Start Preamble
AGENCY:
Nuclear Regulatory Commission.
ACTION:
Petition for rulemaking; notice of receipt.
SUMMARY:
The Nuclear Regulatory Commission (NRC) has received and requests public comment on a petition for rulemaking filed by the Nuclear Energy Institute. The petition has been docketed by the NRC and has been assigned Docket No. PRM-52-1. The petitioner is requesting that the NRC Start Printed Page 48833regulations governing early site permits and combined license applications at existing reactor sites be amended to improve the efficiency of the application and review process for companies seeking early site permits or combined licenses at licensed facilities. The petitioner believes that its proposed amendments would enhance the focus and efficiency of the early site permit and combined license process. The petitioner proposes to eliminate the need for what it believes is duplicate applicant production and NRC review of existing information relating to a licensed facility that has been previously approved by the NRC and subject to a public hearing.
DATES:
Submit comments by November 8, 2001. Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given except as to comments received on or before this date.
ADDRESSES:
Submit comments to: Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555. Attention: Rulemakings and Adjudications staff.
Deliver comments to 11555 Rockville Pike, Rockville, Maryland, between 7:30 am and 4:15 pm on Federal workdays.
You may also provide comments via the NRC's interactive rulemaking website through the NRC home page (http://ruleforum.llnl.gov). At this site, you may view the petition for rulemaking, this Federal Register notice of receipt, and any comments received by the NRC in response to this notice of receipt. Additionally, you may upload comments as files (any format), if your web browser supports that function. For information about the interactive rulemaking website, contact Ms. Carol Gallagher, (301) 415-5905 (e-mail: CAG@nrc.gov).
For a copy of the petition, write to Michael T. Lesar, Chief, Rules and Directives Branch, Division of Administrative Services, Office of Administration, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Documents related to this action are available for public inspection at the NRC Public Document Room (PDR) located at 11555 Rockville Pike, Rockville, Maryland.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Michael T. Lesar, Office of Administration, U.S. Nuclear Regulatory Commission, Washington, DC 20555. Telephone: 301-415-7163 or Toll-Free: 1-800-368-5642 or e-mail: MTL@NRC.Gov.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Background
The Nuclear Regulatory Commission received a petition for rulemaking dated July 18, 2001, submitted by the Nuclear Energy Institute (petitioner). The petitioner is requesting that the regulations in 10 CFR part 52 governing early site permits and combined license applications at existing reactor sites be amended. Specifically, the petitioner requests that the NRC amend 10 CFR part 52, subpart A, Early Site Permits, to add proposed § 52.16 and amend 10 CFR part 52, subpart C, Combined Licenses, to add proposed § 52.80.
The NRC has determined that the petition meets the threshold sufficiency requirements for a petition for rulemaking under 10 CFR 2.802. The petition has been docketed as PRM-52-1. The NRC is soliciting public comment on the petition for rulemaking.
Discussion of the Petition
The petitioner expects that new power reactors will be ordered by existing licensees in the near future and that the new reactors will use many of the programs currently being used by those licensees. Additionally, the petitioner anticipates that many of the new reactors will be located on existing reactor sites. The petitioner believes that, to avoid needless expenditure of NRC and licensee resources, proposed §§ 52.16 and 52.80 would use existing information as a baseline and would provide for NRC review and an opportunity for a hearing to account for changed circumstances, such as new regulations and significant new information.
