DEPARTMENT OF ENERGY
[FE Docket No. PP-107]
Application for Presidential Permit, Arizona Public Service
Company
AGENCY: Office of Fossil Energy, DOE.
ACTION: Notice of application.
-----------------------------------------------------------------------
SUMMARY: Arizona Public Service Company (APS) has applied for a
Presidential Permit in order to construct a new transmission facility
at the U.S. border with Mexico.
DATES: Comments, protests or requests to intervene must be submitted on
or before October 10, 1995.
ADDRESSES: Comments, protests or requests to intervene should be
addressed as follows: Office of Coal & Electricity (FE-52), Office of
Fuels Programs, Office of Fossil Energy, Department of Energy, 1000
Independence Avenue, SW, Washington, DC 20585.
FOR FURTHER INFORMATION CONTACT: Warren E. Williams (Program Office)
202-586-9629 or Mike Skinker (Program Attorney) 202-586-6667.
SUPPLEMENTARY INFORMATION: The construction, connection, operation, and
maintenance of facilities at the international border of the United
States for the transmission of electrical energy is prohibited in the
absence of a Presidential permit pursuant to Executive Order No. 12038.
Exports of electricity from the United States to a foreign country are
also regulated and require authorization under section 202(e) of the
Federal Power Act.
On June 22, 1995, APS filed an application with the Office of
Fossil Energy (FE) of the Department of Energy (DOE) for a Presidential
permit. This application has been docketed as PP-107. In its
application, APS proposes to tap an existing 34.5-kilovolt (kV) line
that originates at the existing Fairview Substation in Douglas,
Arizona, and to extend the tap approximately 4,000 feet to the
international border adjacent to Agua Prieta, Sonora, Mexico. The
Fairview substation will be upgraded by adding a transformer and other
equipment in order to accommodate the proposed facilities. The proposed
power line structures are to be located within a state highway right-
of-way.
[[Page 46830]]
Procedural Matters
Any person desiring to be heard or to protest this application
should file a petition to intervene or protest at the address provided
above in accordance with 385.211 or 385.214 of the Rules of Practice
and Procedure (18 CFR 385.211, 385.214).
Any such petitions and protests should be filed with the DOE on or
before the date listed above. Additional copies of such petitions to
intervene or protest also should be filed directly with: Dennis Beals,
Manager, Bulk Power Trading & Customer Services, Arizona Public Service
Company, P.O. Box 53999, Station 9860, Phoenix, AZ 85072-3999 and Bruce
A. Gardner, Esq., Senior Attorney, Arizona Public Service Company, P.O.
Box 53999, Station 9820, Phoenix, AZ 85072-3999.
Pursuant to 18 CFR 385.211, protests and comments will be
considered by the DOE in determining the appropriate action to be
taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a petition
to intervene under 18 CFR 385.214. Section 385.214 requires that a
petition to intervene must state, to the extent known, the position
taken by the petitioner and the petitioner's interest in sufficient
factual detail to demonstrate either that the petitioner has a right to
participate because it is a State Commission; that it has or represents
an interest which may be directly affected by the outcome of the
proceeding, including any interest as a consumer, customer, competitor,
or security holder of a party to the proceeding; or that the
petitioner's participation is in the public interest.
A final decision will be made on the application for Presidential
permit contained in docket PP-107 after a determination is made by the
DOE that the proposed action is in the public interest and will not
adversely impact on the reliability of the U.S. electric power supply
system.
Before a Presidential permit or electricity export authorization
may be issued or amended, the environmental impacts of the proposed DOE
action must be evaluated pursuant to the National Environmental Policy
Act of 1969 (NEPA).
Copies of this application will be made available, upon request,
for public inspection and copying at the address provided above.
Issued in Washington, DC on August 31, 1995.
Anthony J. Como,
Director, Office of Coal and Electricity, Office of Fuels Programs,
Office of Fossil Energy.
[FR Doc. 95-22217 Filed 9-7-95; 8:45 am]
BILLING CODE 6450-01-P