2011-31292. Arkansas Regulatory Program and Abandoned Mine Land Reclamation Plan  

  • Start Preamble Start Printed Page 76104

    AGENCY:

    Office of Surface Mining Reclamation and Enforcement, Interior.

    ACTION:

    Proposed rule; public comment period on proposed amendment.

    SUMMARY:

    We, the Office of Surface Mining Reclamation and Enforcement (OSM), are announcing receipt of a proposed amendment to the Arkansas regulatory program (Arkansas program) and the Arkansas abandoned mine land reclamation plan (Arkansas plan) under the Surface Mining Control and Reclamation Act of 1977 (SMCRA or the Act). Arkansas proposes to revise substantial portions of their regulatory program and abandoned mine land plan, make grammatical changes, correct punctuation, revise dates, and add citations. The proposed amendment consists of substantive changes to Arkansas regulations regarding Subchapter A—General Requirements; Subchapter G—Surface Coal Mining and Reclamation Operations Permits and Coal Exploration Procedures Systems; Subchapter J—Bond and Insurance Requirements for Surface Coal Mining and Reclamation Operations; Subchapter K—State Program Performance Standards; Subchapter M—Training Programs for Blasters and Members of Blasting Crews, and Certification Programs for Blasters; and Subchapter R—Abandoned Mine Land Reclamation.

    This document provides the times and locations that the Arkansas program, Arkansas plan, and the proposed amendment are available for your inspection, the comment period during which you may submit written comments on the amendment, and the procedures that we will follow for the public hearing, if one is requested.

    DATES:

    We will accept written comments on this amendment until 4 p.m., c.s.t., January 5, 2012. If requested, we will hold a public hearing on the amendment on January 3, 2012. We will accept requests to speak at a hearing until 4 p.m., c.s.t. on December 21, 2011.

    ADDRESSES:

    You may submit comments, identified by SATS No. AR-039-FOR, by any of the following methods:

    • Mail/Hand Delivery: Alfred L. Clayborne, Director, Tulsa Field Office, Office of Surface Mining Reclamation and Enforcement, 1645 South 101st East Avenue, Suite 145, Tulsa, Oklahoma 74128-4629.
    • Fax: (918) 581-6419.
    • Federal eRulemaking Portal: The amendment has been assigned Docket ID OSM-2011-0016. If you would like to submit comments go to http://www.regulations.gov. Follow the instructions for submitting comments.

    Instructions: All submissions received must include the agency name and docket number for this rulemaking. For detailed instructions on submitting comments and additional information on the rulemaking process, see the Public Comment Procedures heading of the SUPPLEMENTARY INFORMATION section of this document.

    Docket: For access to the docket to review copies of the Arkansas regulations, this amendment, a listing of any scheduled public hearings, and all written comments received in response to this document, you must go to the address listed below during normal business hours, Monday through Friday, excluding holidays. You may receive one free copy of the amendment by contacting OSM's Tulsa Field Office; or you can view the full text of the program amendment available for you to read at http://www.regulations.gov.

    Alfred L. Clayborne, Director, Tulsa Field Office, Office of Surface Mining Reclamation and Enforcement, 1645 South 101st East Avenue, Suite 145, Tulsa, Oklahoma 74128-4629. Telephone: (918) 581-6430.

    In addition, you may review a copy of the amendment during regular business hours at the following location:

    Arkansas Department of Environmental Quality, 5301 Northshore Drive, North Little Rock, Arkansas 72118-5317. Telephone: (501) 682-0744.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Alfred L. Clayborne, Director, Tulsa Field Office. Telephone: (918) 581-6430. Email: aclayborne@osmre.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. Background on the Arkansas Program

    II. Description of the Proposed Amendment

    III. Public Comment Procedures

    IV. Procedural Determinations

    I. Background on the Arkansas Program

    Section 503(a) of the Act permits a State to assume primacy for the regulation of surface coal mining and reclamation operations on non-Federal and non-Indian lands within its borders by demonstrating that its program includes, among other things, “a State law which provides for the regulation of surface coal mining and reclamation operations in accordance with the requirements of this Act * * *; and rules and regulations consistent with regulations issued by the Secretary pursuant to this Act.” See 30 U.S.C. 1253(a)(1) and (7). On the basis of these criteria, the Secretary of the Interior (Secretary) conditionally approved the Arkansas program effective November 21, 1980. You can find background information on the Arkansas program, including the Secretary's findings, the disposition of comments, and the conditions of approval of the Arkansas program in the November 21, 1980, Federal Register (45 FR 77003). You can find later actions on the Arkansas program at 30 CFR 904.10, 904.12, 904.15.

