97-23667. Williston Basin Interstate Pipeline Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 62, Number 173 (Monday, September 8, 1997)]
    [Notices]
    [Pages 47200-47201]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-23667]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP97-711-000]
    
    
    Williston Basin Interstate Pipeline Company; Notice of Request 
    Under Blanket Authorization
    
    September 2, 1997.
        Take notice that on August 25, 1997, Williston Basin Interstate 
    Pipeline Company (Williston Basin), 200 North Third Street, Suite 300, 
    Bismark, North Dakota 58501, filed a request with the Commission in 
    Docket No. CP97-711-000, pursuant to Sections 157.205, 157.211 and 
    157.216(b) of the Commission's Regulations under the Natural Gas Act 
    (NGA) for authorization to upgrade an existing delivery meter and 
    associated appurtenant facilities by abandoning certain existing 
    facilities and constructing and operating upgraded facilities to 
    effectuate increased natural gas transportation deliveries to 
    Interenergy Corporation (Interenergy) authorized in blanket certificate 
    issued in Docket Nos. CP82-487-000, et al., all as more fully set forth 
    in the request on file with the Commission and open to public 
    inspection.
        Williston states that Interagency has requested the upgrade of the 
    existing Hiland Plant delivery meter and associated appurtenant 
    facilities in Washakie County, Wyoming, to allow Williston Basin to 
    accommodate increased deliveries of natural gas to be used as an 
    emergency source of fuel for its gas compressors. The existing metering 
    and appurtenant facilities are currently too small to accommodate the 
    increased delivery requested by Interenergy. Therefore, Williston Basin 
    proposes to replace the existing delivery
    
    [[Page 47201]]
    
    meter and associated appurtenant facilities with a larger meter and 
    associated appurtenant facilities to accommodate the increase in 
    delivery requested by Interenergy. The total cost of the abandonment 
    and upgrade proposed herein is approximately $8,000. The total cost 
    would be reimbursed by Interenergy.
        Any person or the Commission's staff may, within 45 days after the 
    Commission has issued this notice, file pursuant to Rule 214 of the 
    Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or 
    notice of intervention and pursuant to Section 157.205 of the 
    Regulations under the NGA (18 CFR 157.205) a protest to the request. If 
    no protest is filed within the allowed time, the proposed activity 
    shall be deemed to be authorized effective the day after the time 
    allowed for filing a protest. If a protest is filed and not withdrawn 
    within 30 days after the time allowed for filing a protest, the instant 
    request shall be treated as an application for authorization pursuant 
    to Section 7 of the NGA.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-23667 Filed 9-5-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
09/08/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-23667
Pages:
47200-47201 (2 pages)
Docket Numbers:
Docket No. CP97-711-000
PDF File:
97-23667.pdf