-
Start Preamble
October 2, 2001.
AGENCY:
Federal Energy Regulatory Commission.
ACTION:
Notice of proposed information collection and request for comments.
SUMMARY:
In compliance with the requirements of Section 3506(c)(2)(a) of the Paperwork Reduction Act of 1995 (Pub. L. No. 104-13), the Federal Energy Regulatory Commission (Commission) is soliciting public comment on the specific aspects of the information collection described below.
DATES:
Consideration will be given to comments submitted on or before December 10, 2001.
ADDRESSES:
Copies of the proposed collection of information can be obtained from and written comments may be submitted to the Federal Energy Regulatory Commission, Attn: Michael Miller, Office of the Chief Information Officer, CI-1, 888 First Street NE., Washington, DC 20426.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Michael Miller may be reached by telephone at (202) 208-1415, by fax at (202) 208-2425, and by e-mail at mike.miller@ferc.fed.us.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
The information collected under the requirements of FERC-521 “Payments for Benefits from Headwater Benefits” (OMB No. 1902-0087) is used by the Commission to implement the statutory provisions of Section 10(f) of the Federal Power Act (FPA)(16 U.S.C. 803). The FPA authorizes the Commission to determine headwater benefits received by downstream hydropower project owners. Headwater benefits are the additional energy production possible at a downstream hydropower project resulting from the regulation of river flows by an upstream storage reservoir.
When the Commission completes a study of a river basin, it determines headwater benefits charges that will be apportioned among the various downstream beneficiaries. A headwaters benefits charge, and the cost incurred by the Commission to complete an evaluation are paid by downstream hydropower project owners. In essence, the owners of non-federal hydropower projects that directly benefit from a headwater(s) improvement must pay an equitable portion of the annual charges for interest, maintenance, and depreciation of the headwater project to the U.S. Treasury. The regulations provide for apportionment of these costs between the headwater project and downstream projects based on downstream energy gains and propose equitable apportionment methodology that can be applied to all river basins in which headwater improvements are built. The data the Commission requires owners of non-federal hydropower projects to file for determining annual charges is specified in 18 Code of Federal Regulations (CFR) Part 11.
Action: The Commission is requesting a three-year extension of the current expiration date, with no changes to the existing collection of data.
Burden Statement: Public reporting burden for this collection is estimated as: Start Printed Page 51417
Number of respondents annually Number of responses per respondent Average burden hours per response Total annual burden hours (1) (2) (3) (1)×(2)×(3) 5 1 40 200 The estimated total cost to respondents is $33,716 (200 hours divided by 2,080 hours per year per employee times $117,041 per year per average employee = $11,254). The cost per respondent is $2,250.
The reporting burden includes the total time, effort, or financial resources expended to generate, maintain, retain, disclose, or provide the information including: (1) Reviewing instructions; (2) developing, acquiring, installing, and utilizing technology and systems for the purposes of collecting, validating, verifying, processing, maintaining, disclosing and providing information; (3) adjusting the existing ways to comply with any previously applicable instructions and requirements; (4) training personnel to respond to a collection of information; (5) searching data sources; (6) completing and reviewing the collection of information; and (7) transmitting, or otherwise disclosing the information.
The estimate of cost for respondents is based upon salaries for professional and clerical support, as well as direct and indirect overhead costs. Direct costs include all costs directly attributable to providing this information, such as administrative costs and the cost for information technology. Indirect or overhead costs are costs incurred by an organization in support of its mission. These costs apply to activities which benefit the whole organization rather than any one particular function or activity.
Comments are invited on: (1) Whether the proposed collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information to be collected; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of appropriate automated, electronic, mechanical, or other technological collection techniques or other forms of information technology e.g. permitting electronic submission of responses.
Start SignatureDavid P. Boergers,
Secretary.
[FR Doc. 01-25202 Filed 10-5-01; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 10/09/2001
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Action:
- Notice of proposed information collection and request for comments.
- Document Number:
- 01-25202
- Dates:
- Consideration will be given to comments submitted on or before December 10, 2001.
- Pages:
- 51416-51417 (2 pages)
- Docket Numbers:
- Docket No. IC01-521-000, FERC-521
- EOCitation:
- of 2001-10-02
- PDF File:
- 01-25202.pdf