    The Abandoned Mine Land Reclamation Program was established by Title IV of the Act in response to concerns over extensive environmental damage caused by past coal mining activities. The program is funded by a reclamation fee collected on each ton of coal that is produced. The money collected is used to finance the reclamation of abandoned coal mines and for other authorized activities. Section 405 of the Act allows States and Indian Tribes to assume exclusive responsibility for reclamation activity within the State or on Indian lands if they develop and submit to the Secretary of the Interior for approval, a program (often referred to as a plan) for the reclamation of abandoned coal mines. On the basis of these criteria, the Secretary of the Interior approved the Arkansas plan on May 2, 1983. You can find background information on the Arkansas plan, including the Secretary's findings, the disposition of comments, and the approval of the plan in the May 2, 1983, Federal Register (48 FR 19710). You can find later actions concerning the Arkansas plan at 30 CFR 904.25 and 904.26.

    II. Description of the Proposed Amendment

    By letter dated August 26, 2011 (Administrative Record No. AR-571.06), Arkansas submitted a proposed amendment to its program and plan pursuant to SMCRA. Arkansas submitted the amendment in response to a September 30, 2009 (Administrative Record No. AR-571), letter from OSM in accordance with 30 CFR 732.17(c). Arkansas is also making substantial changes to other sections of its regulatory program and its abandoned mine land plan on its own initiative. The full text of the program amendment is available for you to read at the Start Printed Page 76105locations listed above under ADDRESSES or at http://www.regulations.gov.

    Arkansas proposes to revise every section title throughout its code by replacing “Section” with “Reg.20.” and by deleting the title dates. Arkansas also plans to replace the references to “Section” with “Reg.20.,” replace the word “Director” with “Department,” and replace the word “Chapter” with “Code” throughout their regulations.

    Arkansas proposes to revise substantial portions of their regulatory program and abandoned mine land plan, make grammatical changes, correct punctuation, revise dates, and add citations. The Arkansas regulations that contain substantive changes are listed in the table below.

