02-22266. Towing Safety Advisory Committee  

  • Start Preamble

    AGENCY:

    Coast Guard, DOT.

    ACTION:

    Notice of meetings.

    SUMMARY:

    The Towing Safety Advisory Committee (TSAC) and its working groups will meet as required to discuss various issues relating to shallow-draft inland and coastal waterway navigation and towing safety. All meetings will be open to the public.

    DATES:

    TSAC will meet on Friday, September 13, 2002, from 8 a.m. to 3 p.m. The working groups will meet on Thursday, September 12, 2002, from 9 to 3:30 p.m. These meetings may close early if all business is finished. Written material and requests to make oral presentations should reach the Coast Guard on or before September 5, 2002. Requests to have a copy of your material distributed to each member of the Committee or working groups should reach the Coast Guard on or before September 5, 2002.

    ADDRESSES:

    On Friday, TSAC will meet in room 2415, U.S. Coast Guard Headquarters, 2100 Second Street SW., Washington, DC. On Thursday, the working groups will first meet briefly in the cafeteria at the same address and then move to separate spaces designated at that time. Send written material and requests to make oral presentations to Mr. Gerald P. Miante, Commandant (G-MSO-1), U.S. Coast Guard Headquarters, 2100 Second Street SW., Washington, DC 20593-0001. This notice and the draft task statement are available on the Internet at http://dms.dot.gov.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Mr. Gerald P. Miante, Assistant Executive Director, or LCDR Lance Lindsay, telephone 202-267-0214, fax 202-267-4570, or e-mail at: gmiante@comdt.uscg.mil.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Notice of these meetings is given under the Federal Advisory Committee Act, 5 U.S.C. App. 2.

    Agenda of Committee Meeting

    The agenda tentatively includes the following:

    (1) Status Report of the Crew Alertness Working Group;

    (2) Status Report of the Towing Vessel Regulatory Review Working Group;

    (3) Status Report Licensing Implementation Working Group;

    (4) Status Report of the Maritime Security Working Group;

    (5) Presentation on the Inland River Security Partnership;

    (6) Presentation on Towboat Compliance and Prevention of SOLAS Detentions;

    (7) Presentation on the Port Security Assessment Program; and

    (8) Consideration of draft Task Statement 02-02 “Adequacy of Navigation Lights for Inland River Barge Tows.”

    Procedural

    All meetings are open to the public. Please note that the meetings may close early if all business is finished. Members of the public may make oral presentations during the meetings. If you would like to make an oral presentation at a meeting, please notify the Assistant Executive Director no later than September 5, 2002. Written material for distribution at a meeting should reach the Coast Guard no later than September 5, 2002. If you would like a copy of your material distributed to each member of the committee or subcommittee in advance of a meeting, please submit 17 copies to the Assistant Executive Director no later than September 2, 2002.

    Information on Services for Individuals With Disabilities

    For information on facilities or services for individuals with disabilities or to request special assistance at the meetings, contact the Assistant Executive Director as soon as possible.

    Start Signature

    Dated: August 26, 2002.

    Howard L. Hime,

    Acting Director of Standards, Marine Safety, Security & Environmental Protection.

    End Signature End Supplemental Information

    [FR Doc. 02-22266 Filed 8-29-02; 8:45 am]

    BILLING CODE 4910-15-P

Document Information

Published:
08/30/2002
Department:
Coast Guard
Entry Type:
Notice
Action:
Notice of meetings.
Document Number:
02-22266
Dates:
TSAC will meet on Friday, September 13, 2002, from 8 a.m. to 3 p.m. The working groups will meet on Thursday, September 12, 2002, from 9 to 3:30 p.m. These meetings may close early if all business is finished. Written material and requests to make oral presentations should reach the Coast Guard on or before September 5, 2002. Requests to have a copy of your material distributed to each member of the Committee or working groups should reach the Coast Guard on or before September 5, 2002.
Pages:
55909-55909 (1 pages)
Docket Numbers:
USCG 2002-13233
PDF File:
02-22266.pdf