04-19584. Correction of Electric Program Standard Contract Forms  

  • Start Preamble

    AGENCY:

    Rural Utilities Service, USDA.

    ACTION:

    Final rule.

    SUMMARY:

    The Rural Utilities Service (RUS), an agency delivering the United States Department of Agriculture's Rural Development Utilities Programs, is correcting its regulations relating to two RUS forms. RUS Form 211, Engineering Services Contract for the Design and Construction of a Generating Plant, and RUS Form 198, Equipment Contract, are being revised to correct two typographical errors and a numbering error, respectively.

    DATES:

    Effective Date: September 27, 2004.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Mr. Fred J. Gatchell, Deputy Director, Electric Staff Division, Rural Utilities Service, U.S. Department of Agriculture, Stop 1569, 1400 Independence Ave., SW., Washington, DC 20250-1569. Telephone: (202) 720-1398. FAX: (202) 720-7491. E-mail: fred.gatchell@usda.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    RUS has determined that pursuant to 5 U.S.C. 553, a notice of proposed rule making and opportunity for comment is impracticable, unnecessary, or contrary to the public interest and is exempt from the provisions of Executive Order Nos. 12866 and 12988. It has been Start Printed Page 52595determined that the Regulatory Flexibility Act is not applicable to this rule since the Rural Utilities Service is not required by 5 U.S.C. 551 et seq. or any other provision of law to publish a notice of proposed rulemaking with respect to the subject matter of this rule.

    Background

    On June 29, 1998, RUS revised 7 CFR 1724, Electric Engineering, Architectural Services and Design Policies and Procedures, which references RUS Form 211, Engineering Services Contract for the Design and Construction of a Generating Plant (63 FR 35312). A typographical error has been found in Article VI, Section 8 of this form. This rule updates the reference to the corrected form.

    On February 13, 2004, RUS revised 7 CFR 1726, Electric System Construction Policies and Procedures, which references RUS Form 198, Equipment Contract (69 FR 7105). A typographical error has been found in Article II, Section 1 of this form. Also, a numbering error has been found in Article VI of this form. This rule updates the reference to the corrected form.

    Start List of Subjects

    List of Subjects

    7 CFR Part 1724

    • Electric power
    • Loan programs—energy
    • Reporting and recordkeeping requirements
    • Rural areas

    7 CFR Part 1726

    • Electric power
    • Loan programs—energy
    • Reporting and recordkeeping requirements
    • Rural areas
    End List of Subjects Start Amendment Part

    For reasons set forth in the preamble, RUS amends 7 CFR parts 1724 and 1726 as follows:

    End Amendment Part Start Part

    PART 1724—ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES

    End Part Start Amendment Part

    1. The authority citation for part 1724 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 7 U.S.C. 901 et seq., 1921 et seq., 6941 et seq.

    End Authority

    Subpart F—RUS Contract Forms

    Start Amendment Part

    2. Amend § 1724.74 by revising paragraph (c)(1) to read as follows:

    End Amendment Part
    List of electric program standard contract forms.
    * * * * *

    (c) * * *

    (1) RUS Form 211, Rev. 4-04, Engineering Service Contract for the Design and Construction of a Generating Plant. This form is used for engineering services for generating plant construction.

    * * * * *
    Start Part

    PART 1726—ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES

    End Part Start Amendment Part

    3. The authority citation for part 1726 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 7 U.S.C. 901 et seq., 1921 et seq., 6941 et seq.

    End Authority

    Subpart I—RUS Standard Forms

    Start Amendment Part

    4. Amend § 1726.304 by revising paragraph (c)(4) to read as follows:

    End Amendment Part
    List of electric program standard contract forms.
    * * * * *

    (c) * * *

    (4) RUS Form 198, Rev. 4-04, Equipment Contract. This form is used for equipment purchases.

    * * * * *
    Start Signature

    Dated: August 17, 2004.

    Hilda Gay Legg,

    Administrator, Rural Utilities Service.

    End Signature End Supplemental Information

    [FR Doc. 04-19584 Filed 8-26-04; 8:45 am]

    BILLING CODE 3410-15-P

Document Information

Published:
08/27/2004
Department:
Rural Utilities Service
Entry Type:
Rule
Action:
Final rule.
Document Number:
04-19584
Pages:
52594-52595 (2 pages)
Topics:
Electric power, Loan programs-energy, Reporting and recordkeeping requirements, Rural areas
PDF File:
04-19584.pdf
CFR: (2)
7 CFR 1724.74
7 CFR 1726.304