03-31798. Fee Adjustments for Testing, Evaluation, and Approval of Mining Products  

  • Start Preamble

    AGENCY:

    Mine Safety and Health Administration (MSHA), Labor.

    ACTION:

    Notice of fee adjustments.

    SUMMARY:

    This notice revises our [MSHA Approval and Certification Center (A&CC)] user fees. Fees compensate us for the costs that we incur for testing, evaluating, and approving certain products for use in underground mines. We based the 2004 fees on our actual expenses for fiscal year 2003. The fees reflect changes both in our approval processing operations and in our costs to process approval actions.

    DATES:

    This fee schedule is effective from January 1, 2004, through December 31, 2004.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Steven J. Luzik, Chief, Approval and Certification Center (A&CC), 304-547-2029 or 304-547-0400.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Background

    On May 8, 1987 (52 FR 17506), we published a final rule, 30 CFR Part 5—Fees for Testing, Evaluation, and Approval of Mining Products. The rule established specific procedures for calculating, administering, and revising user fees. We have revised our fee schedule for 2004 in accordance with the procedures of that rule and include this new fee schedule below. For approval applications postmarked before January 1, 2004, we will continue to calculate fees under the previous (2003) fee schedule, published on December 31, 2002.

    Fee Computation

    In general, we computed the 2004 fees based on fiscal year 2003 data. We calculated a weighted-average, direct Start Printed Page 75282cost for all the services that we provided during fiscal year 2003 in the processing of requests for testing, evaluation, and approval of certain products for use in underground mines. From this cost, we calculated a single hourly rate to apply uniformly across all of the product approval categories during 2004.

    Start Signature

    Dated: December 18, 2003.

    John R. Correll,

    Deputy Assistant Secretary of Labor for Mine Safety and Health.

    End Signature

    Fee Schedule Effective January 1, 2004

    [Based on FY 2003 data]

    Action titleHourly rate
    Fees for Testing, Evaluation, and Approval of all Mining Products 1$63
    Retesting for Approval as a Result of Post-Approval Product Audit 2
    30 CFR Part 15—Explosives Testing
    Permissibility Tests for Explosives:
    Weigh-in462
    Physical Exam: First size325
    Chemical Analysis1,977
    Air Gap—Minimum Product Firing Temperature460
    Air Gap—Room Temperature352
    Pendulum Friction Test163
    Detonation Rate352
    Gallery Test 77,436
    Gallery Test 85,533
    Toxic Gases (Large Chamber)805
    Permissibility Tests for Sheathed Explosives:
    Physical Examination128
    Chemical Analysis1,044
    Gallery Test 91,944
    Gallery Test 101,944
    Gallery Test 111,944
    Gallery Test 121,944
    Drop Test648
    Temperature Effects/Detonation672
    Toxic Gases580
    1 Full approval fee consists of evaluation cost plus applicable test costs.
    2 Fee based upon the approval schedule in effect at the time of retest.

    Note:

    When the nature of the product requires that we test and evaluate it at a location other than our premises, you must reimburse us for the traveling, subsistence, and incidental expenses of our representative in accordance with standardized government travel regulations. This reimbursement is in addition to the fees charged for evaluation and testing.

    End Supplemental Information

    [FR Doc. 03-31798 Filed 12-29-03; 8:45 am]

    BILLING CODE 4510-43-P

Document Information

Effective Date:
1/1/2004
Published:
12/30/2003
Department:
Mine Safety and Health Administration
Entry Type:
Notice
Action:
Notice of fee adjustments.
Document Number:
03-31798
Dates:
This fee schedule is effective from January 1, 2004, through December 31, 2004.
Pages:
75281-75282 (2 pages)
PDF File:
03-31798.pdf