-
Start Preamble
AGENCY:
Federal Aviation Administration (FAA), Department of Transportation (DOT).
ACTION:
Final rule.
SUMMARY:
We are adopting a new airworthiness directive (AD) for the products listed above. This AD results from mandatory continuing airworthiness information (MCAI) issued by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as:
Due to a manufacturing error, some rivets, required by drawings, were not installed in the joints between two ceiling beams and the rear pressurized bulkhead.
If left uncorrected, long term fatigue stress could locally weaken the structure, compromising the fuselage structural integrity.
We are issuing this AD to require actions to correct the unsafe condition on these products.
DATES:
This AD becomes effective November 18, 2010.
On November 18, 2010, the Director of the Federal Register approved the incorporation by reference of certain publications listed in this AD.
ADDRESSES:
You may examine the AD docket on the Internet at http://www.regulations.gov or in person at Document Management Facility, U.S. Department of Transportation, Docket Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Sarjapur Nagarajan, Aerospace Engineer, FAA, Small Airplane Directorate, 901 Locust, Room 301, Kansas City, Missouri 64106; telephone: (816) 329-4145; fax: (816) 329-4090.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Discussion
We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 to include an AD that would apply to the specified products. That NPRM was published in the Federal Register on July 23, 2010 (75 FR 43105). That NPRM proposed to correct an unsafe condition for the specified products. The MCAI states:
Due to a manufacturing error, some rivets, required by drawings, were not installed in the joints between two ceiling beams and the rear pressurized bulkhead.
If left uncorrected, long term fatigue stress could locally weaken the structure, compromising the fuselage structural integrity.
This AD requires the accomplishment of Piaggio Aero Industries (PAI) Service Bulletin (SB) 80-0268 original issue, which contains instructions to rework the affected area, thus restoring the fuselage design strength as well as the fatigue specifications of the structure.
You may obtain further information by examining the MCAI in the AD docket.
Comments
We gave the public the opportunity to participate in developing this AD. We received no comments on the NPRM or on the determination of the cost to the public.
Conclusion
We reviewed the available data and determined that air safety and the public interest require adopting the AD as proposed.
Differences Between This AD and the MCAI or Service Information
We have reviewed the MCAI and related service information and, in general, agree with their substance. But we might have found it necessary to use different words from those in the MCAI to ensure the AD is clear for U.S. operators and is enforceable. In making these changes, we do not intend to differ substantively from the information Start Printed Page 63059provided in the MCAI and related service information.
We might also have required different actions in this AD from those in the MCAI in order to follow FAA policies. Any such differences are highlighted in a NOTE within the AD.
Costs of Compliance
We estimate that this AD will affect 6 products of U.S. registry. We also estimate that it will take about 30 work-hours per product to comply with the basic requirements of this AD. The average labor rate is $85 per work-hour. Required parts will cost about $100 per product.
Based on these figures, we estimate the cost of this AD to the U.S. operators to be $15,900 or $2,650 per product.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to issue rules on aviation safety. Subtitle I, section 106, describes the authority of the FAA Administrator. “Subtitle VII: Aviation Programs,” describes in more detail the scope of the Agency's authority.
We are issuing this rulemaking under the authority described in “Subtitle VII, Part A, Subpart III, Section 44701: General requirements.” Under that section, Congress charges the FAA with promoting safe flight of civil aircraft in air commerce by prescribing regulations for practices, methods, and procedures the Administrator finds necessary for safety in air commerce. This regulation is within the scope of that authority because it addresses an unsafe condition that is likely to exist or develop on products identified in this rulemaking action.
Regulatory Findings
We determined that this AD will not have federalism implications under Executive Order 13132. This AD will not have a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government.
For the reasons discussed above, I certify this AD:
(1) Is not a “significant regulatory action” under Executive Order 12866;
(2) Is not a “significant rule” under DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); and
(3) Will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act.
We prepared a regulatory evaluation of the estimated costs to comply with this AD and placed it in the AD Docket.
Examining the AD Docket
You may examine the AD docket on the Internet at http://www.regulations.gov;; or in person at the Docket Management Facility between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. The AD docket contains the NPRM, the regulatory evaluation, any comments received, and other information. The street address for the Docket Office (telephone (800) 647-5527) is in the ADDRESSES section. Comments will be available in the AD docket shortly after receipt.
Start List of SubjectsList of Subjects in 14 CFR Part 39
- Air transportation
- Aircraft
- Aviation safety
- Incorporation by reference
- Safety
Adoption of the Amendment
Start Amendment PartAccordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows:
End Amendment Part Start PartPART 39—AIRWORTHINESS DIRECTIVES
End Part Start Amendment Part1. The authority citation for part 39 continues to read as follows:
End Amendment Part[Amended]2. The FAA amends § 39.13 by adding the following new AD:
End Amendment Part2010-21-14 PIAGGIO AERO INDUSTRIES S.p.A: Amendment 39-16474; Docket No. FAA-2010-0734; Directorate Identifier 2010-CE-036-AD.
