05-12816. OMB Control Numbers Under the Paperwork Reduction Act  

  • Start Preamble

    AGENCY:

    Mine Safety and Health Administration (MSHA), Labor.

    ACTION:

    Technical amendment.

    Start Printed Page 37264

    SUMMARY:

    This technical amendment updates the listing of Office of Management and Budget (OMB) control numbers for MSHA's standards and regulations. We are prohibited from conducting a collection of information unless we display a currently valid OMB control number. This consolidated listing assists the public in searching for current MSHA standards and regulations that include information collection, recordkeeping, and reporting requirements approved by OMB under the Paperwork Reduction Act of 1995.

    DATES:

    Effective June 29, 2005.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Rebecca Smith, Acting Director; Office of Standards, Regulations, and Variances, MSHA; phone: 202-693-9443; FAX: 202-693-9441; e-mail: smith.rebecca@dol.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    We (MSHA) first consolidated our listing of OMB control numbers in a final rule published on June 29, 1995 (60 FR 33719). This action codified the OMB control numbers for our standards and regulations in one location to assist the public in quickly determining whether a specific information collection requirement was approved by OMB. Table 1 in 30 CFR 3.1 displays the OMB control number for each section containing a requirement for the collection, reporting, recordkeeping, or dissemination of information.

    We are prohibited from conducting a collection of information unless it displays a currently valid OMB control number, and we inform the potential responders that they are not required to respond unless the collection of information displays a currently valid OMB control number. By publishing this list, we are following the recommendation of OMB pursuant to 5 CFR 1320.3(f)(3) and 1320.5(b)(2)(ii)(C) that, even where we have already provided the above information “in a manner reasonably calculated to inform the public,” that we also “publish such information along with a table or codified section of OMB control numbers to be included in the Code of Federal Regulations.”

    This revision updates our current list of OMB control numbers to include new control numbers approved by OMB for standards and regulations completed since the last update and any changes made through the renewal of previously issued OMB control numbers. There are no substantive changes or renewals made to information collection requirements by this technical amendment.

    Information collection requirements go through the public review process, including notice and comment, as part of the rule to which they apply. Likewise, the renewal of an OMB control number also requires public review, including notice and comment. As a result, we find that it is unnecessary to have further public notice and comment and that, therefore, there is “good cause” under 5 U.S.C. 553(b)(B) of the Administrative Procedure Act (APA) to issue this technical amendment to Table 1 in 30 CFR part 3 without prior public notice and comment.

    We also determined that it is unnecessary to delay the effective date. The technical amendment contains no new requirements for which the public would need time, beyond that provided for in the regulation itself, to plan compliance. We find, therefore, there is “good cause” to except this action from the 30-day delayed effective date requirement under 5 U.S.C. 553(d)(3) of the APA.

    Start List of Subjects

    List of Subjects in 30 CFR Part 3

    • Mine safety and health
    • Reporting and recordkeeping requirements
    End List of Subjects Start Signature

    Dated: June 23, 2005.

    David G. Dye,

    Deputy Assistant Secretary of Labor for Mine Safety and Health.

    End Signature Start Amendment Part

    Accordingly, under the authority of 30 U.S.C. 957, chapter I of title 30, Code of Federal Regulations is amended as set forth below.

    End Amendment Part Start Part

    PART 3—[AMENDED]

    End Part Start Amendment Part

    1. The authority citation for part 3 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 30 U.S.C. 957; 44 U.S.C. 3501-3520.