    Substantive Changes Table

    Arkansas Reg. 20. SectionsTitle
    SUBCHAPTER A—GENERAL PART 700—GENERAL
    700.11, 700.12, and 700.16Rulemaking Initiated by the Commission; Petitions to Initiate Rulemaking; and Employee Protection.
    PART 701—STATE PROGRAM
    701.5Definitions.
    PART 702—EXEMPTION FOR COAL EXTRACTION INCIDENTAL TO THE EXTRACTION OF OTHER MINERALS
    702.13Public Availability of Information.
    PART 705—RESTRICTIONS ON FINANCIAL INTERESTS OF ENFORCEMENT PERSONNEL
    705.1Scope.
    PART 762—CRITERIA FOR DESIGNATING AREAS AS UNSUITABLE FOR SURFACE COAL MINING OPERATIONS
    762.5Definition.
    SUBCHAPTER G—SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION PROCEDURES SYSTEMS
    PART 770—GENERAL
    770.5Definitions.
    PART 771—GENERAL REQUIREMENTS FOR PERMITS AND APPLICATIONS
    771.25Permit Fees.
    PART 776—GENERAL REQUIREMENTS FOR COAL EXPLORATION OPERATIONS
    776.17Public Availability of Information.
    PART 778—SURFACE MINING PERMIT APPLICATIONS—MINIMUM REQUIREMENTS FOR LEGAL, FINANCIAL, COMPLIANCE AND RELATED INFORMATION
    778.1, 778.2, 778.4, 778.6, 778.9, 778.11, 778.12, 778.13, 778.14, 778.17, 778.20, 778.21, and 778.22Scope; Objectives; Responsibility; Applicability, Certifying and Updating Existing Permit Application Information; Applicant and Operator Information; Permit History Information; Property Interest Information; Violation Information; Permit Term Information; Identification of Location of Public Office for Filing of Application; Newspaper Advertisement and Proof of Publication; and Facilities or Structures Used in Common.
    PART 782—UNDERGROUND MINING PERMIT APPLICATIONS—MINIMUM REQUIREMENTS FOR LEGAL, FINANCIAL, COMPLIANCE, AND RELATED INFORMATION
    782.1-782.21Scope; Objectives; Responsibilities; Applicability; Identification of Interests; Compliance Information; Right of Entry and Operation Information; Relationship to Areas Designated Unsuitable For Mining; Permit Term Information; Personal Injury and Property Damage Insurance Information; Identification of Other Licenses and Permits; Identification of Location of Public Office for Filing of Application; and Newspaper Advertisement and Proof of Publication.
    PART 785—REQUIREMENTS FOR PERMITS FOR SPECIAL CATEGORIES OF MINING
    785.14, 785.16, 785.18, and 785.25Mountaintop Removal Mining; Permits Incorporating Variances from Approximate Original Contour Restoration Requirements for Steep Slope Mining; Variances for Delay in Contemporaneous Reclamation Requirements in Combined Surface and Underground Mining Operations; and Lands Eligible for Remining.
    Start Printed Page 76106
    PART 786—REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING
    786.1, and 786.3-786.31Scope; Responsibilities; Pre-Application Conference; Regulatory Coordination with Requirements under Other Laws; Public Participation in Permit Processing; Review of Permit Applications; General Provisions for Review of Permit Application Information and Entry of Information into AVS; Review of Applicant, Operator, and Ownership and Control Information; Review of Permit History; Review of Compliance History; Permit Eligibility Determination; Unanticipated Events or Conditions at Remining Sites; Eligibility for Provisionally Issued Permits; Written Findings for Permit Application Approval; Performance Bond Submittal; Permit Conditions; Permit Issuance and Right of Renewal; Initial Review and Finding Requirements for Improvidently Issued Permits; Notice Requirements for Improvidently Issued Permits; Suspension or Rescission Requirements for Improvidently Issued Permits; Eligibility to Challenge Ownership or Control Listings and Findings; Procedures for Challenging an Ownership or Control Listing or Finding; Burden of Proof for Ownership or Control Challenges; Written Decision on Challenges to Ownership or Control Listings or Findings; Conditions of Permits: Environment, Public Health, and Safety; Improvidently Issued Permits: General Procedures; and Improvidently Issued Permits: Recision Procedures.
    787.12Judicial Review.
    PART 788—REVISION; RENEWAL; TRANSFER, ASSIGNMENT, OR SALE OF PERMIT RIGHTS; POST-PERMIT ISSUANCE REQUIREMENTS; AND OTHER ACTIONS BASED ON OWNERSHIP, CONTROL, AND VIOLATION INFORMATION