Effective Date
(a) This airworthiness directive (AD) becomes effective November 18, 2010.
Affected ADs
(b) None.
Applicability
(c) This AD applies to PIAGGIO AERO INDUSTRIES S.p.A Model PIAGGIO P-180 airplanes, serial numbers 1166 through 1175, certificated in any category.
Subject
(d) Air Transport Association of America (ATA) Code 53: Fuselage.
Reason
(e) The mandatory continuing airworthiness information (MCAI) states:
Due to a manufacturing error, some rivets, required by drawings, were not installed in the joints between two ceiling beams and the rear pressurized bulkhead.
If left uncorrected, long term fatigue stress could locally weaken the structure, compromising the fuselage structural integrity.
This AD requires the accomplishment of Piaggio Aero Industries (PAI) Service Bulletin (SB) 80-0268 original issue, which contains instructions to rework the affected area, thus restoring the fuselage design strength as well as the fatigue specifications of the structure.
Actions and Compliance
(f) Unless already done, within 200 hours time-in-service (TIS) after November 18, 2010 (the effective date of this AD), replace the rivets of the joint brackets on the right-hand and left-hand beam with “Hi-Lok” fasteners, following the accomplishment instructions of PIAGGIO AERO INDUSTRIES S.p.A. Service Bulletin (Mandatory) N.: 80-0268, REV. 0, dated December 18, 2008.
FAA AD Differences
Note:
This AD differs from the MCAI and/or service information as follows: No differences.
Other FAA AD Provisions
(g) The following provisions also apply to this AD:
(1) Alternative Methods of Compliance (AMOCs): The Manager, Standards Office, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. Send information to ATTN: Sarjapur Nagarajan, Aerospace Engineer, FAA, Small Airplane Directorate, 901 Locust, Room 301, Kansas City, Missouri 64106; telephone: (816) 329-4145; fax: (816) 329-4090; e-mail: sarjapur.nagarajan@faa.gov. Before using any approved AMOC on any airplane to which the AMOC applies, notify your appropriate principal inspector (PI) in the FAA Flight Standards District Office (FSDO), or lacking a PI, your local FSDO.
(2) Airworthy Product: For any requirement in this AD to obtain corrective actions from a manufacturer or other source, use these actions if they are FAA-approved. Corrective actions are considered FAA-approved if they are approved by the State of Design Authority (or their delegated agent). You are required to assure the product is airworthy before it is returned to service.
(3) Reporting Requirements: For any reporting requirement in this AD, under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.), the Office of Management and Budget (OMB) has approved the information collection requirements and has assigned OMB Control Number 2120-0056.
Related Information
(h) Refer to MCAI European Aviation Safety Agency (EASA) AD No.: 2010-0126, dated June 23, 2010; and PIAGGIO AERO INDUSTRIES S.p.A. Service Bulletin (Mandatory) N.: 80-0268, REV. 0, dated December 18, 2008, for related information.
Material Incorporated by Reference
(i) You must use PIAGGIO AERO INDUSTRIES S.p.A. Service Bulletin (Mandatory) N.: 80-0268, REV. 0, dated December 18, 2008, to do the actions Start Printed Page 63060required by this AD, unless the AD specifies otherwise.
(1) The Director of the Federal Register approved the incorporation by reference of this service information under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) For service information identified in this AD, contact Piaggio Aero Industries S.p.a., Via Cibrario, 4-16154 Genoa, Italy; phone: +39 010 6481 353; fax: +39 010 6481 881; e-mail: airworthiness@piaggioaero.it; Internet: http://www.piaggioaero.com.
(3) You may review copies of the service information incorporated by reference for this AD at the FAA, Central Region, Office of the Regional Counsel, 901 Locust, Kansas City, Missouri 64106. For information on the availability of this material at the Central Region, call (816) 329-3768.
(4) You may also review copies of the service information incorporated by reference for this AD at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call (202) 741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
Start SignatureIssued in Kansas City, Missouri, on September 30, 2010.
John R. Colomy,
Acting Manager, Small Airplane Directorate, Aircraft Certification Service.
[FR Doc. 2010-25284 Filed 10-13-10; 8:45 am]
BILLING CODE 4910-13-P
Document Information
- Comments Received:
- 0 Comments
- Effective Date:
- 11/18/2010
- Published:
- 10/14/2010
- Department:
- Federal Aviation Administration
- Entry Type:
- Rule
- Action:
- Final rule.
- Document Number:
- 2010-25284
- Dates:
- This AD becomes effective November 18, 2010.
- Pages:
- 63058-63060 (3 pages)
- Docket Numbers:
- Docket No. FAA-2010-0734 Directorate Identifier 2010-CE-036-AD, Amendment 39-16474, AD 2010-21-14
- RINs:
- 2120-AA64: Airworthiness Directives
- RIN Links:
- https://www.federalregister.gov/regulations/2120-AA64/airworthiness-directives
- Topics:
- Air transportation, Aircraft, Aviation safety, Incorporation by reference, Safety
- PDF File:
- 2010-25284.pdf
- CFR: (1)
- 14 CFR 39.13