    End Authority Start Amendment Part

    2. Amend § 3.1 by revising Table 1 to read as follows:

    End Amendment Part
    OMB control numbers.
    * * * * *

    Table 1.—OMB Control Numbers

    30 CFR citationOMB control No.
    Subchapter B—Testing, Evaluation, and Approval of Mining Products
    6.101219-0066
    7.31219-0066
    7.41219-0066
    7.61219-0066
    7.71219-0066
    7.231219-0066
    7.271219-0066
    7.281219-0066
    7.291219-0066
    7.301219-0066
    7.431219-0066
    7.461219-0066
    7.471219-0066
    7.481219-0066
    7.491219-0066
    7.511219-0066
    7.631219-0066
    7.691219-0066
    7.711219-0066
    7.831219-0119
    7.901219-0119
    7.971219-0119
    7.1051219-0119
    7.3031219-0066
    7.3061219-0066
    7.3091219-0066
    7.3111219-0066
    7.4031219-0066
    7.4071219-0066
    7.4081219-0066
    7.4091219-0066
    15.41219-0066
    15.81219-0066
    18.61219-0066
    18.151219-0066
    18.531219-0116
    18.53(h)1219-0066
    18.811219-0066
    18.821219-0066
    18.931219-0066
    18.941219-0066
    19.31219-0066
    19.131219-0066
    20.31219-0066
    20.141219-0066
    22.41219-0066
    22.111219-0066
    23.31219-0066
    23.141219-0066
    27.41219-0066
    27.61219-0066
    27.111219-0066
    28.101219-0066
    28.251219-0066
    28.301219-0066
    28.311219-0066
    33.61219-0066
    33.121219-0066
    35.61219-0066
    35.121219-0066
    36.61219-0066
    36.121219-0066
    Subchapter G—Filing and Other Administrative Requirements
    40.31219-0042
    40.51219-0042
    41.101219-0042
    41.111219-0042
    41.121219-0042
    41.201219-0042
    43.41219-0014
    43.71219-0014
    44.91219-0065
    44.101219-0065
    44.111219-0065
    45.31219-0040
    45.41219-0040
    Start Printed Page 37265
    Subchapter H—Education and Training
    46.31219-0131
    46.51219-0131
    46.61219-0131
    46.71219-0131
    46.81219-0131
    46.91219-0131
    46.111219-0131
    47.311219-0133
    47.411219-0133
    47.511219-0133
    47.711219-0133
    47.731219-0133
    48.31219-0009
    48.91219-0009
    48.231219-0009
    48.291219-0009
    49.21219-0078
    49.31219-0078
    49.41219-0078
    49.61219-0078
    49.71219-0078
    49.81219-0078
    49.91219-0078
    Subchapter I—Accidents, Injuries, Illnesses, Employment, and Production in Mines
    50.101219-0007
    50.111219-0007
    50.201219-0007
    50.301219-0007
    Subchapter K—Metal and Nonmetal Mine Safety and Health
    56.10001219-0042
    56.3203(a)1219-0121
    56.50051219-0048
    56.130151219-0089
    56.130301219-0089
    56.141001219-0089
    56.180021219-0089
    56.190221219-0034
    56.190231219-0034
    56.190571219-0049
    56.191211219-0034
    57.10001219-0042
    57.3203(a)1219-0121
    57.34611219-0097
    57.50051219-0048
    57.50371219-0003
    57.50401219-0003
    57.50471219-0039
    57.50601219-0135
    57.50651219-0135
    57.50661219-0135
    57.50671219-0135
    57.50701219-0135
    57.50711219-0135
    57.50751219-0135
    57.85201219-0016
    57.85251219-0016
    57.110531219-0046
    57.130151219-0089
    57.130301219-0089
    57.141001219-0089
    57.180021219-0089
    57.190221219-0034
    57.190231219-0034
    57.190571219-0049
    57.191211219-0034
    57.22004(c)1219-0103
    57.222041219-0030
    57.222291219-0103
    57.222301219-0103
    57.222311219-0103
    57.222391219-0103
    57.224011219-0096
    57.226061219-0095
    Subchapter M—Uniform Mine Health Regulations