The petitioner notes that subpart A to part 52 contains provisions governing issuance of early site permits (ESPs). The petitioner proposes that a new § 52.16 be added to subpart A to allow an ESP applicant to incorporate by reference all or portions of the current licensing basis for an existing reactor site to the extent that they are valid and applicable to one or more additional nuclear power plants that fit within the ESP environmental envelope. Proposed § 52.16 would also require that any information incorporated by reference be augmented to include:
- Significant new safety or environmental information that materially affects the ability of the site to support the proposed additional nuclear facility
- Information regarding the cumulative radiological and environmental impacts of the existing facility and the facility as described in the ESP application
- An analysis of the potential safety impacts of the existing facility on the suitability of the site for the facility as described in the ESP application
- An analysis of the potential safety impacts on the existing facility from the facility as described in the ESP application
- Information that addresses regulations applicable to siting issues that became effective after licensing of the current facility, to the extent that these regulations are not addressed in the current licensing basis
The petitioner states that under proposed § 52.16, the NRC would treat as resolved those matters incorporated by reference, except to the extent that those matters are subject to augmentation with new information described above. The petitioner also states that proposed § 52.16 would allow the NRC to impose a change in the application with respect to the information incorporated by reference to the extent that the change satisfies the principles underlying 10 CFR 50.109, Backfitting. The petitioner believes that in preparing the environmental impact statement for the early site permit, the NRC would adopt the applicable portions of the existing environmental impact statement associated with the site, modified or supplemented as necessary to reflect the NRC's review of the new environmental information described above.
The petitioner notes that subpart C to part 52 contains provisions governing issuance of combined construction permits and operating licenses (COLs). The petitioner states that proposed § 52.80 would be added to subpart C and would contain provisions similar to those proposed in § 52.16. The petitioner also states that proposed § 52.80 would allow a COL applicant to incorporate by reference programmatic information identified in the current licensing basis of an existing licensed facility located at the same site or owned or operated by the same licensee. Proposed § 52.80 would require this programmatic information to be augmented to include information that addresses applicable regulations that became effective after the existing facility was licensed, to the extent that these regulations are not addressed by the current licensing basis for the existing facility. The petitioner states that under proposed § 52.80, the NRC would treat as resolved those matters incorporated by reference from the existing facility, except to the extent that those matters are subject to new information as identified above. The petitioner believes that the NRC could direct that a change be made in the COL application with respect to the information incorporated by reference, Start Printed Page 48834to the extent that the change satisfies the principles underlying 10 CFR 50.109.
The petitioner proposes that 10 CFR part 52 be amended to add §§ 52.16 and 52.80 as follows:
Section 52.16 Early site permits for licensed sites.
(a) If an application for an early site permit is filed for a site for which a license or construction permit has been issued, the application may incorporate by reference all or part of the current licensing basis for the site to the extent that it pertains to the siting issues specified in § 52.17.
(b) Information incorporated by reference shall be supplemented to include, to the extent applicable:
(1) Significant new information that materially affects the ability of the site to support the additional nuclear facility as described in the early site permit application;
(2) Information regarding the cumulative radiological impacts of the existing facility and the facility as described in the early site permit application;
(3) An analysis of the potential safety impacts of the existing facility on the suitability of the site for the facility as described in the early site permit application;
(4) An analysis of the potential safety impacts on the existing facility from the facility as described in the early site permit application; and
(5) Information that addresses regulations applicable to siting issues that became effective after licensing of the existing facility, to the extent that such regulations are not addressed by the current licensing basis.
(c) Environmental information incorporated by reference shall be supplemented to include, to the extent applicable:
(1) Significant new information relevant to environmental concerns bearing on the ability of the site to support the additional nuclear facility as described in the early site permit application; and
(2) Information regarding the cumulative environmental impacts of the existing facility and the facility as described in the early site permit application.
(d) The Commission shall treat as resolved the environmental information incorporated by reference under paragraph (a) of this section, except to the extent that those matters are subject to new information under paragraph (b) of this section. In addition, the Commission may impose changes with respect to the information incorporated by reference pursuant to paragraph (a) of this section to the extent that each such change satisfies the criteria in 10 CFR 50.109.
(e) The Commission also shall treat as resolved the environmental information incorporated by reference under paragraph (a) of this section, except to the extent that those matters are subject to new information under paragraph (c) of this section. In preparing its environmental impact statement for the early site permit, the Commission will adopt the applicable portions of the existing environmental impact statement associated with the site (including any supplements), modified or supplemented as necessary to reflect the Commission's review of the new information identified under paragraph (c) of this section.