    788.5, 788.9, 788.10, 788.11, 788.13, 788.14, 788.15, 788.16, 788.17, 788.18, and 788.19Definitions; Post-Permit Issuance Requirements and Other Actions Based on Ownership, Control, and Violation Information; Post-Permit Issuance Requirements for Permittees; Review of Permits; Permit Renewals: General Permit Renewals: Completed Applications; Permit Renewals: Terms; Permit Renewals: Approval or Denial; Transfer, Assignment, or Sale of Permit Rights, Transfer, Assignments, or Sale of Permit Rights; Transfer, Assignments, or Sale of Permit Rights: Obtaining Approval; and Requirements for New Permits for Persons Succeeding to Rights Granted Under a Permit.
    SUBCHAPTER J—BOND AND INSURANCE REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS
    PART 800—BONDS AND INSURANCE REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS UNDER THE STATE PROGRAM
    800.23 and 800.40Self-bonding; and Requirement to Release Performance Bonds.
    SUBCHAPTER K—STATE PROGRAM PERFORMANCE STANDARDS
    PART 810—STATE PROGRAM PERFORMANCE STANDARDS GENERAL
    810.11Applicability.
    PART 816—PERMANENT PROGRAM PERFORMANCE STANDARDS—SURFACE MINING ACTIVITIES
    816.11, 816.13, 816.14, 816.22, 816.41, 816.42, 816.43, 816.44, 816.46, 816.48, 816.49, 816.50-S, 816.50-U, 816.51-S, 816.52-S, 816.53, 816.54, 816. 55, 816.61-U, 816.64-U, 816.68, 816.71, 816.100, 816.101-S, 816.101-U, 816.102, 816.106, 816.107, 816.113, 816.114, 816.116, 816.121-U, 816.122-U, 816.133, 816.180, and 816.181Signs and Markers; Casing and Sealing of Drilled Holes General Requirements; Casing and Sealing of Drilled Holes: Temporary; Topsoil and Subsoil; Hydrologic Balance: Protection; Hydrologic Balance: Water Quality Standards and Effluent Limitations; Hydrologic Balance: Diversions; Hydrologic Balance: Stream Channel Diversions; Hydrologic Balance: Siltation Structure; Hydrologic Balance: Acid-forming and Toxic-forming Spoil; Impoundments, Hydrologic Balance: Ground Water Protection; Hydrologic Balance: Underground Mine Entry and Access Discharges; Hydrologic Balance: Protection of Groundwater Recharge Capacity; Hydrologic Balance: Surface And Groundwater Monitoring; Hydrologic Balance: Transfer Of Wells; Hydrologic Balance: Water Rights and Replacement; Hydrologic Balance: Discharge of Water into an Underground Mine; Use of Explosives: General Requirements; Use of Explosives: Public Notice of Blasting Schedule; Use of Explosives: Records of Blasting Operations; Disposal of Excess Spoil: General Requirements; Contemporaneous Reclamation; Backfilling and Grading: Time and Distance Requirements; Backfilling and Grading: General Requirements; Backfilling and Grading: General Grading Requirements; Backfilling and Grading: Previously Mined Areas; Backfilling and Grading: Steep Slopes; Revegetation: Timing; Revegetation: Mulching and Other Soil Stabilizing Practices; Revegetation: Standards for Success; Subsidence Control: General Requirements; Subsidence Control: Public Notice; Postmining Land Use; Utility Installations; and Support Facilities.
    Start Printed Page 76107
    PART 817—PERMANENT PROGRAM PERFORMANCE STANDARDS —UNDERGROUND MINING ACTIVITIES
    817.1-817.181Scope; Objectives; Signs and Markers; Casing and Sealing of Exposed Underground Openings: General Requirements; Casing and Sealing of Underground Openings: Temporary; Casing and Sealing of Underground Openings: Permanent; Topsoil and Subsoil; Hydrologic Balance: Protection; Hydrologic Balance: Water Quality Standards and Effluent Limitations; Hydrologic Balance: Diversions; Hydrologic Balance: Sediment Control Measures; Hydrologic Balance: Siltation Structures; Hydrologic Balance: Discharge Structures; Impoundments Hydrologic Balance: Postmining Rehabilitation of Sedimentation Ponds, Diversions, Impoundments, and Treatment Facilities; Hydrologic Balance: Surface Activities in or Adjacent to Perennial or Intermittent Streams; Coal Recovery; Use of Explosives: General Requirements; Use of Explosives: Pre-blasting Survey; Use of Explosives: Public Notice of Blasting Schedule; Use of Explosives: Blasting Signs, Warnings, and Access Control; Use of Explosives: Control of Adverse Effects; Use of Explosives: Seismographic Measurements; Use of Explosives: Records of Blasting Operations; Disposal of Excess Spoil: General