    62.1101219-0120
    62.1301219-0120
    62.1701219-0120
    62.1711219-0120
    62.1721219-0120
    62.1731219-0120
    62.1741219-0120
    62.1751219-0120
    62.1801219-0120
    62.1901219-0120
    Subchapter O—Coal Mine Safety and Health
    70.201(c)1219-0011
    70.2021219-0011
    70.2041219-0011
    70.2091219-0011
    70.2201219-0011
    71.201(c)1219-0011
    71.2021219-0011
    71.2041219-0011
    71.2091219-0011
    71.2201219-0011
    71.3001219-0011
    71.3011219-0011
    71.4031219-0024
    71.4041219-0024
    72.5001219-0124
    72.5031219-0124
    72.5101219-0124
    72.5201219-0124
    75.1001219-0127
    75.153(a)(2)1219-0001
    75.1551219-0127
    75.1591219-0127
    75.1601219-0127
    75.1611219-0127
    75.204(a)1219-0121
    75.2151219-0004
    75.2201219-0004
    75.2211219-0004
    75.2221219-0004
    75.2231219-0004
    75.3101219-0088
    75.3121219-0088
    75.3421219-0088
    75.3511219-0088, -0116
    75.3601219-0088, -0044
    75.3611219-0088
    75.3621219-0088
    75.3631219-0088, -0119
    75.3641219-0088
    75.3701219-0088
    75.3711219-0088, -0119
    75.3721219-0073
    75.3731219-0073
    75.3821219-0088
    75.5121219-0116
    75.703-3(d)(11)1219-0116
    75.800-41219-0116
    75.820(b),(e)1210-0116
    75.8211219-0116
    75.900-41219-0116
    75.1001-1(c)1219-0116
    75.1100-31219-0054
    75.1103-81219-0054
    75.1103-111219-0054
    75.12001219-0073
    75.1200-11219-0073
    75.12011219-0073
    75.12021219-0073
    75.1202-11219-0073
    75.12031219-0073
    75.12041219-0073
    75.1204-11219-0073
    75.13211219-0025
    75.13271219-0025
    75.1400-21219-0034
    75.1400-41219-0034
    75.14321219-0034
    75.14331219-0034
    75.15011219-0054
    75.15021219-0054
    75.17021219-0041
    75.1712-41219-0024
    75.1712-51219-0024
    75.1713-11219-0078
    75.1714-3(e)1219-0044
    75.17161219-0020
    75.1716-11219-0020
    75.1716-31219-0020
    75.17211219-0073
    75.19011219-0119
    75.1904(b)(4)(i)1219-0119
    75.19111219-0119
    75.19121219-0119
    75.19141219-0119
    75.19151219-0119, -0124
    77.1001219-0127
    77.103(a)(2)1219-0001
    77.1051219-0127
    77.1061219-0127
    77.1071219-0127
    77.107-11219-0127
    77.2151219-0015
    77.215-21219-0015
    77.215-31219-0015
    77.215-41219-0015
    77.216-21219-0015
    77.216-31219-0015
    77.216-41219-0015
    77.216-51219-0015
    77.5021219-0116
    77.800-21219-0116
    77.900-21219-0116
    77.10001219-0026
    77.1000-11219-0026
    Start Printed Page 37266
    77.11011219-0051
    77.12001219-0073
    77.12011219-0073
    77.12021219-0073
    77.14041219-0034
    77.14321219-0034
    77.14331219-0034
    77.17021219-0078
    77.17131219-0083
    77.19001219-0019
    77.19011219-0082
    77.19061219-0034
    77.1909-11219-0025
    90.201(c)1219-0011
    90.2021219-0011
    90.2041219-0011
    90.2091219-0011
    90.2201219-0011
    90.3001219-0011
    90.3011219-0011
    End Supplemental Information

    [FR Doc. 05-12816 Filed 6-28-05; 8:45 am]

    BILLING CODE 4510-43-P

Document Information

Effective Date:
6/29/2005
Published:
06/29/2005
Department:
Mine Safety and Health Administration
Entry Type:
Rule
Action:
Technical amendment.
Document Number:
05-12816
Dates:
Effective June 29, 2005.
Pages:
37263-37266 (4 pages)
Topics:
Mine safety and health, Reporting and recordkeeping requirements
PDF File:
05-12816.pdf
CFR: (1)
30 CFR 3.1