01-31855. Fee Adjustments for Testing, Evaluation, and Approval of Mining Products  

  • Start Preamble

    AGENCY:

    Mine Safety and Health Administration (MSHA), Labor.

    ACTION:

    Notice of fee adjustments.

    SUMMARY:

    This notice revises the user fees for MSHA's Approval and Certification Center (A&CC). Fees compensate MSHA for the costs incurred for testing, evaluating, and approving certain products for use in underground mines. The 2002 fees are based on MSHA's actual expenses for fiscal year 2001. The fees reflect changes both in MSHA's approval processing operations and in the costs to process approval actions.

    DATES:

    This fee schedule is effective from January 1, 2002 through December 31, 2002.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Steven J. Luzik, Chief, Approval and Certification Center (A&CC), 304-547-2029 or 304-547-0400.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Background

    On May 8, 1987 (52 FR 17506), MSHA published a final rule, 30 CFR Part 5—Fees for Testing, Evaluation, and Approval of Mining Products. The rule established specific procedures for calculating, administering, and revising user fees. MSHA has revised its fee schedule for 2001 in accordance with the procedures of that rule. This new fee schedule is included below. For approval applications postmarked before January 1, 2002, MSHA will continue to calculate fees under the previous (2001) fee schedule, published on December 28, 2000.

    Fee Computation

    In general, MSHA computed the 2002 fees based on fiscal year 2001 data. We calculated a weighted-average, direct cost for all the services provided during fiscal year 2001 in the processing of requests for testing, evaluation, and approval of certain products for use in underground mines. From this cost, we calculated a single hourly rate to apply uniformly across all of the product approval categories during 2002.

    Start Signature

    Signed in Arlington, Virginia, this 19th day of December, 2001.

    Dave D. Lauriski,

    Assistant Secretary of Labor for Mine Safety and Health.

    End Signature

    Fee Schedule Effective January 1, 2002

    [Based on FY 2001 data]

    Action titleHourly rate
    Fees for Testing, Evaluation, and Approval of all Mining Products 1$57
    Retesting for Approval as a Result of Post-Approval Product Audit 2
    30 CFR PART 15—EXPLOSIVES TESTING
    Permissibility Tests for Explosives:
    Weigh-in462
    Physical Exam: First size325
    Chemical Analysis1,977
    Air Gap—Minimum Product Firing Temperature460
    Air Gap—Room Temperature352
    Pendulum Friction Test163
    Detonation Rate352
    Gallery Test 77,436
    Gallery Test 85,533
    Toxic Gases (Large Chamber)805
    Permissibility Tests for Sheathed Explosives:
    Physical Examination128
    Chemical Analysis1,044
    Gallery Test 91,944
    Gallery Test 101,944
    Gallery Test 111,944
    Gallery Test 121,944
    Drop Test648
    Temperature Effects/Detonation672
    Toxic Gases580
    1 Full approval fee consists of evaluation cost plus applicable test costs.
    2 Fee based upon the approval schedule in effect at the time of retest.

    Note:

    When the nature of the product requires that we test and evaluate it at a location other than our premises, you must reimburse us for the traveling, subsistence, and incidental expenses of our representative in accordance with standardized government travel regulations. This reimbursement is in addition to the fees charged for evaluation and testing.

    End Supplemental Information

    [FR Doc. 01-31855 Filed 12-27-01; 8:45 am]

    BILLING CODE 4510-43-P

Document Information

Effective Date:
1/1/2002
Published:
12/28/2001
Department:
Mine Safety and Health Administration
Entry Type:
Notice
Action:
Notice of fee adjustments.
Document Number:
01-31855
Dates:
This fee schedule is effective from January 1, 2002 through December 31, 2002.
Pages:
67321-67321 (1 pages)
PDF File:
01-31855.pdf