* * * * *Section 52.80 Combined licenses for sites with existing licensed facilities or for applicants holding licenses for other facilities.
(a) If an application is filed for a combined license for a facility located at a site with an existing licensed facility or by an applicant that holds a license for an existing facility at another site, the application may incorporate by reference the type of information described in § 52.16, subject to the requirements of that section.
(b) The application may also incorporate by reference all or part of the type of information identified in 10 CFR 50.33(g); 50.34(b)(6)(i), (ii), (iv), and (v); 50.34(c); 50.34(d); 50.34(f)(2)(ii); and 50.34(f)(3)(i), (ii), and (vii), to the extent such information is contained in the current licensing basis of an existing facility located at the same site or at a site owned or operated by the same licensee or an affiliate of that licensee. The information incorporated by reference shall be supplemented to include:
(1) Information that addresses regulations applicable to the incorporated information that became effective after licensing of the existing facility, to the extent that such regulations are not addressed by the current licensing basis for the existing facility.
(c) The Commission shall treat as resolved those matters incorporated by reference under paragraph (a) of this section, except to the extent that those matters are subject to new information under paragraph (b) of this section. In addition, the commission may direct that changes be made with respect to the information incorporated by reference pursuant to paragraph (a) of this section to the extent that each such change satisfies the criteria in 10 CFR 50.109.
The petitioner believes that proposed §§ 52.16 and 52.80 are consistent with and promote the NRC's performance goals to: Maintain safety; protection of the environment, and the common defense and security; increase public confidence; make NRC activities and decisions more effective, efficient, and realistic; and reduce unnecessary burden on stakeholders. The petitioner states that the proposed amendments not only are consistent with NRC's mission to ensure adequate protection of the public health and safety, the common defense and security, and the environment; but also, would focus NRC reviews on new information and what the petitioner believes would be an incremental impact of an additional unit at an existing site. The petitioner states that even in the absence of new information, the proposed regulations would provide the NRC with the authority to impose new requirements on previously approved information if required to ensure adequate protection of the public health and safety and the environment.
The petitioner states that the proposed amendments would serve to enhance the efficiency of the regulatory process by eliminating duplicate reviews of matters resolved in previous proceedings by focusing agency resources on new and material information and the impact of potential new units on the site. The petitioner also states that proposed §§ 52.16 and 52.80 would ensure that the public has an opportunity for a hearing on all material issues, including significant new information that would warrant further NRC review. The petitioner believes that proposed §§ 52.16 and 52.80 would reduce regulatory burden by focusing attention on matters that have not been previously decided in other proceedings.
The petitioner notes that 10 CFR 51.29(a)(3) provides that the NRC may exclude issues that have been subject to a previous environmental review. The petitioner believes that its proposed amendments support NRC initiatives to place emphasis on the early identification of regulatory issues and process improvements to handle new license applications. The petitioner states that because the costs of a new facility are affected by application preparation expenses, responding to requests for additional information (RAIs), and possible hearing expenses, ensuring that costs are predictable and commensurate with the safety significance of issues associated with ESP and COL applications and reducing the time for a new facility to be available will be determining factors in business decisions on whether to proceed with new nuclear projects.
The petitioner acknowledges that the NRC has the authority and discretion to adopt new regulations under the Atomic Energy Act of 1954, as amended (AEA), and the Administrative Procedure Act (APA) by either rulemaking or adjudication. The petitioner cites Vermont Yankee Nuclear Power Corp. v. Natural Resources Defense Council, Inc., 435 U.S. 519 (1978) in which the Supreme Court held that the NRC is free to promulgate rules of procedure and methods for making factual findings if they satisfy APA requirements. The petitioner believes that nothing in the AEA or APA would preclude adoption of proposed §§ 52.16 and 52.80 or prohibit the NRC from promulgating a rule that would treat information the NRC reviewed and approved in a previous licensing proceeding as resolved. The petitioner emphasizes that proposed §§ 52.16 and 52.80 would require NRC consideration of new Start Printed Page 48835information that has not been previously reviewed or subject to a hearing.
