficient 
    factual detail to demonstrate either that the petitioner has a right to 
    participate because it is a State Commission; that it has or represents 
    an interest which may be directly affected by the outcome of the 
    proceeding, including any interest as a consumer, customer, competitor, 
    or security holder of a party to the proceeding; or that the 
    petitioner's participation is in the public interest.
        A final decision will be made on the application for Presidential 
    permit contained in docket PP-107 after a determination is made by the 
    DOE that the proposed action is in the public interest and will not 
    adversely impact on the reliability of the U.S. electric power supply 
    system.
        Before a Presidential permit or electricity export authorization 
    may be issued or amended, the environmental impacts of the proposed DOE 
    action must be evaluated pursuant to the National Environmental Policy 
    Act of 1969 (NEPA).
        Copies of this application will be made available, upon request, 
    for public inspection and copying at the address provided above.
    
        Issued in Washington, DC on August 31, 1995.
    Anthony J. Como,
    Director, Office of Coal and Electricity, Office of Fuels Programs, 
    Office of Fossil Energy.
    [FR Doc. 95-22217 Filed 9-7-95; 8:45 am]
    BILLING CODE 6450-01-P
    
    

Document Information

Published:
09/08/1995
Department:
Energy Department
Entry Type:
Notice
Action:
Notice of application.
Document Number:
95-22217
Dates:
Comments, protests or requests to intervene must be submitted on or before October 10, 1995.
Pages:
46829-46830 (2 pages)
Docket Numbers:
FE Docket No. PP-107
PDF File:
95-22217.pdf