-
Start Preamble
AGENCY:
Nuclear Regulatory Commission (NRC).
ACTION:
Notice of pending NRC action to submit an information collection request to OMB and solicitation of public comment.
SUMMARY:
The NRC is preparing a submittal to OMB for review of continued approval of information collections under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35).
Information pertaining to the requirement to be submitted:
1. The title of the information collection: Part 61—Licensing Requirements for Land Disposal of Radioactive Waste.
2. Current OMB approval number: 3150-0135.
3. How often the collection is required: Applications for licenses are submitted as needed. Other reports are submitted annually and as other events require.
4. Who is required or asked to report: Applicants for and holders of an NRC license for land disposal of low-level radioactive waste, and all generators, collectors, and processors of low-level waste intended for disposal at a low-level waste facility.
5. The number of annual respondents: 3.
6. The number of hours needed annually to complete the requirement or request: 4,059 hours (42 hours for reporting plus 4,017 hours for recordkeeping) or approximately 4.7 hours per response.
7. Abstract: Part 61 establishes the procedures, criteria, and license terms and conditions for the land disposal of low-level radioactive waste. Reporting and recordkeeping requirements are mandatory or, in the case of application submittals, are required to obtain a benefit. The information collected in the applications, reports, and records is evaluated by the NRC to ensure that the licensee's or applicant's physical plant, equipment, organization, training, experience, procedures, and plans provide an adequate level of protection of public health and safety, common defense and security, and the environment.
Submit, by January 8, 2002, comments that address the following questions:
1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility?
2. Is the burden estimate accurate?
3. Is there a way to enhance the quality, utility, and clarity of the information to be collected?
4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology?
A copy of the draft supporting statement may be viewed free of charge at the NRC Public Document Room located at One White Flint North, 11555 Rockville Pike, Rockville, MD. OMB clearance requests are available at the NRC worldwide web site (http://www.nrc.gov/NRC/PUBLIC/OMB/index.html). The document will be available on the NRC home page site for 60 days after the signature date of this notice.
Comments and questions about the information collection requirements may be directed to the NRC Clearance Officer, Brenda Jo. Shelton, U.S. Nuclear Regulatory Commission, T-6 E 6, Washington, DC 20555-0001, by telephone at (301) 415-7233, or by Internet electronic mail at BJS1@NRC.GOV.
Start SignatureDated at Rockville, Maryland, this 2nd day of November, 2001.
For the Nuclear Regulatory Commission.
Brenda Jo. Shelton,
NRC Clearance Officer, Office of the Chief Information Officer.
[FR Doc. 01-28184 Filed 11-8-01; 8:45 am]
BILLING CODE 7590-01-P
Document Information
- Published:
- 11/09/2001
- Department:
- Nuclear Regulatory Commission
- Entry Type:
- Notice
- Action:
- Notice of pending NRC action to submit an information collection request to OMB and solicitation of public comment.
- Document Number:
- 01-28184
- Pages:
- 56718-56718 (1 pages)
- PDF File:
- 01-28184.pdf