The petitioner notes that §§ 52.39(a)(2), 52.63(a)(4), and 52.103 treat information the NRC has reviewed and approved in previous proceedings as resolved and that the courts have held that these provisions do not deprive individuals of rights to a hearing under § 189 of the AEA. The petitioner also notes that § 52.73 allows a COL application to reference a design certification and that in the COL proceeding, § 52.63(a)(4) requires the NRC to treat matters relating to issuance of the design certification as resolved, even if the design certification proceeding was a different proceeding that may have taken place 15 or more years earlier and probably did not involve the parties in the COL hearing. (See also, §§ 52.55 and 52.61.)
The petitioner indicates that § 52.73 also allows a COL application to reference an ESP and that § 52.39(a)(2) requires the NRC to treat matters resolved in the ESP proceeding as final, even though the ESP decision was a different matter that may have taken place at least 20 years earlier and may not have involved the same COL hearing parties. (See also, §§ 52.27 and 52.33.) In Nuclear Information & Resource Service v. NRC, 918 F.2d 189, 196-97 n. 14 (D.C. Cir. 1990), aff'd on rehearing 969 F.2d 1169, 1172 (D.C. Cir. 1992), the petitioner notes that the court rejected a challenge to the NRC's decision to treat matters approved in the ESP and design certification proceedings as resolved in a COL hearing in stating “that the Commission has wide latitude in structuring the scope and timing of its hearings.” The petitioner notes further that this decision found that § 189 of the AEA does not contain specific instruction on how the hearing is to be conducted or if the NRC must rehear issues already settled earlier in the licensing process. The petitioner believes that the scope and timing of ESP and COL hearings contemplated in proposed §§ 52.16 and 52.80 are fully consistent with existing provisions and court decisions.
The petitioner also believes that limitations on the scope of issues contained in proposed §§ 52.16 and 52.80 are consistent with NRC practice in other areas such as, license renewal and amendments, environmental effects associated with the nuclear fuel cycle, spent fuel storage casks, quality assurance (QA) programs, and the facility and procedure change process. The petitioner notes that the scope of issues appropriate for review in operating license renewal proceedings is limited under 10 CFR parts 51 and 54 that eliminate matters previously considered in prior licensing proceedings or rulemaking actions. The petitioner cites Vermont Yankee Nuclear Power Corp. (Vermont Yankee nuclear Power Station), ALAB-235, 8 AEC 873, 875 (1974) and Georgia Power Co. (Vogtle Nuclear Plant, Units 1 and 2) ALAB-291, 2 NRC 404, 415 (1975) in stating that the right to intervene and raise contentions in license amendment proceedings is limited to issues that directly relate to the proposed change and that it is inappropriate to revisit issues considered in initial licensing that are not affected by the amendment.
The petitioner also cites Baltimore Gas and Electric Corp. v. NRDC, 462 U.S. 87 (1983) in which the Supreme Court upheld the NRC's approach in the Table S-3 rulemaking proceeding in stating that the generic disposition of environmental issues is proper and precludes unnecessary and repetitive litigation. The petitioner notes that 10 CFR 72.46(e) prohibits review of spent fuel storage cask design issues during licensing hearings for a site-specific independent fuel storage installation (ISFSI) and when a cask was approved in a generic proceeding. The petitioner also notes that 10 CFR 72.210 and 72.212 allow use of generically approved storage casks without providing any opportunity for a plant-specific hearing. The petitioner cites Kelly v. Selin, 42 F.3d 1501 (6th Cir. 1995), cert. denied 515 U.S. 1159 (1995) in which the courts have held that this process does not deprive individuals of any hearing rights under § 189 of the AEA.