Requirements; Disposal of Excess Spoil: Valley Fills/Head-of Hollow Fills; Disposal of Excess Spoil: Durable Rock Fills; Disposal of Excess Spoil: Pre-Existing Benches; Coal Mine Waste: General Requirements; Coal Mine Waste: Refuse Piles; Coal Mine Waste: Impounding Structures; Coal Mine Waste: Burning and Burned Waste Utilization; Disposal of Noncoal Mine Wastes; Stabilization of Surface Areas; Protection of Fish, Wildlife, and Related Environmental Values; Slides and Other Damage; Contemporaneous Reclamation; Backfilling and Grading: General Requirements; Backfilling and Grading: Previously Mined Areas; Backfilling and Grading: Steep Slopes; Revegetation: General Requirements; Revegetation: Timing; Revegetation: Mulching and Other Soil Stabilizing Practices; Revegetation: Standards for Success; Subsidence Control: General Requirements; Subsidence Control: Public Notice; Cessation of Operations: Temporary; Cessation of Operations: Permanent; Postmining Land Use; Roads: General; Roads: Primary Roads; Utility Installations; and Support Facilities.
    PART 818—SPECIAL STATE PROGRAM PERFORMANCE STANDARDS—CONCURRENT SURFACE AND UNDERGROUND MINING
    818.1-818.15Scope; Objective; Responsibilities; Applicability; Compliance with Variance; and Additional Performance Standards.
    PART 819—SPECIAL STATE PROGRAM PERFORMANCE STANDARDS—AUGER MINING
    819.11, 819.1, 819.15, 819.17, 819.19, and 819.21Auger Mining; Auger Mining: Coal Recovery; Auger Mining: Hydrologic Balance; Auger Mining: Subsidence Protection; Auger Mining: Backfilling and Grading; and Auger Mining: Protection of Underground Mining.
    PART 823—SPECIAL STATE PROGRAM PERFORMANCE STANDARDS—OPERATIONS ON PRIME FARMLAND
    823.15Revegetation and Restoration of Soil Productivity.
    PROCEDURES PART 842—INSPECTIONS
    842.11Inspections
    PART 843—ENFORCEMENT
    843.11, 843.15, and 843.16Cessation Orders; Informal Public Hearing; and Formal Review of Citations
    PART 845—CIVIL PENALTIES
    845.11, 845.13, 845.15, 845.17, 845.18, 845.19, and 845.20How Assessments are Made; Point System for Penalties; Assessment of Separate Violations for Each Day; Procedures for Assessment of Civil Penalties; Procedures for Assessment Conference; Request for Adjudicatory Public Hearing; and Final Assessment and Payment of Penalty.
    PART 846—INDIVIDUAL CIVIL PENALTIES
    846.5, 846.14, 846.17, and 846.18Definitions; Amount of Individual Civil Penalty; Procedure for Assessment of Individual Civil Penalty; and Payment of Penalty.
    PART 847—ALTERNATIVE ENFORCEMENT
    847.1-847.16Scope; General Provisions; Criminal Penalties; and Civil Actions for Relief.
    Start Printed Page 76108
    SUBCHAPTER M—TRAINING PROGRAMS FOR BLASTERS AND MEMBERS OF BLASTING CREWS, AND CERTIFICATION PROGRAMS FOR BLASTERS
    PART 850—PROGRAMS
    850.16Reciprocity.
    SUBCHAPTER R—ABANDONED MINE LAND RECLAMATION
    PART 874—GENERAL RECLAMATION REQUIREMENTS
    874.12, 874.13, and 874.16Eligible Lands and Water; Reclamation Objectives and Priorities; and Contractor Eligibility.
    PART 877—RIGHTS OF ENTRY
    877.11, 877.12, 877.13, and 877.14Consent to Entry; Entry for Studies or Exploration; Entry and Consent to Reclaim; and Entry for Emergency Reclamation.
    PART 879—ACQUISITION, MANAGEMENT AND DISPOSITION OF LANDS AND WATER
    879.11, 879.12, 879.13, and 879.15Land Eligible for Acquisition; Procedures for Acquisition; Acceptance of Gifts of Land; and Disposition of Reclaimed Lands.
    PART 882—RECLAMATION ON PRIVATE LAND
    882.13Liens.
    PART 900—PROCEDURES FOR HEARING AND APPEALS
    900.2, 900.3, 900.4, 900.5, 900.6, 900.7, 900.9, and 900.12Filing of Documents; Form of Documents; Service and Proof of Service; Intervention, Voluntary Dismissal; Motions; Advancement of Proceedings; and Other Procedures.
    PART—920 ADJUDICATORY HEARINGS
    920.1, 920.2, 920.3, 920.7, and 920.8Presiding Officers; Powers of Presiding Officers; Notice of Hearing; Initial Orders and Decisions; and Effect of Initial Order or Decision.
    PART 930—DISCOVERY
    930.1Discovery.
    PART 940—TEMPORARY AND EXPEDITED REVIEW
    940.3Procedures for Expedited Review.
    PART 960—APPEALS
    960.2-960.7Appeals: How Taken; Answer; Stay Pending Appeal; Certified Transcript; Record on Appeal; and Extended Time for Appeals.

