2010-29582. Central Utah Project Completion Act  

  • Start Preamble

    AGENCY:

    Department of the Interior, Office of the Assistant Secretary—Water and Science.

    ACTION:

    Notice of availability of the Finding of No Significant Impact (FONSI) and associated Final Environmental Assessment (EA)—Realignment of a Portion of the Utah Lake Drainage Basin Water Delivery System.

    SUMMARY:

    On November 15, 2010, the Department of the Interior (Interior), signed a FONSI associated with the Final EA—Realignment of a Portion of the Utah Lake Drainage Basin Water Delivery System. Interior has determined that the proposed action as detailed in the FONSI will not have a significant impact on the quality of the human environment, and that an environmental impact statement is not required.

    ADDRESSES:

    Copies of the EA and FONSI are available for inspection at:

    • Central Utah Water Conservancy District, 355 West University Parkway, Orem, Utah 84058-7303.
    • Department of the Interior, Central Utah Project Completion Act Office, 302 East 1860 South, Provo, Utah 84606.

    The documents are also available at http://www.cuwcd.com and http://www.cupcao.gov.

    Start Further Info

    FOR FURTHER INFORMATION:

    Contact Mr. Lee Baxter, Central Utah Project Completion Act Office, 302 East 1860 South, Provo, Utah 84606; (801) 379-1174; e-mail at lbaxter@uc.usbr.gov.

    Start Signature

    Date: November 17, 2010.

    Reed R. Murray,

    Program Director, Central Utah Project Completion Act, Department of the Interior.

    End Signature End Further Info End Preamble

    [FR Doc. 2010-29582 Filed 11-23-10; 8:45 am]

    BILLING CODE 4310-RK-P

Document Information

Published:
11/24/2010
Department:
Interior Department
Entry Type:
Notice
Action:
Notice of availability of the Finding of No Significant Impact (FONSI) and associated Final Environmental Assessment (EA)--Realignment of a Portion of the Utah Lake Drainage Basin Water Delivery System.
Document Number:
2010-29582
Dates:
November 17, 2010. Reed R. Murray, Program Director, Central Utah Project Completion Act, Department of the Interior. [FR Doc. 2010-29582 Filed 11-23-10; 8:45 am] BILLING CODE 4310-RK-P
Pages:
71726-71726 (1 pages)
PDF File:
2010-29582.pdf