The petitioner states that 10 CFR 50.54(a) has been recently revised to eliminate the need for prior NRC review and changes to a QA program description when the change involves a QA alternative or exception previously approved in an NRC safety evaluation for another plant. The petitioner also states that 10 CFR 50.59(a)(2)(ii) and NRC Regulatory Guide 1.187 permit licensees to adopt evaluation methods approved by the NRC for use by other licensees if the method has been approved for the intended application and the licensee satisfies the applicable terms and conditions for its use. The petitioner believes that proposed §§ 52.16 and 52.80 are fully consistent with precedents in which the NRC has treated prior decisions made in rulemaking or licensing proceedings as resolved and has not permitted further review and litigation of those issues in subsequent proceedings.
The petitioner notes that § 102 of the National Environmental Policy Act of 1969 (NEPA) requires an environmental impact statement (EIS) for major Federal actions that significantly affect the quality of the environment and that 10 CFR 52.18 and 52.89 require an EIS for an ESP and a COL. However, NEPA does not require the NRC to reconsider previously settled issues to assess the environmental impacts of approving a license application to locate an additional reactor at an existing site. The petitioner cites the Council on Environmental Quality (CEQ) regulations that became effective in 1979 to standardize the NEPA process to reduce delays and eliminate duplication of governmental efforts. These regulations allow agencies to use previous environmental analyses when drafting a new EIS or to supplement an EIS if an agency makes substantive changes in a proposed action or when new circumstances or information arise that affect the environment. The petitioner acknowledges that the NRC incorporated these regulations into 10 CFR Part 51 but cites Deukmejian v. NRC, 751 F.2d 1287 (D.C. Cir. 1984) in noting that although the NRC gives substantial deference to the CEQ's regulations, it is not bound by them.
The petitioner states that 10 CFR 51.29(a)(3) permits the NRC to exclude issues that have been covered by a previous environmental review and that an EIS may provide a reference to a prior document that settled a particular environmental issue. The petitioner believes that although the NRC's regulations specifically refer to adoption of an EIS prepared by another Federal agency, nothing prevents the NRC from using a previous NRC EIS. The petitioner also believes that proposed §§ 52.16 and 52.80 are consistent with NRC and CEQ guidance on referencing and adopting previous EISs.
The Petitioner's Conclusions
The petitioner has concluded that the NRC requirements governing early site permits and the combined license process in 10 CFR Part 52 should be amended to permit the NRC to treat applicable information approved in previous licensing proceedings as resolved. The petitioner also has concluded that proposed §§ 52.16 and 52.80 would accomplish this objective and ensure consideration of significant new information that could materially affect the NRC's findings. The petitioner has also concluded that the proposed amendments are consistent with § 189 of the AEA and NRC and court decisions that authorize the NRC to limit the scope of licensing proceedings to avoid additional review and litigation of previously settled issues. Lastly, the Start Printed Page 48836petitioner has concluded that the proposed amendments would conserve NRC resources and streamline the agency's administrative processes to eliminate what it believes are unnecessary costs and burdens on applicants for new licenses.
Start SignatureDated at Rockville, Maryland, this 18th day of September, 2001.
For the Nuclear Regulatory Commission.
Annette Vietti-Cook,
Secretary of the Commission.
[FR Doc. 01-23790 Filed 9-21-01; 8:45 am]
BILLING CODE 7590-01-P
Document Information
- Published:
- 09/24/2001
- Department:
- Nuclear Regulatory Commission
- Entry Type:
- Proposed Rule
- Action:
- Petition for rulemaking; notice of receipt.
- Document Number:
- 01-23790
- Dates:
- Submit comments by November 8, 2001. Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given except as to comments received on or before this date.
- Pages:
- 48832-48836 (5 pages)
- Docket Numbers:
- Docket No. PRM-52-1
- PDF File:
- 01-23790.pdf
- CFR: (1)
- 10 CFR 52