    III. Public Comment Procedures

    Under the provisions of 30 CFR 732.17(h), we are seeking your comments on whether Arkansas's proposed amendment satisfies the applicable program approval criteria of 30 CFR 732.15. If we approve the amendment, it will become part of Arkansas State program.

    Under the provisions of 30 CFR 884.15(a), we are requesting comments on whether the amendment satisfies the applicable State reclamation plan approval criteria of 30 CFR 884.14. If we approve the amendment, it will become part of the Arkansas plan.

    Electronic or Written Comments

    If you submit written comments, they should be specific, confined to issues pertinent to the proposed regulations, and explain the reason for any recommended change(s). We appreciate any and all comments, but those most useful and likely to influence decisions on the final regulations will be those that either involve personal experience or include citations to and analyses of SMCRA, its legislative history, its implementing regulations, case law, other pertinent State or Federal laws or regulations, technical literature, or other relevant publications.

    We cannot ensure that comments received after the close of the comment period (see DATES) or sent to an address other than those listed (see ADDRESSES) will be included in the docket for this rulemaking and considered.

    Public Availability of Comments

    Before including your address, phone number, email address, or other personal identifying information in your comment, you should be aware that your entire comment—including your personal identifying information—may be made publicly available at any time. While you can ask us in your comment to withhold your personal identifying Start Printed Page 76109information from public review, we cannot guarantee that we will be able to do so.

    Public Hearing

    If you wish to speak at the public hearing, contact the person listed under FOR FURTHER INFORMATION CONTACT by 4 p.m., c.s.t. on December 21, 2011. If you are disabled and need reasonable accommodations to attend a public hearing, contact the person listed under FOR FURTHER INFORMATION CONTACT. We will arrange the location and time of the hearing with those persons requesting the hearing. If no one requests an opportunity to speak, we will not hold a hearing.

    To assist the transcriber and ensure an accurate record, we request, if possible, that each person who speaks at the public hearing provide us with a written copy of his or her comments. The public hearing will continue on the specified date until everyone scheduled to speak has been given an opportunity to be heard. If you are in the audience and have not been scheduled to speak and wish to do so, you will be allowed to speak after those who have been scheduled. We will end the hearing after everyone scheduled to speak and others present in the audience who wish to speak, have been heard.

    Public Meeting

    If only one person requests an opportunity to speak, we may hold a public meeting rather than a public hearing. If you wish to meet with us to discuss the amendment, please request a meeting by contacting the person listed under FOR FURTHER INFORMATION CONTACT. All such meetings are open to the public and, if possible, we will post notices of meetings at the locations listed under ADDRESSES. We will make a written summary of each meeting a part of the administrative record.

    IV. Procedural Determinations

    Executive Order 12866—Regulatory Planning and Review

    This rule is exempted from review by the Office of Management and Budget (OMB) under Executive Order 12866.

    Other Laws and Executive Orders Affecting Rulemaking

    When a State submits a program amendment to OSM for review, our regulations at 30 CFR 732.17(h) require us to publish a notice in the Federal Register indicating receipt of the proposed amendment, its text or a summary of its terms, and an opportunity for public comment. We conclude our review of the proposed amendment after the close of the public comment period and determine whether the amendment should be approved, approved in part, or not approved. At that time, we will also make the determinations and certifications required by the various laws and executive orders governing the rulemaking process and include them in the final rule.

    Start List of Subjects

    List of Subjects in 30 CFR Part 904

    • Intergovernmental relations
    • Surface mining
    • Underground mining
    End List of Subjects Start Signature

    Dated: October 14, 2011.

    Ervin J. Barchenger,

    Regional Director, Mid-Continent Region.

    End Signature End Supplemental Information

    [FR Doc. 2011-31292 Filed 12-5-11; 8:45 am]

    BILLING CODE 4310-05-P

Document Information

Comments Received:
0 Comments
Published:
12/06/2011
Department:
Surface Mining Reclamation and Enforcement Office
Entry Type:
Proposed Rule
Action:
Proposed rule; public comment period on proposed amendment.
Document Number:
2011-31292
Dates:
We will accept written comments on this amendment until 4 p.m., c.s.t., January 5, 2012. If requested, we will hold a public hearing on the amendment on January 3, 2012. We will accept requests to speak at a hearing until 4 p.m., c.s.t. on December 21, 2011.
Pages:
76104-76109 (6 pages)
Docket Numbers:
SATS No. AR-039-FOR, Docket ID: OSM-2011-0016
Topics:
Intergovernmental relations, Surface mining, Underground mining
PDF File:
2011-31292.pdf
CFR: (1)
30 CFR 904